Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹24.3 LAWARDED | AWARDED |
Tender Value
₹29 L
EMD Value
₹50,000
Closing Date
20 May 2025, 9:30 pmClosed
Directorate of Municipal Administration
Annual Maintenance of borewell, pumpset, panel boards and cables From Ward no 13 to 23 Chandapura TMC Limit
DMA/2025-26/WS/WORK_INDENT39010
DMA/2025-26/WS/WORK_INDENT39010
Open
Water supply/sewage lines
Electronic Documents, First(One Cover)
DMA Town Municipal Council Chandapura
₹730
₹50,000
5 May 2025
5 May 2025
16 May 2025
Annual Maintenance of borewell, pumpset, panel boards and cables From Ward no 13 to 23 Chandapura TMC Limit
Rewinding of submergible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and...
13.1.8 For all types of submersible pumpsets above 7.5 HP and upto 8.0H.P.
13.1.13 For all types of submersible pumpsets above 10 HP and upto 11 H.P
13.1.15 For all types of submersible pumpsets above 12 HP and upto 13 H.P.
13.1.18 For all types of submersible pumpsets 15HP to 20 HP
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
13.2.2 The Intermediate piece (IP) with IP leaded bronze brush.
13.2.3 The Oil Seal.
13.2.4 The Oil Seal.and steel bush
13.2.5 The Guide Vane
13.2.6 The Impeller (Shell moulded with aluminium and bronze.)
13.2.7 The discharge outlet (DO) bearing DO steel bush DO bearing.
13.2.8 The steel bearing bush (DO steel bush)
13.2.9 The allen screw
13.2.10 The pump shaft made out of stainless steel counterless ground with key way (upto 8 stages). Extra for each stage @ Rs.40/-.
13.2.11 The pump key (stainless steel)
13.2.12 The pump coupling (stainless steel)
2.13 The Non Return Valve (NRV) assembly complete with rubber"O" ring.
13.2.14 The cable guard
13.2.15 The strainer
13.2.16 The brass filter
13.2.17 The Labour Charges for overhauling of the pump set.
Replace the components of motor parts of submersible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
13.3.3 The STATOR of motor 4 to 5 H.P
13.3.4 The ROTOR of motor upto 3.0 H.P
13.3.5 The ROTOR of motor 3 to 4 H.P
13.3.6 The ROTOR motor 4 to 5 H.P
13.3.7 The upper flange
13.3.8 The lower flange
13.3.9 upper/ lower housing
13.3.10 The Lock Ring
13.3.11 The Carbon Housing
13.3.12 The Carbon Housing (Thrust bearing block assembly complete with segment bearing pad.
13.3.13 The Carbon Housing (Top carbond / ferrodo padding)
13.3.14 The Stud and Nuts
13.3.15 The Gun Metal bearing, centrifugally cast Aluminium Bronze bearing brush
13.3.16 The Circlips
13.3.17 The Motor base with pin
13.3.18 The Transportation of pumping machineries
13.3.19 The Re-errection charges of pumping machineries including overhauling and painting
13.3.20 The lifting of submergible pumpset from well
13.3.21 The Labour charges only for overhauling
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .