Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.7 LAccepted-AOC | 1 | Accepted-AOC Accept |
| Sl No | Description | Qty | Unit | MARSTRONZ INFRA L1 |
|---|---|---|---|---|
| 1.00 | Removing the existing weathering course, clearing away the debrises from the roof top and clean the surface with water including cost of labour lead, lift, etc, complete as per standard specification. | 432 | m2 | 67 ₹28,944 Lowest |
| 2.00 | P.C.C 1:2:4 using 6mm HBG metal for flooring screed concrete with floor finishing including cost of all materials lead, lift, labour charges etc., complete and as directed by engineer at site | 32 | m3 | 6,835 ₹2,18,720 Lowest |
| 3.00 | Chipping and Roughing the existing concrete surface and plastering of damaged ceiling with cement cement mortar 1:3, 20mm thick, including cost of all materials, scaffolding arrangement, lead, lift, labour charges etc., complete | 110 | m2 | 507 ₹55,770 Lowest |
| 4.00 | Supplying and fixing the in position using 110 mm dia PVC down fall pipe (4 kg/sq.cm)of approved make and quality conforming to the IS specification for rain water line including cost of PVC pipe,necessary PVC specials,GI clamp with lead lift as directed by the Engineer in charge etc..complete. | 42 | RM | 453 ₹19,026 Lowest |
| 5.00 | Removing the exsisting damgaed cover slab and Disposal for all types of cover slabs away from the site and laying inposition and Labour charges for transportiong asper site requirements etc. and away from the site. | 33 | m2 | 719 ₹23,727 Lowest |
| 6.00 | Reinforced cement concrete in C.C. 1:1 ½ :3 mix using 12 to 20mm HBG machine crushed metal cover slab including cost of cement, all materials, labour, curing, vibration charges, including cost of shuttering all leads, lifts, as per standard specification, etc., complete. (but excluding cost of steel reinforcement.) | 3.55 | m3 | 9,368 ₹33,256.4 Lowest |
| 7.00 | Providing steel rinforcement MS/RTS rod for reinforced concrete works, inculding cost of steel MS/RTS rods, binding wire ,labour chareges for cutting ,straighting bending as per type design ,drawing ,placing ,aligning and typing properly with all leads and lift as per type specification ,etc.., complete. | 280 | Kgs | 94 ₹26,320 Lowest |
| 8.00 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | 9 ₹36,518.71 Lowest |
| 9.00 | CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | 9 ₹36,518.71 Lowest |
| 10.00 | Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only | 1 | Lumpsum | - |
Tender Value
₹4.0 L
EMD Value
₹4,800
Closing Date
11 Nov 2025, 2:00 pmClosed
SE/CEDC/SOUTH/CBE
O/O.SE/CEDC/SOUTH/CBE
providing Screed Concrete with floor finishing for open terrace at EE O M Negamam Dn office and Millkovilpalayam SS control room and replacement of damaged cover slab for Cable duct at 110 22 KV Millkovilpalayam Sub Station
2025_EB_618011_1
SE/CEDC/SOUTH/CBE/No.08/25-26
Open Tender
Civil Works - Buildings
Works
120 days
Negamam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,800
18 Dec 2025
28 Oct 2025
12 Nov 2025
28 Oct 2025
11 Nov 2025
28 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_738595.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .