Loading…
Loading…
Tender Value
₹97.2 L
EMD Value
₹1.9 L
Closing Date
5 Jun 2026, 3:00 pmClosed
Standardization of trolly refugees and Sand humps in the Section of SSE/P.WAY/SNP , SSE/P.WAY/PNP , SSE/P.WAY/SFDE Under ADEN/PNP.
NIT--5-26-27
NIT--5-26-27
Open
9 Months
Unknown (Unspecified Location)
₹0
₹1.9 L
11 May 2026
11 May 2026
22 May 2026
Unified standard Specifications (Formation Works, Bridge Works and P. Way Works) 2021 edition (Corrected upto date).of USSOR-2021 (Corrected up to date) Please see Item Breakup for details. 1710000.00 (-) 0.26 1705554.00 Description:- All items under chapter No.13 i.e. "Maintenance activities" of NR/DLI USSOR-2021
Specifications (Formation Works, Bridge Works and P. Way Works) 2021 edition (Corrected upto date).of USSOR-2021 (Corrected up to date) Please see Item Breakup for details. 3233579.50 3.63 3350958.44 Description:- All items under chapter No.21 i.e. "Miscellaneous Items" of NR/DLI USSOR-2021
Specifications (Formation Works, Bridge Works and P. Way Works) 2021 edition (Corrected upto date).of USSOR-2021 (Corrected up to date) S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit Above/ Schedule () B-DSR ITEM 3572890.96 Below/P ar Please see Item Breakup for details. 1128357.00 (-) 11.54 998144.60
( Volume-I & II ) 2021 edition (Corrected upto date). Please see Item Breakup for details. 607636.75 (-) 11.54 537515.47
rates ( Volume-I & II ) 2021 edition (Corrected upto date). DELHI DIVISION-ENGG/NORTHERN RLY Please see Item Breakup for details. 1396026.90 (-) 11.54 1234925.40
rates ( Volume-I & II ) 2021 edition (Corrected upto date). Please see Item Breakup for details. 406623.00 (-) 11.54 359698.71
( Volume-I & II ) 2021 edition (Corrected upto date). Please see Item Breakup for details. 219617.80 (-) 11.54 194273.91
( Volume-I & II ) 2021 edition (Corrected upto date). Please see Item Breakup for details. 280729.00 (-) 11.54 248332.87
Delhi Schedule of rates ( Volume-I & II ) 2021 edition (Corrected upto date).
38000.00 prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. Total 1147220.00 All items under chapter No.13 i.e. "Maintenance activities" of NR/DLI USSOR-2021 edition (Corrected upto date) complete for all L&M as per Indian Railways Unified standard Specifications Item- 2 (Formation Works, Bridge Works and P. Way Works) 2021 edition (Corrected upto date).of USSOR- 2021 (Corrected up to date) S No. Item Description of Item Unit Qty Rate Amount No
100000.00 and cess up to 3.95m from centre line of track in mid section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard. Total 1710000.00 All items under chapter No.21 i.e. "Miscellaneous Items" of NR/DLI USSOR-2021 edition (Corrected upto date) complete for all L&M as per Indian Railways Unified standard Specifications (Formation Item- 3 Works, Bridge Works and P. Way Works) 2021 edition (Corrected upto date).of USSOR-2021 (Corrected up to date) S No. Item Description of Item Unit Qty Rate Amount No
350.00 4548.77 1592069.50 x3.0m on cess, placing with released unserviceable PSC sleepers and keeping them at all four sides of refuge and also placing as matting inside the refuge by keeping them in upside down position with a minimum of 14 sleepers including levelling with earth, excavation, all lead and lift, crossing of tracks, leading the sleepers with in a free lead and lift, handling etc., with all contractor's men material complete and as directed by the Engineer-in- charge. Note: Earth-work will to be paid separately under relevant item. DELHI DIVISION-ENGG/NORTHERN RLY Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
500.00 minimum 1.10 cum bucket capacity
1500.00 Engineer in charge, for various works under SSE/P.Way, with contractor's T&P, equipments, hand signal flags, etc. as per specifications, special conditions and detailed scope of work as furnished in the tender and as directed by the Engineer in charge. Note: Item shall be operated with prior approval of concerned Sr. DEN / DEN in charge. Total 3233579.50 Schedule Schedule B-DSR ITEM All items appearing in chapter 2 i.e. ''Earthwork'' as per CPWD Delhi Schedule of rates ( Volume-I & Item- 1 II ) 2021 edition (Corrected upto date). S No. Item Description of Item Unit Qty Rate Amount No 2.0 EARTH WORK Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out 2.1 and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: 1 2.1.1 All kinds of soil Sqm 300 107 32100 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as 2.6 well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in- charge. 2 2.6.1 All kinds of soil cum 200 205.45 41090 Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as 2.10 required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : 2.10.1 All kinds of soil 2.10.1.2 Pipes, cables etc. exceeding 80 mm dia. but not Metre 100 417.35 41735 3 exceeding 300 mm dia 2.10.1.3 Pipes, cables etc. exceeding 300 mm dia but Metre 40 651.55 26062 4 not exceeding 600 mm 2.25A Excavating, supplying and filling of local earth cum 2300 368.65 847895 (including royalty) by mechanical transport upto a lead of 5km also including ramming and 5 watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Extra for every additional lift of 1.5 m or part 2.26 thereof in excavation / banking excavated or stacked materials. 6 2.26.1 All kinds of soil cum 1200 104.5 125400 DELHI DIVISION-ENGG/NORTHERN RLY Surface dressing of the ground including removing vegetation and in-equalities not 2.28 exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. 7 2.28.1 All kinds of soil Sqm 500 28.15 14075 Total 1128357.00 All items appearing in chapter 4 i.e. ''Concrete work'' as per CPWD Delhi Schedule of rates ( Item- 2 Volume-I & II ) 2021 edition (Corrected upto date). S No. Item Description of Item Unit Qty Rate Amount No 4.0 CONCRETE WORK 4.1S CEMENT CONCRETE (CAST IN SITU) Providing and laying in position cement concrete of specified grade excluding the cost 4.1 of centering and shuttering - All work up to plinth level : 4.1.2 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-III) cum 20 7783.65 155673 derived from natural sources : 3 graded stone 1 aggregate 20 mm nominal size derived from natural sources) 4.1.8 1:4:8 (1 Cement : 4 coarse sand (zone-III) cum 25 6326.05 158151.25 derived from natural sources : 8 graded stone 2 aggregate 40 mm nominal size derived from natural sources) Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, 4.2 buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 4.2.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) cum 30 9793.75 293812.5 derived from natural sources : 3 graded stone 3 aggregate 20 mm nominal size derived from natural sources). Total 607636.75 All items appearing in chapter 6 i.e. ''Masonary work '' as per CPWD Delhi Schedule of rates ( Item- 3 Volume-I & II ) 2021 edition (Corrected upto date). S No. Item Description of Item Unit Qty Rate Amount No 6.0 MASONRY WORK Brick work with common burnt clay F.P.S. (non 6.1 modular) bricks of class designation 7.5 in foundation and plinth in: 1 6.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand) cum 130 6658.25 865572.5 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in 6.4 superstructure above plinth level up to floor V level in all shapes and sizes in : 2 6.4.2 Cement mortar 1:6 (1 cement : 6 coarse sand) cum 64 8288.35 530454.4 Total 1396026.90 All items appearing in chapter 11 i.e. ''Flooring'' as per CPWD Delhi Schedule of rates ( Volume-I & II Item- 4 ) 2021 edition (Corrected upto date). S No. Item Description of Item Unit Qty Rate Amount No 11.0 FLOORING Brick on edge flooring with bricks of class designation 7.5 on a bed of 12 mm cement 11.1 mortar, including filling the joints with same mortar, with common burnt clay non modular bricks: 1 11.1.2 1:6 (1cement : 6 coarse sand) Sqm 250 898.2 224550 DELHI DIVISION-ENGG/NORTHERN RLY Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) 11.3 finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 11.3.1 40 mm thick with 20 mm nominal size stone Sqm 300 545 163500 2 aggregate 11.5 62 mm thick cement concrete flooring with Sqm 20 928.65 18573 concrete hardener topping, under layer 50 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) and top layer 12mm thick cement hardener consisting of mix 1:2 (1 cement 3 hardener mix : 2 graded stone aggregate, 6mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacture's specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. Total 406623.00 All items appearing in chapter 13 i.e. ''Finishing'' as per CPWD Delhi Schedule of rates ( Volume-I & Item- 5 II ) 2021 edition (Corrected upto date). S No. Item Description of Item Unit Qty Rate Amount No 13.0 FINISHING 13.1S CEMENT PLASTER (IN FINE SAND) 13.1 12 mm cement plaster of mix : 1 13.1.2 1:6 (1 cement: 6 fine sand) Sqm 100 282 28200 15 mm cement plaster on the rough side of 13.2 single or half brick wall of mix : 2 13.2.1 1:4 (1 cement: 4 fine sand) Sqm 80 339.7 27176 13.37S INTERIOR FINISHING 13.37 White washing with lime to give an even shade : 3 13.37.1 New work (three or more coats) Sqm 500 32.45 16225 Colour washing such as green, blue or buff to 13.39 give an even shade : 13.39.1 New work (two or more coats) with a base coat Sqm 800 44.25 35400 4 of white washing with lime 13.44S EXTERIOR FINISHING Finishing walls with Acrylic Smooth exterior 13.46 paint of required shade : 13.46.1 New work (Two or more coat applied @ 1.67 Sqm 478 166.85 79754.3 5 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) Painting with synthetic enamel paint of 13.61 approved brand and manufacture to give an even shade : 6 13.61.1 Two or more coats on new work Sqm 250 131.45 32862.5 Total 219617.80 All items appearing in chapter 15 i.e. ''Dismantling and Demolishing'' as per CPWD Delhi Schedule Item- 6 of rates ( Volume-I & II ) 2021 edition (Corrected upto date). S No. Item Description of Item Unit Qty Rate Amount No 15.0 DISMANTLING AND DEMOLISHING Demolishing cement concrete manually/ by mechanical means including disposal of 15.2 material within 50 metres lead as per direction of Engineer - in - charge. 15.2.1 Nominal concrete 1:3:6 or richer mix (i/c cum 50 2007.1 100355 1 equivalent design mix) DELHI DIVISION-ENGG/NORTHERN RLY 15.3 Demolishing R.C.C. work manually/ by cum 50 2928.1 146405 mechanical means including stacking of steel 2 bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. Demolishing brick work manually/ by mechanical means including stacking of 15.7 serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 3 15.7.4 In cement mortar cum 20 1698.45 33969 Total 280729.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
StandardTenderDocument2022R5.pdf Standard Tender Document 2022
ATTACHMENT
GCC-2022withCSupto11.pdf
ATTACHMENT
GCC-2022withCSupto10.pdf
ATTACHMENT
SpecialconditionofPWayContracts.pdf Special condition of P Way Contracts
ATTACHMENT
StandardTenderDocument2022R5.pdf
ATTACHMENT
SpecialconditionofPWayContracts.pdf
ATTACHMENT
Download all tender documents and submit your bid