Tender Value
₹2.7 Cr
EMD Value
₹5.3 L
Closing Date
18 Aug 2026, 6:00 pm
SE WR Circle Jaipur
O/o SE WR Circle Jaipur, JLN Marg, Jaipur
Rehabilitation of Peepla Minor Irrigation Project Tehsil Madhorajpura District Jaipur
2026_WRDAS_578229_1
SE/02/2026-27
Open Tender
Civil Works
Percentage
365 days
Peepla, Madhorajpura
As per NIT
3 documents required · 3 mandatory
₹5,000
As per NIT
₹5.3 L
Yes
27 Jul 2026
27 Jul 2026
19 Aug 2026
28 Jul 2026
18 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 900mm Labour Charges only | 40 | RM | 403 | ₹16,120 |
| 2 | Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 900mm NP3 | 40 | RM | 5,941 | ₹2,37,640 |
| 3 | Nominal mix of Plain Cement Concrete well mixed and laid in position using 20% max permissible limit of plums above 160 mm and up to 450mm, including curing and finishing etc including all leads of all construction materials complete in all respect with well graded crusher broken stone aggregate. The plums shall be distributed evenly and shall be not closer than 150 mm from the surface.PCC Nominal Mix 1:2:4 with plum, Max size of Aggregate 20 mm | 84.69 | Cum | 4,686 | ₹3,96,857.34 |
| 4 | Design, Drawing, fabrication, supply, erection, testing and commissioning of Vent liners (steel liners for sluice/tunnel or as per requirement in Dam/irrigation system) including Embedded parts consisting of liner plates, anchors, stiffeners, girders, fasteners etc. and any required necessary item, with all accessories for all types of Gates/ sluice channels/ any section of water resources projects including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, tools and tackles, applying two coat of zinc rich epoxy primer to give dry film thickness of 70 5 microns and finish coat (two coats) of solvent less coal tar epoxy paint using airless spray to provide dry film thickness of 150 5 microns per coat thus total dry film thickness of all coats, including primer coating, should not be less than 350 microns., including packing & forwarding, transportation charges complete, as per specifications and approved drawings. | 2.1 | Tonne | 1,09,721.2 | ₹2,30,414.52 |
| 5 | Painting standard type gauge with black, red and white un-washable paints including cost of material | 8 | R.M. | 210 | ₹1,680 |
| 6 | Making standard type cement gauge including engraving letters and painting including scaffolding etc. | 8 | R.M. | 550 | ₹4,400 |
| 7 | Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required. | 4,921.88 | Cum | 77 | ₹3,78,984.76 |
| 8 | Supplying, laying & spreading of LDPE film of 250 micron on bed and sides including jointing etc. complete as per specifications including cost of LDPE film, overlapping, adhesive tape etc. with transportation charges upto work site complete. | 15,544.8 | Sqm | 49 | ₹7,61,695.2 |
| 9 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. | 1,219.95 | Cum | 200 | ₹2,43,990 |
| 10 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 19,903.78 | Kg. | 78 | ₹15,52,494.84 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.27 MB
BidDocumentPeepla.pdf
Tender Documents • 1.19 MB
BOQ_1027576.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].