Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 CrAdmitted-Finance C 210 SECTOR 63 NOIDA U P 201301 | NOIDA | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | L1 | Admitted-Finance | |
| 2 | L2₹5.4 Cr+₹10.7 L (2.02%)Admitted-Finance 130A 18TH FLOOR INFINITY BUSINESS CENTRE PLOT GI BLOCK GP SALTLAKE SEC V KOLKATA 700091 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | L2 | Admitted-Finance | |
| 3 | L3₹6.9 Cr+₹1.6 Cr (31.0%)Admitted-Finance 39 ANAND INDUTRIAL ESTATE MOHAN NAGAR GHAZIABAD UTTAR PRADESH 201007 | GHAZIABAD | UTTAR PRADESH | 201007 | L3 | Admitted-Finance | |
| 4 | Rejected-Technical | - | Rejected-Technical Not Qualified | |
| 5 | Rejected-Technical 202 GALI NO D 36 CHHATTARPUR SOUTH WEST DELHI DELHI 110074 | SOUTH DELHI | DELHI | 110074 | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | SOMBANSI ENVIRO ENGG PVT LTD L3 | Shubham Hydrotech Engineers Pvt Ltd. L1 | SWACH ENVIRONMENT PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00 | Supply of all materials & manpower in three shifts for smooth & continuous running, operation & maintenance of existing 27MLD water treatment plant(WTP) along with the water supply system of Balijhara Water Works(BWW) with proper tools & tackles including supply & dosing of chemicals of required quantity with all records, attending to preventive maintenance & breakdown (Major/Minor) to all the assets (The treatment plant along with its process units & all the equipments & facilities as per the detailed list i.e pumps, motors, DG Sets, electrical panels & parts, components of the switch/operating board) with supply of all spare parts required for maintenance, inspection of power lines, maintenance of illumination to the treatment plant premises, raw water & canal intake pump houses including changing of lights, push buttons, wiring if required, including maintenance of all aerators with electrical panels (complete system) and deployment of Engineering personnel to ensure an efficient, effective & sustainable water supply with the available resources on 'as is where is basis'. If during the operation the pumps, motors or any other equipments /installations are not in workable & repairable condition, then the replacement of the same from reputed manufactures shall be made by the agency one to one at his/their own cost, functioning, running & maintenance of pumps, pipes, valves, electrical installations, instrumentation, maintaining log for running of electrical pumps, DG sets, Diesel Engine etc., to achieve drinking water confirming to IS standard etc. with supply of all labour, T&P etc. all complete for ensuring effective operation & maintenance of the water treatment plant as per direction of Engineer-in-charge. (Excluding GST) NB:1) The agency shall engage 45 nos. skilled labour,09 nos High skilled labour . 2)The contractor shall pay the wages for the workmen force engaged , as per the approved labour rate of Govt. of India/PPA approved rate with EPF, ESI, Bonus and Gate Pass. | 24 | Each Month | 26,73,000 ₹6,41,52,000 | 18,56,550 ₹4,45,57,200 Lowest | 20,00,000 ₹4,80,00,000 |
| 2.00 | Cleaning of existing filter beds of specified size & number as per scope of work, topping up once in a year with supply of filter media consisting of sand, pebbles of different sizes & activated carbon etc. asper requirment with supply of matgerilas, labour, T&P, taxes, tollege etc. aii complete as per the direction of Engineer-in-charge .(Excluding GST) | 2 | Each Year | 50,000 ₹1,00,000 | 32,600 ₹65,200 | 28,000 ₹56,000 Lowest |
| 3.00 | Cleaning of 04 nos. of existing clarifiers (No. 1, 2, 3 & 4) of 22 Mtr. Dia once in a quarter (Three months) with supply of all labour, materila, T&P etc. all complete as per the direction of Engineer-in-charge.(Excluding GST) | 32 | Each Time | 25,000 ₹8,00,000 | 6,200 ₹1,98,400 | 3,000 ₹96,000 Lowest |
| 4.00 | Testing of treated water once in a month as per IS Standard suitable for human consumption (Drinking & cooking) from out side lab (NABL Accredied lab)/ Govt. Laboratories including collection of sample in a container & transportation charges, submission of the test report to the Deptt. etc. all complete as per the direction of Engineer-in-charge.(Excluding GST) | 24 | Each No. | 15,000 ₹3,60,000 | 9,500 ₹2,28,000 Lowest | 11,000 ₹2,64,000 |
| 5.00Operation & Maintenance of two nos. of flow meter installed in 450mm dia pipe at Raw water- I & II including minor & major components replacement if required with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, hire & running charges of all equipment taking all safety precautions during installation etc. all complete but excluding GST as directed by Engineer-in-charge.(Excluding GST) | ||||||
| 5.01 | Routine inspection & preventive maintenance of 2 nos. of water flow meter of 450mm dia. | 24 | Each Month | 1,000 ₹24,000 Lowest | 6,150 ₹1,47,600 | 2,000 ₹48,000 |
| 5.02 | Supply & replacement of display of flow meter (450mm dia). | 2 | Each No. | 8,000 ₹16,000 | 12,700 ₹25,400 | 7,000 ₹14,000 Lowest |
| 5.03 | Supply & replacement of UPS of flow meter (450mm dia). | 2 | Each No. | 7,000 ₹14,000 | 11,500 ₹23,000 | 4,000 ₹8,000 Lowest |
| 5.04 | Supply & replacement of card of flow meter (450mm dia). | 2 | Each No. | 6,500 ₹13,000 Lowest | 16,900 ₹33,800 | 8,000 ₹16,000 |
| 6.00 | Supply of all labour, T&P for cleaning of floating weeds, scum, other floating materials and wastes from Reservoir No.I, Intake and its surroundings & locations as directed including disposal of the same at identified location etc all complete as per direction of Engineer-in-charge .(Excluding GST) N.B.: 1)The Agency to engage 07 Nos. Un-Skilled labour and The Agency Should Pay Labour Rate as per the current notification published by the ministry of labour/ PPA Approved rate with EPF, ESI, Bonus and Gate Pass. | 24 | Each Month | 79,250 ₹19,02,000 Lowest | 1,05,000 ₹25,20,000 | 1,52,000 ₹36,48,000 |
Tender Value
₹6.3 Cr
EMD Value
₹12.6 L
Closing Date
26 May 2025, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, PHD,PPA
Office of the Public Health Division(M), Engineering Department, ParadipPortAuthority, Ground Floor, Administrative Building, Mob-9937387239
Outsourcing of Operational work of Balijhara water works on Job Contract basis under PHD(M) for two years (2025-27)
2025_MoS_857924_1
CE/PHD(M)/ACCTS-03/25/244
Open Tender
Civil Works
Works
730 days
paradip
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Yes
As per eTCN and TD
₹12.6 L
Yes
7 Jul 2025
25 Apr 2025
28 May 2025
25 Apr 2025
26 May 2025
25 Apr 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of all materials & manpower in three shifts for smooth & continuous running, operation & maintenance of existing 27MLD water treatment plant(WTP) along with the water supply system of Balijhara Water Works(BWW) with proper tools & tackles including supply & dosing of chemicals of required quantity with all records, attending to preventive maintenance & breakdown (Major/Minor) to all the assets (The treatment plant along with its process units & all the equipments & facilities as per the detailed list i.e pumps, motors, DG Sets, electrical panels & parts, components of the switch/operating board) with supply of all spare parts required for maintenance, inspection of power lines, maintenance of illumination to the treatment plant premises, raw water & canal intake pump houses including changing of lights, push buttons, wiring if required, including maintenance of all aerators with electrical panels (complete system) and deployment of Engineering personnel to ensure an efficient, effective & sustainable water supply with the available resources on 'as is where is basis'. If during the operation the pumps, motors or any other equipments /installations are not in workable & repairable condition, then the replacement of the same from reputed manufactures shall be made by the agency one to one at his/their own cost, functioning, running & maintenance of pumps, pipes, valves, electrical installations, instrumentation, maintaining log for running of electrical pumps, DG sets, Diesel Engine etc., to achieve drinking water confirming to IS standard etc. with supply of all labour, T&P etc. all complete for ensuring effective operation & maintenance of the water treatment plant as per direction of Engineer-in-charge. (Excluding GST) NB:1) The agency shall engage 45 nos. skilled labour,09 nos High skilled labour . 2)The contractor shall pay the wages for the workmen force engaged , as per the approved labour rate of Govt. of India/PPA approved rate with EPF, ESI, Bonus and Gate Pass. | 24 | Each Month | - | - |
| 2 | Cleaning of existing filter beds of specified size & number as per scope of work, topping up once in a year with supply of filter media consisting of sand, pebbles of different sizes & activated carbon etc. asper requirment with supply of matgerilas, labour, T&P, taxes, tollege etc. aii complete as per the direction of Engineer-in-charge .(Excluding GST) | 2 | Each Year | - | - |
| 3 | Cleaning of 04 nos. of existing clarifiers (No. 1, 2, 3 & 4) of 22 Mtr. Dia once in a quarter (Three months) with supply of all labour, materila, T&P etc. all complete as per the direction of Engineer-in-charge.(Excluding GST) | 32 | Each Time | - | - |
| 4 | Testing of treated water once in a month as per IS Standard suitable for human consumption (Drinking & cooking) from out side lab (NABL Accredied lab)/ Govt. Laboratories including collection of sample in a container & transportation charges, submission of the test report to the Deptt. etc. all complete as per the direction of Engineer-in-charge.(Excluding GST) | 24 | Each No. | - | - |
| 5Operation & Maintenance of two nos. of flow meter installed in 450mm dia pipe at Raw water- I & II including minor & major components replacement if required with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, hire & running charges of all equipment taking all safety precautions during installation etc. all complete but excluding GST as directed by Engineer-in-charge.(Excluding GST) | |||||
| 5.01 | Routine inspection & preventive maintenance of 2 nos. of water flow meter of 450mm dia. | 24 | Each Month | - | - |
| 5.02 | Supply & replacement of display of flow meter (450mm dia). | 2 | Each No. | - | - |
| 5.03 | Supply & replacement of UPS of flow meter (450mm dia). | 2 | Each No. | - | - |
| 5.04 | Supply & replacement of card of flow meter (450mm dia). | 2 | Each No. | - | - |
| 6 | Supply of all labour, T&P for cleaning of floating weeds, scum, other floating materials and wastes from Reservoir No.I, Intake and its surroundings & locations as directed including disposal of the same at identified location etc all complete as per direction of Engineer-in-charge .(Excluding GST) N.B.: 1)The Agency to engage 07 Nos. Un-Skilled labour and The Agency Should Pay Labour Rate as per the current notification published by the ministry of labour/ PPA Approved rate with EPF, ESI, Bonus and Gate Pass. | 24 | Each Month | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_901982.xls
BOQ • 0.30 MB
BOQ.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .