Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.2 LAccepted-AOC | ₹45.2 L Quoted ₹33.3 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹33.4 L+₹11,501 (0.35%)Rejected-Finance | ₹33.4 L+₹11,501 (0.35%) | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L3₹40.0 L+₹6.7 L (20.2%)Rejected-Finance | ₹40.0 L+₹6.7 L (20.2%) | L3 | Rejected-Finance Not L1 Bidder |
| 4 | L4₹40.1 L+₹6.9 L (20.6%)Rejected-Finance | ₹40.1 L+₹6.9 L (20.6%) | L4 | Rejected-Finance Not L1 Bidder |
| 5 | L5₹41.9 L+₹8.6 L (25.9%)Rejected-Finance | ₹41.9 L+₹8.6 L (25.9%) | L5 | Rejected-Finance Not L1 Bidder |
| Sl No | Description | Qty | Unit | M/S SAPEYKUNG ENTERPRISES L3 | M/S OMMI ENTERPRISES L5 | M/s K K Enterprises L4 | EKIPI MIULI L1 | M/s Anu Enterprises L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator ) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan))including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil within a lead of 50 m as directed by Engineer-in-charge. A) All kinds of soil. | 38 | Cubic Meter | 210 ₹7,980 | 225 ₹8,550 | 320.32 ₹12,172.16 | 255 ₹9,690 | 200 ₹7,600 Lowest |
| 2.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 4 | Cubic Meter | 1,800 ₹7,200 | 1,500 ₹6,000 | 917.28 ₹3,669.12 | 115 ₹460 Lowest | 1,000 ₹4,000 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :
a) 1:2:4 (1 cement : 2 coarse sand (Zone III) : 4 graded stone aggregate 20 mm nominal size) | 9 | Cubic Meter | 7,500 ₹67,500 | 7,500 ₹67,500 | 8,211.84 ₹73,906.56 | 3,500 ₹31,500 Lowest | 7,000 ₹63,000 |
| 4.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level (a) 1:1:5:3 (1 cement : 1.5 coarse sand (zone III) : 3 graded stone aggregate 20 mm nominal size | 31 | Cubic Meter | 9,500 ₹2,94,500 | 9,880 ₹3,06,280 | 1,470.56 ₹45,587.36 Lowest | 7,500 ₹2,32,500 | 7,000 ₹2,17,000 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form for : all heights.
a) Foundations, footings bases of colunm, etcfor mass concrete. | 133 | Square Meter | 210 ₹27,930 | 480 ₹63,840 | 428.08 ₹56,934.64 | 55 ₹7,315 Lowest | 350 ₹46,550 |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for : all heights.
a) Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 72 | Square Meter | 210 ₹15,120 | 650 ₹46,800 | 568.75 ₹40,950 | 45 ₹3,240 Lowest | 350 ₹25,200 |
| 7.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
A) Thermo-Mechanically Treated bars of grade Fe-500D or more | 3,720 | Kilogram | 110 ₹4,09,200 | 110 ₹4,09,200 | 98.28 ₹3,65,601.6 | 110 ₹4,09,200 | 80 ₹2,97,600 Lowest |
| 8.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
A) Thermo-Mechanically Treated bars of grade Fe-500D or more | 3,100 | Kilogram | 110 ₹3,41,000 | 110 ₹3,41,000 | 100.1 ₹3,10,310 | 10 ₹31,000 Lowest | 80 ₹2,48,000 |
| 9.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in :a) Cement mortar 1:6 (1 cement : 6 Coarse sand) | 26.5 | Cubic Meter | 7,132.25 ₹1,89,004.63 | 10,500 ₹2,78,250 | 9,163.7 ₹2,42,838.05 | 1,500 ₹39,750 Lowest | 7,000 ₹1,85,500 |
| 10.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 14,400 | Kilogram | 125 ₹18,00,000 | 115 ₹16,56,000 | 121.94 ₹17,55,936 | 140 ₹20,16,000 | 85 ₹12,24,000 Lowest |
Tender Value
₹44.1 L
EMD Value
₹1.3 L
Closing Date
3 Apr 2025, 12:00 pmClosed
AGM (Engg.-Civil), Tezu Airport
O/o Airport Director, Airports Authority of India, Tezu Airport
Construction of rain water shed for DG sets at 11 KV power house and new ATC at Tezu Airport.
2025_AAI_229709_1
AAI/TEZU/E-C/e-NIT/ Rain Shed/24-25
Open Tender
Civil Works
Item Rate
210 days
Tezu Airport
As per NIT
14 documents required · 14 mandatory
₹1,180
₹1.3 L
31 Oct 2025
13 Mar 2025
4 Apr 2025
13 Mar 2025
3 Apr 2025
13 Mar 2025
13 Mar 2025 - 20 Mar 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .