Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 CrAdmitted-Finance | -9.75% | ₹3.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.5 Cr+₹21.6 L (6.65%)Admitted-Finance | -3.75% | ₹3.5 Cr+₹21.6 L (6.65%) | L2 | Admitted-Finance |
| 3 | L3₹3.6 Cr+₹34.7 L (10.7%)Admitted-Finance | -0.11% | ₹3.6 Cr+₹34.7 L (10.7%) | L3 | Admitted-Finance |
| 4 | L4₹3.6 Cr+₹34.9 L (10.7%)Admitted-Finance | -0.05% | ₹3.6 Cr+₹34.9 L (10.7%) | L4 | Admitted-Finance |
Tender Value
₹3.6 Cr
EMD Value
₹20.0 L
Closing Date
19 Aug 2026, 1:30 pmClosed
Dy Director (Const) RKUMP Kanpur
Dy Director (Const) RKUMP Kanpur
construction of 01 office building, 01 check post, 01 residential building type-2, 05 n B category shops, 10 c category shops, 01 double seater toilet, boundary wall, 02 gates and gate pillars, ..etc at NMY chibramau under mandi samiti Gurshahaiganj
2026_RKUMP_1172636_1
55/2026-24
Open Tender
Civil Works
Percentage
365 days
chhibramau
Please refer Tender documents.
2 documents required · 2 mandatory
₹29,500
Dy Director (Const) RKUMP Kanpur
₹20.0 L
Yes
27 Aug 2026
13 Aug 2026
19 Aug 2026
13 Aug 2026
19 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil including lift up to 1.5 meter lead up to 30 meter including watering and ramming of excavated earth into plinth and removal and disposal in surplus earth as directed by the E/I. up to a distance of 30M from the foundation trenches.(S.I.251) | 1,068.48 | cum | 135 | ₹1,44,244.8 |
| 2 | P/L of cement concerete 1:6:12 with cement F. Sand & stone aggregate 40mm size curing complete I/C supply of all materials labour & T&P etc. required for proper completion of work ( S.I.273) | 348.16 | cum | 3,500 | ₹12,18,560 |
| 3 | Brick work in 1:4 SUPER structure above plinth level upto floor two level( upto two storeys) including necessary cutting and moulding of brick work as required and also including honey combed brick in thickness of wall more than 12 cms. | 4.05 | cum | 5,050 | ₹20,452.5 |
| 4 | M-150 brick work in 1:6 with one cement and six coarse sand of 2.25 F.M mortar in foundation and plinth including supply of all materials labour T & P etc. Required for proper completion of the work as per( S.I.303)+ corse sand difrence. | 472.55 | cum | 4,830 | ₹22,82,416.5 |
| 5 | R.C.C work in 1:2:4 in raft foundation and footing with 4cm gauge approved stone ballast. SI No. 287 | 26.12 | cum | 7,800 | ₹2,03,736 |
| 6 | R.C.C. Work in 1:1.5:3 in Columns …Complete.S.I.289 | 107.6 | cum | 8,800 | ₹9,46,880 |
| 7 | R.C.C work in 1:1.5:3 in wall foundation complete | 76.56 | cum | 8,200 | ₹6,27,792 |
| 8 | R.C.C work with cement approval coarse sand and 2cm gauge stone grit in proportion of 1:2:4 in lintels of door & windows excluding supply of reinforcement and its bending but including its fixing and blinding the soil with 24 B.W.G.G.I binding wire and necessary centering and shuttering and supplyof all materials, labour and tools and plants etc.Required for proper completion of the work as per( S.I.283) | 60.83 | cum | 7,650 | ₹4,65,349.5 |
| 9 | R.C.C work in 1:2:4 in lighter beam.SI No. 285 | 47.08 | cum | 8,000 | ₹3,76,640 |
| 10 | R.C.C work in 1:1.5:3 in raft foundation complete | 67.57 | cum | 8,000 | ₹5,40,560 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
55.pdf
Tender Documents • 1.89 MB
BOQ_2207312.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .