Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹34.3 L
EMD Value
₹35,000
Closing Date
21 May 2020, 3:45 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRDA, Sivagangai
O/o The Project Director, DRDA, Sivagangai
Renovation of 6 Oorani works at Package No.TN/SVG/SVG-03/SFC 2019-20 in Sivagangai Block of Sivagangai District.
2020_RDTN_163923_1
Order No.47/2020/PRO/SVG/3sfcOorani
Open Tender
Civil Works - Water Works
Item Rate
120 days
Sivagangai
Refer Tender Documents
5 documents required · 5 mandatory
₹0
₹35,000
2 Jun 2020
16 May 2020
21 May 2020
16 May 2020
21 May 2020
16 May 2020
90 days
Amount
Improvements of Kalangari Oorani @ O.Pudhur Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Construction of Bathing Ghat
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Construction of Lining wall
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Construction of Inlet
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply of NP3 class RCC pipes confirming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading, unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers, as per standard specifications.
Sub total
Improvements of Ayyan Durai Oorani @ O.Pudhur Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Construction of Bathing Ghat
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Construction of Lining wall
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Construction of Inlet
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply of NP3 class RCC pipes confirming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading, unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers, as per standard specifications.
Sub total
Improvements of Pillaiyarthambam Oorani @ Nalukottai Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Construction of Bathing Ghat
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Construction of Lining wall
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Construction of Inlet
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply of NP3 class RCC pipes confirming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading, unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers, as per standard specifications.
Sub total
Improvements of Ali Oorani @ Nalukottai Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Construction of Bathing Ghat
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Construction of Lining wall
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Construction of Inlet
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply of NP3 class RCC pipes confirming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading, unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers, as per standard specifications.
Sub total
Improvements of Maavu Oorani @ Nalukottai Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Construction of Bathing Ghat
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Construction of Lining wall
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Construction of Inlet
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply of NP3 class RCC pipes confirming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading, unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers, as per standard specifications.
Sub total
Improvements of Kurunthundu Oorani @ Nalukottai Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Construction of Bathing Ghat
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Construction of Lining wall
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Construction of Inlet
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply of NP3 class RCC pipes confirming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading, unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers, as per standard specifications.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RML MARI
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .