| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.1 LAccepted-AOC ARAJI NO 920 PLANT NO 5 PANKI ROAD KALYANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹6.1 L Quoted ₹7.2 L | L-1 | Accepted-AOC Agreement work complete |
| 2 | L-1₹7.2 LRejected-Finance 117 O 132 GEETANAGAR KANPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | ₹7.2 L | L-1 | Rejected-Finance No Lotter Winner |
| 3 | L-1₹7.2 LRejected-Finance | ₹7.2 L | L-1 | Rejected-Finance No Lotter Winner |
| 4 | L-1₹7.2 LRejected-Finance ADD 627 BAKSHI KHURD DARAGANJ TEHSIL SADAR PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | ₹7.2 L | L-1 | Rejected-Finance No Lotter Winner |
| 5 | L-1₹7.2 LRejected-Finance 127 182 JUHI GADADA KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹7.2 L | L-1 | Rejected-Finance No Lotter Winner |
Tender Value
₹8.4 L
EMD Value
₹84,386
Closing Date
5 May 2026, 3:00 pmClosed
ce knn
ce knn moti jheel
Improvement work of road by laying drain and interlocking tiles from in front of H-184 to H-259 via H-274 in Satyam Vihar under Zone 06 Ward 54 Vinayakpur.
2026_NNKAN_1144516_1
417/AA-6/2025-26
Open Tender
Civil Works
Percentage
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹84,386
7 Sept 2026
2 May 2026
5 May 2026
2 May 2026
5 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling cement concrete or brick work or granolithic floor including stacking of dismantaled material as directed by Engineer-in-Charge within s distance of 60 meter. | 10.5 | sqm | 67 | ₹703.5 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and work, including T&P and scaffolding wherever necessary, sorting the dismentled material, disposal of unserviceable material and stacking the serviceable material with all and lead of 1000 m as per Tenchnical specification Clause 202. By Mechanical Means Cement Concrete. | 1.78 | cum | 580 | ₹1,032.4 |
| 3 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5 m, as per directed by engineer-in-charge:2.1.1 all kind soil | 35.7 | cum | 170 | ₹6,069 |
| 4 | Earth work in excavation in by mechanical means (hydraulic excavator) trenches for foundation pipe cable etc in o ordinary soil (Loan clay or sand)including lift up to 1.5 m. lead up to 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c within a lead of 50m. Ch-4.2.8.1 | 50.44 | cum | 215 | ₹10,844.6 |
| 5 | Laying of base concrete 1:6:12 with cement C.Sand & 40mm Brick ballast including mat.Lab.T&P, etc all complete.) Providing and laying in cement concrete in 1:6:12 (1 cement: 6 fine sand: 12 graded brick aggregate 40 mm. nominal size) and curing complete, including cost of formwork in foundation and floors. | 8.8 | cum | 4,380 | ₹38,544 |
| 6 | Brick work with common burnt clay (non modular) bricks of brick 150 in foundation and plinth in 1:4 cement & coarse sand mortar in supply of all materials, labour and tools and plants etc. required for proper completion of the work. Etc all complete.Ch-6,6.1.1 | 26.63 | cum | 6,600 | ₹1,75,758 |
| 7 | 12 mm cement plaster of mix 1:4 (1 cement :4 fine sand) including material all complete. | 182.53 | sqm | 182 | ₹33,220.46 |
| 8 | Reinforced cement concrete work 1:1.5:3 in walls (any thickness), including attached pilaters, butteres, plinth and string courses , fillets, colums (1 cement:1.5 coarse sand :3 graded stone aggregate 20mm nominal size) centering shuttering including material all complete. | 3.91 | cum | 8,720 | ₹34,095.2 |
| 9 | Steel reinforcement for R.C.C. work including straighting, cutting, bending, placing in position and binding all complete up to plinth level,ch-5,SR-20,5.22.6 | 306.94 | kg | 72 | ₹22,099.68 |
| 10 | construction of gsb granular sub base by providing well graded material spreding in uniform layers with mortar grader on prepared surface complete as per mort&h etc all complete | 24.64 | cum | 3,671 | ₹90,453.44 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.60 MB
BOQ_2138519.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .