Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
3 Aug 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BLOCK DEVELOPMENT OFFICER(BP)
BLOCK DEVELOPMENT OFFICE, THIRUNAVALUR
KALLAKURICHI DISTRICT THIRUNAVALUR BLOCK REPAIRS TO SINGLE CLASS ROOM SCHOOL BUILDING AT MADAPATTU PANCHAYAT
2023_RDTN_346596_1
TN TNVR SIDS 2022-2023 - 13
Open Tender
Civil Works
Item Rate
180 days
THIRUNAVALUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,000
Yes
3 Aug 2023
20 Jul 2023
3 Aug 2023
20 Jul 2023
3 Aug 2023
20 Jul 2023
Amount
Repairs to Single Class Room School Building @ Madapattu Panchayat
Dismantling clearing away and carefully stacking damaged flooring plastering includiong all labour charges etc., complete (SOR Page No 22)
Cement concrete 1:4:8 mix using country bricks including cost conveyance and labour charges etc., complete
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Weathering course with pressed tiles includiong all labour charges etc., complete (SOR Page NO 22)
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
White washing two coats with shell lime including cost conveyance and labour charges etc., complete
Painting two coats with approved quality of oil bound distember including cost conveyance and labour charges etc., complete
Colour washing two coats with exterior emulsion paint including cost and conveyance of all to site etc., complete.
Painting two coats with approved Enamel paint including cost and conveyance of all and labour charges etc., complete.
Painting two coats for low level block board including cost of all labour charges etc., complete.
Towards labour charges for repairing the doors and windows including all labour charges etc., complete
Towards cost and supply of 110mm dia pvc pipe for rain water including cost conveyance and labour charges etc., complete
Provision for rainwater harvesting structure
Provision for BALA painting
Provision for Nameboard & Photographic Charges
G DINESH
stage.html
html • 0.02 MB
finance_412995.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .