Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 CrRejected-Finance | ₹1.4 Cr | L2 | Rejected-Finance L2 |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
27 Feb 2026, 5:00 pmClosed
SM_TENDER CELL
GNIDA OFFICE
Maintenance work of 45m wide road in Sector Techzone-4 and 6 Percent abadi plots road in Village Ithera for three years, Greater Noida.
2026_GNIDA_1116526_13
SM/(E-TENDER CELL)/2026/717 DATED-13.02.2026
Open Tender
Civil Works
1095 days
GREATER NOIDA
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹2,590
₹2.8 L
23 Jun 2026
17 Feb 2026
5 Mar 2026
17 Feb 2026
27 Feb 2026
17 Feb 2026
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.
All kinds of soil (DSR-18/2.28.1/AR)
Cleaning jungle including up rooting of rank, vegetations grass, push, wood trees and samplings of grith upto 30cms. measured at a height of 1 M. above ground level and removal of rubbish up to a distance of 50M. Out side periphery of area cleared. (SOR-20/259(i))
Same as above 259(i) above but grass only (SOR-20/259(a)
Tractor with trolley including POL & driver. (SOR-20/S.No-19)
Supply of labour. (SOR-20/SN-12)
Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.50 M and lead upto 30.00M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30m from the foundation trenches (where machine con not reach/move) (SOR/251 (A)/4.1.1)
Extra rates for quantities of works, executed: In or under water and/or liquid mud, including pumping out water as required (DSR-18/2.24.1/AR)
Cartage of earth or fly ash when added to schedule item no. 253 : IInd Km. and beyond (SOR-20/261(C))
Add to items (251-253) for every additional 30M (100ft.) lead or part of 30m (100ft.) or for every additional 1.50M. (5ft) lift or part of 1.50M. (5ft.) (SOR-20/254(A)/4.04)
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). (DSR-18/16.69)
Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost) (DSR-18/16.85)
White washing one coat including supply of all materials, labour, Tools & Plants etc. required for proper completion of the work. (SOR-20/671/16.01)
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work (DSR-18/13.99.1)
Painting with aluminium paint of approved brand and manufacture to give an even shade: One or more coats on old work (DSR-18/100.1)
Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.50 M and lead upto 30.00M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30m from the foundation trenches (where machine con not reach/move) (SOR/251 (A)/4.1.1)
Supplying at site : R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-incharge (cost of earth works in excavation, concrete works in foundation to be paid separately). (DSR-18/16.15.1)
Cement concrete with 4cm gauge Approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work
8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. (In cement mortar) (DSR-18/15.7.4)
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. (DSR-18/16.17)
With G.I. barbed wire (DSR-18/16.17.1)
Water Tanker with Sprinkler 6000 Litre or above cap. With POL/Driver including filling of water etc. complete (SOR-20/30)
Providing JCB with driver and including POL (AR/GNIDA)
Labour cess and GST will be paid extra as per Govt. orders.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.45 MB
PreQ_Main_Ithera.pdf
Tender Documents • 1.37 MB
BOQ_2073870.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid