Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹89.3 LAccepted-AOC | L1 | Accepted-AOC l1 | |
| 2 | L2₹92.9 L+₹3.7 L (4.13%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹91.7 L
EMD Value
₹92,000
Closing Date
12 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
Project Director, DRDA Tenkasi
Improvements of 2 Nos Road in Sankarankovil Panchayat Union in Tenkasi District - MGSMT 2022-23 Package No.13
2023_RDTN_330565_5
COLRD/2128/2022-23-A5 MGSMT-25 Percentage
Open Tender
Civil Works
Works
90 days
Tenkasi
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹92,000
11 Aug 2023
30 Jun 2023
12 Jul 2023
30 Jun 2023
12 Jul 2023
5 Jul 2023
Amount
1.Strengthening of Sankarankovil - Udappankulam road to Elavankulam Road in Sankarankovil Panchayat Union(0/0 to 0/720 ) Tenkasi District.
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete.
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete.
Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete as per standard specifications.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Premeasurement for Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Premeasurement for Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I . Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803
Provision for Hectametre stone of size 0.75mx0.23mx0.10m
a. 60 cm Equilateral triangle cautionary signboard
Provision for Toe Wall
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete.
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
STRENGTHENING TO THE PULIYAMPATTI-BHARATHI NAGAR ROAD KM 0/0 - 1/500 (R41) IN SANKARANKOVIL BLOCK
Clearing and Grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including and disposal of top Organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201,(i) (A) - Scrub Jungle Clearance
Earthwork excavation for Road work in all Soils with Hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with a lift upto 1.50m and lead upto 1000m as per Technical specification Clause 302.3
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction as per Technical specification Clause
Picking the Exisiting Bituminous/Water Bound Macadam surface to a depth of 100mm by Mechanical means and addition of deficit aggregate @ 50% for Construction of Granular sub base by providing well graded material, spreading in uniform layers with standard bed camber on prepared surface, and compacting with Vibratory roller to achieve the desired density.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and applying Prime Coat with Bitumen Emulsion (SS-1) using Emulsion distributor at the rate of 0.70 kg per sqm on the prepared Granular surface (Wet Mix Moisture/ Wet Mix Macadam layer) treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. (ii)
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using Emulsion distributor at the rate of 0.25 kg per sqm on the prepared Granular surface (Water Bound Macadam Gr III layer/Wet Mix Macadam Layer) treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. (ii)
Providing and laying Bituminous Macadam based on job mix formula mixed in hot mix plant of drum type in one layer for overlay as shown in drawing using paving Bitumen 60/70 penetration grade as per IS 73 and aggregates conforming to grading with 37.00 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete..
Providing and laying Bituminous Concrete based on job mix formula mixed in hot mix plant of drum type in one layer for overlay as shown in drawing using paving Bitumen 60/70 penetration grade as per IS 73 and aggregates conforming to grading with 50.30 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete.
Provision for KM stone at each Kilometer - 1000m (regular intervals) as per standard dimensions and specifications mentioned in the departmental specifications etc., complete
Provision for HM stone at each Furlong/Hectameter - 200m (regular intervals) as per standard dimensions and specifications mentioned in the departmental specifications etc., complete
Providing and laying of Hot applied Thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc., complete as per MORT&H specification No.803. - Road Marking with Hot applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface.
CONSTRUCTION OF TOE WALL
Earthwork excavation in all clauses of Soils and Subsoils except hard rock requiring blasting including Shoring, Strutting and dressing the excavation upto sill level to maintain the foundation width as per the specifications SS 20B etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBGS metal laid in layers not more than 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing ,laying,compacting and curing etc complete., For Foundation - Base Concrete
Supplying and erection Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete.,
Cement concrete 1:3:6 mix using 20mm ISS HBGS metal laid in layers not more than 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing ,laying,compacting and curing etc complete., Concrete Masonry - Abutment & Return wall - Below Sill level
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M Shanmugavelu
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .