Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹9.7 L+₹1.3 L (15.7%)Rejected-Finance BELOW SLAUGHTER HOUSE KRISHNA NAGER SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | L2 | Rejected-Finance NOT L1 |
Tender Value
₹10.1 L
EMD Value
₹21,000
Closing Date
24 Apr 2026, 6:00 pmClosed
EE Arki
ARKI DIVISION HPPWD ARKI
Construction of Examination Hall and class rooms on first floor) DMFT Deposit.)
2026_PWD_134377_1
DNIT NO. 581-86 DATED 09.04.2026
Open Tender
Civil Works
Percentage
60 days
Arki
AS PER SBD
11 documents required · 11 mandatory
₹500
₹21,000
28 Apr 2026
18 Apr 2026
25 Apr 2026
18 Apr 2026
24 Apr 2026
18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Centering and shuttering including strutting, proping etc. and removal for the same concrete work including carriage of materials upto all leads and lifts as per the direction of the Engineer-in-Charge. | - | - | - | - |
| - | Columns, pillars, posts and struts | - | Sqm. | - | - |
| - | Beams, cantilever, girders and lintels. Sides and soffits of beams, beam haunchings, cantilevers, bressumers and lintels not exceeding 1 metre in depth in all heights from floor. | - | Sqm. | - | - |
| - | Flat surfaces such as soffits of suspended floors,roofs, landings and the like. | - | Sqm. | - | - |
| - | Stair cases(except spiral stair cases) excluding but including preparing of the surface and finishing of the nosing upto all floor level. | - | Sqm. | - | - |
| - | Edges of slabs and breaks in floors and walls under twenty centimetre wide. | - | Rmt | - | - |
| - | Providing and laying in position machine batched and machine mixed design mixed M-25 grade cement concrete for Reinforced ,using cement concrete work as per design mix, icluding pumpiing of concrete to site of laying, but excluding cost of centering, shuttering finishing and reinforcement: complete including admixtures in reccommended ptopportions as per IS :9103 to accelerate,retard setting of concrete,improve workability with out impairing strength and durability including carriage of materials, labour, tool and plant through all modes of transportion within all leads and lifts and as per direction of Engineer-in- Charge. all work above plinth level upto floor five level. | - | Cum | - | - |
| - | Steel reinforcement for reinforced cement concrete work including cutting /bending, binding and placing in position complete including cost of binding wire upto floor all level including carriage of materials upto all leads and lifts as per the direction of the Engineer-in-Charge.(a)Tor steel. | - | Kg | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.28 MB
1GHSBhiunkhari.pdf
Tender Documents • 4.81 MB
BOQ_198757.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .