| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-Finance | ₹13.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹13.7 LAccepted-Finance NO 8 109 1 ARASAMARATHU KAADU MUTHUNAICKENPATTI SEMMAN KODAL POST OMALUR TALUK SALEM DISTRICT 636 304 | SALEM | TAMIL NADU | 636304 | ₹13.7 L | L2 | Accepted-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Withdrawn |
| Sl No | Description | Qty | Unit | ACM AND CO L1 | KJS CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Construction of Cremation Shed and Compound wall at Nerinjipatty Burial ground H/O Vellakkalpatty. | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead lift in hard gravelly soil for foundation etc. complete. | 22.04 | cum | 246 ₹5,421.84 | 250 ₹5,510 |
| 3.00 | Plain Cement concrete 1 : 4 : 8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete. | 8.45 | cum | 5,228 ₹44,176.60 | 5,300 ₹44,785 |
| 4.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 2.69 | cum | 6,601 ₹17,756.69 | 6,650 ₹17,888.50 |
| 5.00 | Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum | 9.61 | cum | 5,664 ₹54,431.04 | 5,700 ₹54,777 |
| 6.00 | Re-filling the excavation earth filing including cost and conveyance and all labour charges etc complete as per standard specification. | 11.31 | cum | 43 ₹486.33 | 45 ₹508.95 |
| 7.00 | Dry Brick work using country bricks 9"x4 1/2"x3" including cost and conveyance of all materials to site and all labour charges etc complete | 1.28 | cum | 5,090 ₹6,515.20 | 5,150 ₹6,592 |
| 8.00 | Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete. | 3.49 | cum | 5,948 ₹20,758.52 | 6,000 ₹20,940 |
| 9.00 | Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon | 9.32 | Sqm | 516 ₹4,809.12 | 520 ₹4,846.40 |
| 10.00 | Above | 38.42 | Sqm | 1,033 ₹39,687.86 | 1,050 ₹40,341 |
Tender Value
₹13.7 L
EMD Value
₹14,000
Closing Date
17 Apr 2025, 3:00 pmClosed
BDO (VP)
BDO office Omalur
Salem District - Omalur Block - Construction of Cremation Shed and Compound wall at Nerinjipatty Burial ground H/O Vellakkalpatty Panchayat in AGAMT - II - 2025-2026 Work No.05
2025_RDTN_542025_5
Roc.No.4124/2024/T2
Open Tender
Civil Works
90 days
BDO office Omalur
As per tender document
3 documents required · 3 mandatory
₹0
₹14,000
5 Jan 2026
9 Apr 2025
17 Apr 2025
9 Apr 2025
17 Apr 2025
9 Apr 2025
Amount
Construction of Cremation Shed and Compound wall at Nerinjipatty Burial ground H/O Vellakkalpatty.
Earth work excavation and depositing on bank with in initial lead lift in hard gravelly soil for foundation etc. complete.
Plain Cement concrete 1 : 4 : 8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum
Re-filling the excavation earth filing including cost and conveyance and all labour charges etc complete as per standard specification.
Dry Brick work using country bricks 9"x4 1/2"x3" including cost and conveyance of all materials to site and all labour charges etc complete
Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon
Above
Supply and fabrication of steel for R.C.C work using R.T.S & M.S rod including cost and conveyance of all materials to site all labour charges etc complete.
Reinforced cement concrete 1 : 1 1/2:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete.
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Finshed with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Painting two coats with approved Emulsion over one coat of Priming coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Compound wall
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay Foundation per SS 20 A.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.(Square Column)
Plain surface
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc….
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KJS CONSTRUCTION (BID ID -1302883)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid