Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-Finance 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | L1 | Accepted-Finance Offered lowest rate | |
| 2 | L2₹3.5 L+₹649.53 (0.19%)Rejected-Finance 21 KBM CHAKDAH P O P S CHAKDAH DIST NADIA PIN 741222 | CHAKDAH | NADIA | WEST BENGAL | 741222 | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹3.5 L+₹1,077.38 (0.31%)Rejected-Finance 142 CHOWDHURY MARKET WARD 14 ARAMBAGH HOOGHLY 712601 | ARAMBAGH | HOOGHLY | WEST BENGAL | 712601 | L3 | Rejected-Finance Higher than L1 |
Tender Value
Refer Docs
EMD Value
₹7,150
Closing Date
7 Aug 2024, 12:30 pmClosed
Assistant Engineer-I, Malda Mechanical Division
Doulatpur PHE-Complex, Maliha, Malda,732102
Charges for Carrying of empty tonners from Water Treatment Plant (Capacity of 8.01 MLD) of Sub surface water based piped water supply scheme at Gangarampur Western Sector to authorised chlorine filling station as per availability and returning back
2024_PHED_717872_2
WBPHED/AE-I/MLMD/NIeT_3 of 2024-2025.
Open Tender
Electrical Work/ Equipment
Item Rate
30 days
Doulatpur PHE-Complex, Maliha, Malda, 732102
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,150
Yes
29 Aug 2024
24 Jul 2024
9 Aug 2024
24 Jul 2024
7 Aug 2024
24 Jul 2024
Amount
Charges for Carrying empty chlorine tonners (0.9 MT each) from Different Water Treatment Plant (Capacity of 8.01 MLD) of Sub surface water based piped water supply scheme at Gangarampur Western Sector to authorised chlorine filling station including cost of loading, unloading and detention charges. (Single trip shall carry 2 to 3 nos. tonner and required filling of Toner is approx 6 nos)
Charges for filling of Liquid Chlorine in empty tonners (0.9 MT each) at authorised chlorine filling station.
Charges for Carrying back filled in liquid chlorine tonners 2 to 3 nos (0.9 MT each) from authorised chlorine filling station to Balupur Water Treatment Plant including cost of loading and unloading.
Testing of empty tonner before filling as per IS Standards if required. (Payment will be made on the basis of submission of testing report)
Charges for replacement of cylinder valve, cylinder nut, cylinder spindle, cylinder cap and cylinder washer if requird including painting complete as per direction of EIC. (Payment will be made on the basis of submission of actual replacement report)
Add GST @ 18%
Add Cess @1%
DAS CONSTRUCTION
CHOWDHURY CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .