| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC 554 174 KA 1 CHHOTA BARHA ALAMBAGH LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹1.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.0 CrRejected-Finance | ₹1.0 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.1 CrRejected-Finance | ₹1.1 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.1 CrRejected-Finance 584 BASANTPUR GEETA PRESS GORAKHPUR 273005 | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273005 | ₹1.1 Cr | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | SHREEASHOK L4 | M/S K. K. CONSTRUCTION L3 | M/S PRABHAT TRADERS L2 | M/S ARYAN ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work by power transport for lead upto 1Km. Including excavation loading unloading stacking manual compation and dressing inlcuding all lift shall be applicable for lead upto 1Km. | 2,719.5 | Cum | 100 ₹2.7 L | 119 ₹3.2 L | 100 ₹2.7 L | 150 ₹4.1 L |
| 2.00 | Dry earth work digging in foundation masonary work on channels including lead lead up to 30M and lift up to 1.50M. | 1,799.44 | Cum | 90 ₹1.6 L | 50 ₹89,972 | 50 ₹89,972 | 70 ₹1.3 L |
| 3.00 | Laying coarse sand below c.c. with including all lead and lift with all cost of labour, T&P etc complete. | 46.55 | Cum | 3,000 ₹1.4 L | 3,500 ₹1.6 L | 1,500 ₹69,825 | 4,384 ₹2.0 L |
| 4.00 | Preparation of sub grade for linig work including cost of all material labour T&P etc. as per direction of Engineer-in-charge. | 931 | Sqm | 17 ₹15,827 | 15 ₹13,965 | 5 ₹4,655 | 15 ₹13,965 |
| 5.00 | Laying LDPE film 200 micron including cost of all materials labour T&P etc for complete work. | 931 | Sqm | 30 ₹27,930 | 30 ₹27,930 | 30 ₹27,930 | 30 ₹27,930 |
| 6.00 | Laying 75mm thick C.C. lining M-20(1:1.5:3) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and crushed hard stone grit (4.75-20mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour etc. | 931 | Sqm | 850 ₹7.9 L | 965 ₹9.0 L | 1,000 ₹9.3 L | 738 ₹6.9 L |
| 7.00 | Laying P.C.C. M-15(1:2:4) 20-40 mm size sand stone ballast/cum including cost of all material labour and T&P etc. required for proper completion of work. | 63.53 | Cum | 7,000 ₹4.4 L | 9,450 ₹6.0 L | 8,000 ₹5.1 L | 8,000 ₹5.1 L |
| 8.00 | Laying C.C. in sleeper M-15(1:2:4) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and crushed hard stone grit (4.75-20mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour etc. | 26.48 | Cum | 8,000 ₹2.1 L | 9,450 ₹2.5 L | 8,500 ₹2.3 L | 8,700 ₹2.3 L |
| 9.00 | Laying C.C. in M-20 (1:1.5:3) 4.75 to 20 mm (A20) size Granite crushed stone grit/cum including cost of all material, labour and T&P etc. required for proper completion of work. | 541.75 | Cum | 11,000 ₹59.6 L | 9,850 ₹53.4 L | 9,500 ₹51.5 L | 9,000 ₹48.8 L |
| 10.00 | Centering and shuttering for R.C.C. work per sqm including cost of all material lebour and T & P etc.required for proper completion of work. | 2,618.67 | Sqm | 700 ₹18.3 L | 550 ₹14.4 L | 500 ₹13.1 L | 700 ₹18.3 L |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
12 Feb 2026, 3:00 pmClosed
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
CONSTRUCTION OF COUNTER BERM WITH RETAINING WALL FROM KM. 55.100 TO 55.700 OF BANSGAON DY.
2026_UPIDC_1112047_4
08/S.E/2025-26
Open Tender
Civil Works
180 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,549
₹2.6 L
23 Mar 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
12 Feb 2026
6 Feb 2026
Earth work by power transport for lead upto 1Km. Including excavation loading unloading stacking manual compation and dressing inlcuding all lift shall be applicable for lead upto 1Km.
Dry earth work digging in foundation masonary work on channels including lead lead up to 30M and lift up to 1.50M.
Laying coarse sand below c.c. with including all lead and lift with all cost of labour, T&P etc complete.
Preparation of sub grade for linig work including cost of all material labour T&P etc. as per direction of Engineer-in-charge.
Laying LDPE film 200 micron including cost of all materials labour T&P etc for complete work.
Laying 75mm thick C.C. lining M-20(1:1.5:3) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and crushed hard stone grit (4.75-20mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour etc.
Laying P.C.C. M-15(1:2:4) 20-40 mm size sand stone ballast/cum including cost of all material labour and T&P etc. required for proper completion of work.
Laying C.C. in sleeper M-15(1:2:4) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and crushed hard stone grit (4.75-20mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour etc.
Laying C.C. in M-20 (1:1.5:3) 4.75 to 20 mm (A20) size Granite crushed stone grit/cum including cost of all material, labour and T&P etc. required for proper completion of work.
Centering and shuttering for R.C.C. work per sqm including cost of all material lebour and T & P etc.required for proper completion of work.
Centering and shuttering for C.C work including cost of all material lebour and T & P etc.required for proper completion of work.
Providing and fixing sealing compound in between pannel joints including cost of all material labour, T&P with all lead and lift for proper completion of work as per direction of Engineer-in-charge.
Cutting bending, binding and placing TMT steel bars for reinforcement in R.C.C. works including cost of all material labour T&P etc. required for proper completion of work.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.46 MB
BOQ_2056350.xls
BOQ • 0.29 MB
Buklet.pdf
Tender Documents • 2.98 MB
Download all tender documents and submit your bid