Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Finance | -20.00% | ₹3.8 L | L1 | Admitted-Finance |
| 2 | L2₹4.1 L+₹36,841.72 (9.75%)Admitted-Finance | -12.20% | ₹4.1 L+₹36,841.72 (9.75%) | L2 | Admitted-Finance |
| 3 | L3₹4.3 L+₹55,593.21 (14.7%)Admitted-Finance | -8.23% | ₹4.3 L+₹55,593.21 (14.7%) | L3 | Admitted-Finance |
| 4 | L4₹4.5 L+₹73,211.11 (19.4%)Admitted-Finance | -4.50% | ₹4.5 L+₹73,211.11 (19.4%) | L4 | Admitted-Finance |
| 5 | L5₹4.7 L+₹87,475.47 (23.2%)Admitted-Finance | -1.48% | ₹4.7 L+₹87,475.47 (23.2%) | L5 | Admitted-Finance |
Tender Value
₹5.6 L
EMD Value
₹47,233
Closing Date
24 Jul 2026, 3:00 pmClosed
Chief Enigneer
Nagar Nigam Firozabad
Drain repair and CC construction work from Raju Dukanwali to M.R. Public School in Ward No. 06, Azad Nagar.
2026_DOLBU_1168774_1
08_PWD_Rajvitt_2026-27
Open Tender
Civil Works - Roads
Percentage
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹557
Municipal Corporation
₹47,233
13 Sept 2026
13 Jul 2026
24 Jul 2026
13 Jul 2026
24 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalling of B.O.E soling/Inter locking tiles Including Stacking of servicable material and disposal of unservicable material within a lead of 50m as per direction of EI/C (Labour only) (PWD SOR 2022-23, Chepter-20, Serial No.19 Item No. New) | 206.64 | Sqm | 10 | ₹2,066.4 |
| 2 | Disposal of malba form site with cartage up to 8 km distance etc……… all complete. | 13.22 | Cum | 230 | ₹3,040.6 |
| 3 | Deduction for dismantled interlocking tiles. | 1,446 | nos | 4.6 | ₹6,651.6 |
| 4 | Grandular Sub-base with well Graded Material (Table 400.1)
(A) By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis) | 32.01 | cum | 3,234 | ₹1,03,520.34 |
| 5 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse Fine sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work) (Fine sand not less than in 1.25 FM)(PWD SOR 2022-23 Chapter No-06 Item No. 6.1.1 A) | 8.15 | cum | 5,500 | ₹44,825 |
| 6 | 12 mm thick plaster with cement mortar in proportion of 1:4 cement & fine sand (Dholpur sand Not less than in 1.25 FM) of single coat for interior plastering upto floor two level including intarnal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth.(PWD SOR 2022-23 Chapter No-13 Item No. 13.1 spec. No. 13.1.1) | 129.92 | Sqm | 200 | ₹25,984 |
| 7 | CEMENT CONCRETE PAVEMENT(C.C ROAD) construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in ...........Technical Specification Clause 1501 (approved Quarri grit) (PWD SOR 2022-23, Chepter-20, SI N0 23 Item No New Item) | 33.42 | cum | 7,700 | ₹2,57,334 |
| 8 | R.C.C work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (PWDSOR 2022-23 Chapter No-05 Item No. 5.1spec. No. 5.1.3) | 0.65 | cum | 8,600 | ₹5,590 |
| 9 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. .(As per Analysis) | 0.51 | Qtl | 7,800 | ₹3,978 |
| 10 | Provind and Laying Cement concrete in 1:2:4 with cement coarse sand : 20mm graded stone etc…… all complete. | 2.58 | cum | 6,600 | ₹17,028 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_2192869.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .