| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-AOC AT STATION ROAD BRAJRAJNAGAR JHARSUGUDA 768216 | JHARSUGUDA | ODISHA | 768216 | ₹15.3 L Quoted ₹13.0 L | L1 | Accepted-AOC L1 BIDDER IS TECHNO COMMERCIALLY ELIGIBLE |
| 2 | Rejected-Technical AT RAMGARH PO ORIENT COLLIERY PS BRAJRAJNAGAR JHARSUGUDA ODISHA PIN 768216 | JHARSUGUDA | ODISHA | 768216 | - | - | Rejected-Technical Rejected as Bidder is NOT L1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected as Bidder is NOT L1 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected as Bidder is NOT L1 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected as Bidder is NOT L1 |
| Sl No | Description | Qty | Unit | M/S RAKESH KUMAR RUNGTA L1 | PRANA BANDHU JENA L2 | SAGAR JENA L5 | SATYABATI NAYAK L4 | RAFIK AHAMAD L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Day To Day Maintenance Work Of Pipelines & Pumping Arrangements in Coal Stocks used for Fire fighting / suppression work for a period of 01 year/365 days at SOCP | ||||||||
| 1.01 | Day To Day Maintenance Work Of Pipelines & Pumping arrangements in Coal Stocks used for Fire fighting / suppression work i.e. Damaged pipeline replacement & repairing, re-arrangement of pipelines as per requirement, periodical maintenance, fitting of fire fighting valves, fire fighting points and regular maintenance, Earth cutting works etc including 06 Nos skilled & 06 Nos unskilled Manpower in General Shift | 365 | Day | 2,686.71 ₹9.8 L | 3,530.73 ₹12.9 L | 3,700 ₹13.5 L | 3,698 ₹13.5 L | 3,631 ₹13.3 L |
| 1.02 | Cutting of MS pipe for short pc, T, reducer, bend making and leakage repairing, Flange cutting etc | 15,000 | cm | 3.26 ₹48,900 | 4.28 ₹64,260 | 4.45 ₹66,750 | 4.4 ₹66,000 | 4.41 ₹66,150 |
| 1.03 | Electrical welding for welding of MS flange, bend, T, reducer, Short Pc making and leakage repairing etc | 30,000 | cm | 3.84 ₹1.2 L | 5.05 ₹1.5 L | 5.3 ₹1.6 L | 5.25 ₹1.6 L | 5.2 ₹1.6 L |
| 1.04 | Supply of 2" Sluice Valve for replacement of Damaged valves | 25 | ea | 3,649.52 ₹91,238 | 4,796 ₹1.2 L | 4,980 ₹1.2 L | 5,025 ₹1.3 L | 4,933 ₹1.2 L |
| 1.05 | Supply of 4" Sluice Valve for replacement of Damaged valves | 4 | ea | 5,552.37 ₹22,209.48 | 7,296.61 ₹29,186.43 | 7,580 ₹30,320 | 7,644 ₹30,576 | 7,505 ₹30,020 |
| 1.06 | Supply of 6" Sluice Valve for replacement of Damaged valves | 4 | ea | 10,021.35 ₹40,085.40 | 13,169.49 ₹52,677.95 | 13,672 ₹54,688 | 13,796 ₹55,184 | 13,545 ₹54,180 |
| 2.00 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | 1 | Nos | - | - | - | - | - |
Tender Value
₹19.2 L
EMD Value
₹24,000
Closing Date
19 Nov 2025, 5:00 pmClosed
Staff Officer(ENM), IB Valley Area
Office of Staff Officer(ENM), IB Valley Area
Day To Day Maintenance Work Of Pipelines AND Pumping Arrangements in Coal Stocks used for Fire fighting OR suppression work for a period of 01 year(365 days ) at SOCP
2025_MCL_347053_1
MCL/GM/IBV/ENM/etender/112292 Dated.08.11.2025
Open Tender
Miscellaneous Works
365 days
SOCP, IB Valley Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹24,000
6 Jan 2026
8 Nov 2025
21 Nov 2025
8 Nov 2025
19 Nov 2025
9 Nov 2025
8 Nov 2025 - 12 Nov 2025
Amount
Day To Day Maintenance Work Of Pipelines & Pumping Arrangements in Coal Stocks used for Fire fighting / suppression work for a period of 01 year/365 days at SOCP
Day To Day Maintenance Work Of Pipelines & Pumping arrangements in Coal Stocks used for Fire fighting / suppression work i.e. Damaged pipeline replacement & repairing, re-arrangement of pipelines as per requirement, periodical maintenance, fitting of fire fighting valves, fire fighting points and regular maintenance, Earth cutting works etc including 06 Nos skilled & 06 Nos unskilled Manpower in General Shift
Cutting of MS pipe for short pc, T, reducer, bend making and leakage repairing, Flange cutting etc
Electrical welding for welding of MS flange, bend, T, reducer, Short Pc making and leakage repairing etc
Supply of 2" Sluice Valve for replacement of Damaged valves
Supply of 4" Sluice Valve for replacement of Damaged valves
Supply of 6" Sluice Valve for replacement of Damaged valves
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
PRANA BANDHU JENA (BID ID -1198127)
RAFIK AHAMAD (BID ID -1197937)
SATYABATI NAYAK (BID ID -1197941)
SAGAR JENA (BID ID -1198129)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.69 MB
Tendernotice_2.pdf
PDF • 1.11 MB
BOQ_359746.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid