Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 CrAccepted-AOC 17 A SHYAMA JI PURAM I I T SOCIETY IIT KALYANPUR KANPUR UTTAR PRADESH 208016 | KANPUR NAGAR | UTTAR PRADESH | 208016 | ₹7.7 Cr Quoted ₹7.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹8.3 Cr+₹38.6 L (4.90%)Rejected-Finance | ₹8.3 Cr+₹38.6 L (4.90%) | L2 | Rejected-Finance High quoted |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
Tender Value
₹7.7 Cr
EMD Value
₹4.0 L
Closing Date
1 Jul 2020, 2:00 pmClosed
Superintending Engineer
O/o The Superintending Engineer Highways C and M Tirunelveli 2 AR Line Road
Package 3idening Improvements Improvements to RidingityJunctionImprovementsReconstruction ofBoxCulvert Construction and Reconstruction of Pipe culverts Construction of Retaining wall and Construction of Breast wall to Government Roads
2020_HWAY_166093_1
TN No 2 2020 21 HDO dated 26 05 2020
Open Tender
Civil Works - Highways
Percentage
180 days
Virudhunagar
AverageAnnual urnoverCompleted ContractMinimumquantities of works completed in one year during the last five years
PersonnelcapabilitiesEquipmentapabilities
Financial position
Audited balance sheet for the last five years
Litigation history
9 documents required · 9 mandatory
₹0
₹4.0 L
11 Mar 2022
2 Jun 2020
2 Jul 2020
2 Jun 2020
1 Jul 2020
12 Jun 2020
eProcurement System Government of Tamil Nadu Created By: Bharathi rajan Ramaswamy Created Date/Time: 25-Jul-2020 04:27 PM Tender Title: Package 3 Widening Improvements Government Roads in Virudhunagar H C and M Sub Division Tender ID: 2020_HWAY_166093_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Tirunelveli Circle
PACKAGE 3 - Widening ,Improvements,Improvements to Riding quality, Junction Improvements, Reconstruction of Box Culvert ,Construction & Reconstruction of Pipe culverts , Construction of Retaining wall and Construction of Breast wall to Government Roads in Virudhunagar (H) C&M, Sub –Division including upkeeping for a period of 60 months Name of work 1.Providing Junction improvement at km 0/0-0/2 of Amathur - Lakshmiyapuram Road inluding upkeeping for a period of 60 months 2.Widening from Single lane to Intermediate lane and Improvements of Amathur - Lakshmiyapuram Road at km 4/0 - 5/0 Including Construction of Retaining wall at km 4/4 including upkeeping for a period of 60 months 3.Improvements of Virudhunagar - Vadamalaikuruchi Road to Pavali at km 0/0 - 1/8 Including Reconstruction of pipe culvert at km 0/2, 0/6 (iii) and 1/6 including upkeeping for a period of 60 months 4.Improvements to Riding Quality at km 0/0 - 2/0 of K.Pudur -Thiyagarajapuram Road including upkeeping for a period of 60 months 5.Improvements to Riding Quality at km 0/0 - 1/0 and 3/0 - 4/0 of Virudhunagar -Pullalakottai Road upto Union Limit road including upkeeping for a period of 60 months 6.Construction of retaining wall at km 3/2, 3/4 of Amathur to Meet Alagapuri - Virudhunagar road (via) Moolipatti 7.Construction of Pipe Culvert at km 1/8 of K.Pudur -Thiyagarajapuram Road Including Construction of retaining wall 8.Construction of Retaining wall at km 0/0-1/0 of Virudhunagar - Periyaperali Road 9.Improvements to Riding Quality at km 3/0 - 5/0 of Amathur - to meet Alagapurai - Virudhunagar Road (via) Moolipatti. including upkeeping for a period of 60 months 1.01.Widening from Single lane to Intermediate lane and Improvements of Amathur - Lakshmiyapuram Road at km 0/2 - 1/0 Including Construction of breast wall at km 0/2-0/8 and Reconstruction of pipe culvert at km 0/6, 0/8 including upkeeping for a period of 60 months 1.02.Widening from Intermediate lane to Two lane and Improvements of Ramamoorthy Road (With in Virudhunagar Municipal limit) at km 0/730 - 1/930 Including Reconstruction of box culvert at km 0/10 including upkeeping for a period of 60 months
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 KRISHNA AND CO 68923326.921 2.000 78738009.000 Seven Crore Eighty Seven Lakh Thirty Eight Thousand Nine
2.00 SREE BALAJI CONSTRUCTIONS 68923326.921 7.000 82597715.000 Eight Crore Twenty Five Lakh Ninty Seven Thousand Seven Hundred and Fifteen
Lowest Amount Quoted BY: KRISHNA AND CO(78738009.000)
BOQ Summary Details Tender Title: Package 3 Widening Improvements Government Roads in Virudhunagar H C and M Sub Division Tender ID: 2020_HWAY_166093_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 KRISHNA AND CO 78738009.000 L1
2 SREE BALAJI CONSTRUCTIONS 82597715.000 L2
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .