| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹14.7 L (12.7%)Admitted-Finance 43 TRIDEEP BUNGLOW MIDDLE CLASS HSG SOC NEXT TO ARYAN SCHOOL GROUND PALGHAR MAHARASHTRA | PALGHAR | PALGHAR | MAHARASHTRA | 401404 | ₹1.3 Cr+₹14.7 L (12.7%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 Cr+₹26.6 L (23.0%)Admitted-Finance | ₹1.4 Cr+₹26.6 L (23.0%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 Cr+₹32.5 L (28.1%)Admitted-Finance | ₹1.5 Cr+₹32.5 L (28.1%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | Kores Sanitation L4 | M/s.Bhushan J Pawade L3 | M/S DATTATRAY CONSTRUCTION L1 | DIPAK S PIMPLE ENGINEERS AND CONTRACTORS L2 |
|---|---|---|---|---|---|---|---|
| 1.00Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge | |||||||
| 1.10 | From 0.0 to 1.5 m depth below average G.L. | 4,390 | Cu.m | 200 ₹8,78,000 | 110 ₹4,82,900 | 95 ₹4,17,050 | 88 ₹3,86,320 Lowest |
| 1.20 | From 1.5 to 3.0 m depth below average G.L. | 4,310 | Cu.m | 250 ₹10,77,500 | 125 ₹5,38,750 | 105 ₹4,52,550 | 95 ₹4,09,450 Lowest |
| 1.30 | From 3.0 to 4.5 m depth below average G.L. | 1,400 | Cu.m | 300 ₹4,20,000 | 141 ₹1,97,400 | 135 ₹1,89,000 | 103 ₹1,44,200 Lowest |
| 2.00Earth work excavation by mechanical means (Hydraulic excavator) / manual means in foundation, in Soft Rock including shoring, dewatering if necessary, dressing the sides, ramming the bottom, refilling the sides etc. with available selected excavated earth in layers of not exceeding 500 mm in depth, each layer well rammed and consolidated disposal of surplus excavated material within a lead of 200 m complete as per specifications and as directed by the Engineer-in-charge. | |||||||
| 2.10 | From 1.5 to 3.0 m depth below average G.L. | 260 | Cu.m | 500 ₹1,30,000 | 300 ₹78,000 | 145 ₹37,700 | 138 ₹35,880 Lowest |
| 2.20 | From 3.0 to 4.5 m depth below average G.L. | 1,340 | Cu.m | 650 ₹8,71,000 | 325 ₹4,35,500 | 165 ₹2,21,100 Lowest | 166 ₹2,22,440 |
| 3.00Earth work excavation in foundation in Hard Rock by Chiselling and / or by mechanical means (Hydraulic excavator) / Manual means including dewatering if necessary, dressing the sides, ramming the bottom, and stacking and / or disposing within a distance of 200 m and filling the sides of foundation with available selected excavated earth in layers not exceeding 500 mm in depth, each layer well rammed and consolidated etc.complete all as per specifications and as directed by the Engineer-in-Charge. | |||||||
| 3.10 | From 3.0 to 4.5 m depth below average G.L. | 270 | Cu.m | 700 ₹1,89,000 | 771 ₹2,08,170 | 555 ₹1,49,850 | 345 ₹93,150 Lowest |
| 4.00Lead charges for 1st 1 KM or part thereof, by mechanical transport including loading unloading, stacking / levelling etc . Note: The rates in respect of Item Nos. 6 are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. | |||||||
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
6 Sept 2022, 3:00 pmClosed
PM, INRPO
BARC,Tarapur
Construction of SLT (PhaseII) in Zone-9 at SWMF BARC
2022_NRB_705817_1
BARCT/INRPO/SWMF47/2022/194
Open Tender
Civil Works
Item Rate
365 days
BARC, Tarapur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹4.2 L
Yes
22 Nov 2022
16 Aug 2022
8 Sept 2022
16 Aug 2022
6 Sept 2022
26 Aug 2022
Amount
From 0.0 to 1.5 m depth below average G.L.
From 1.5 to 3.0 m depth below average G.L.
From 3.0 to 4.5 m depth below average G.L.
From 1.5 to 3.0 m depth below average G.L.
From 3.0 to 4.5 m depth below average G.L.
From 3.0 to 4.5 m depth below average G.L.
Lead charges for 1st 1 KM or part thereof, by mechanical transport including loading unloading, stacking / levelling etc . Note: The rates in respect of Item Nos. 6 are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements.
For soil
For Rock
Providing and laying in position cement concrete of 1:3:6 (1 cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) including consolidation, finishing, curing etc. complete as per specificationsand drawings but excluding the cost of Form work shuttering, centering Complete at all levels
Providing and laying in position Reinforced Cement Concrete (RCC) of grade M-30 using 20mm maximum size aggregates and crushed sand of approved quality including admixtures of approved brand and quality (plasticiser or super plasticiser) if required, including weigh batching, mechanical mixing, transporting, placing, vibrating, consolidation, finishing, curing etc. complete but excluding the cost of centering, shuttering and reinforcement complete as per specifications up to Plinth Level. Note: (1) Form work & reinforcement steel shall be measured and paid for separately under relevant item.
In sub-structure (up to plinth level)
In super-structure (above plinth level)
Extra for RCC Using Ready Mix Concrete from outside project area including transporting and pumping from approved batching plants .
Providing, fabricating and erecting form work (For Plant buildings and mass reinforced concrete work only) at all levels and places wherever needed/specified as per drawing including striking with 12mm Plastic coated, marine resistant waterproof ply with adjustable steel props of acceptable Staging system and with sufficient bracing as approved by Engineer in charge. Cost to include designing of proper form work and staging system to suit the requirements,Submission of design calculations and shop drawings for approval,sealing the joints with heavy duty brown self adhesive tape, aligning to line and levels including M.S. Ties, PVC Spacer, Providing openings/ cutouts/ pockets, applying deshuttering chemical, Deshuttering as per specification and instruction of Engineer in charge etc., complete including cost of material ,labour and staging/scaffolding at all levels, heights and profiles
Providing and removing centering, shuttering, strutting, propping etc., and removal of formwork for foundations, footings, bases of column, Walls, (any thickness) and beams including attached pilasters, butteresses, plinth and string courses etc. , for mass concrete including cost of all materials, labour. complete as per specifications. all upto plinth level (Applicable for mass reinforced concrete work only)
Providing Reinforcement Steel for reinforced cement concrete at all levels including supplying, preparation of bar bending schedules, cutting, bending, transporting, fixing, tieing in position with PVC coated G.I binding wire, all labour charges, cost of cover blocks in specified grade of concrete etc. complete as per specifications and drawings.Steel supplied by the contractor Using TMT bars of specified grades of all sizes. TMT bars to be supplied by the contractor from the own plants of SAIL, RINL or TATA make only using virgin materials
Providing and constructing Random Rubble masonry using approved Rubble stone in foundation and plinth in C.M 1:6 (using crushed sand) including raking out joints or simultaneous flush pointing below ground level / plinth level, curing etc. complete as per drawings and specifications.
DIPAK S PIMPLE ENGINEERS AND CONTRACTORS
M/s.Bhushan J Pawade
Kores Sanitation
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.78 MB
BOQ_742922.xls
BOQ • 0.25 MB
technicalbid.xls
Additional Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .