EE Civil Civil Dn-ABM 16 Greams Road, Chennai-06.
BSNL Admn. Bldg.,16 Greams Road,Chennai-06
Erection of Additional Two Nos 6.00 M Pole on the Fifth floor Head room General Hospital Building at Pondicherry
2025_BSNL_228493_1
63 /BSNL/CD/ABM/CHN/2024-25
Open Tender
Civil Works - Buildings
Item Rate
30 days
Pondicherry
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Accounts Officer(cash),O/o.PGM,BSNL,Pondicherry
₹4,106
11 Mar 2025
1 Mar 2025
10 Mar 2025
1 Mar 2025
8 Mar 2025
1 Mar 2025
Amount
Erection of One Single 6.00 Pole structure with 75 mm nominal dia B Class pipe of thickness 3.00mm of Jindal Brand or equivalent including providing Base plate of size 150mm X 150mm x 8mm thickness at bottom and round plate of dia 82 mm and thickness 2 mm at Top including any Bracket requirement for Anchorage, Step rod with angles of 32mm X 32mm X 4 mm of 10 Nos, Applying Etch primer of base coat and Yellow primer of Zinc Chromate of brand MRF or Equivalent including erection of the same with necessary scaffoldings, Coirs, safety jackets All complete as directed by the Engineer- in- Charge. ( The rate includes necessary insurance charges for labour and the agency is responsible for all precautionay measures to be maintained at site where the pole is to be erected at a height of about 25.00 m excluding the pole height for safety of men working)
Providing and laying Cement concrete with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size ) for Pole structural base including cost of centering, shuttering upto 0.25 cum. ( The rate includes necessary insurance charges for labour and the agency is responsible for all precautionay measures to be maintained at site where the structural base for the pole is to be carried out at a height of about 25.00 m excluding the pole height for safety of men working)
Providing and laying Cement concrete with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) for BTS & Power Plant Plinth of Size 5.00mx1.50mx0.125m including cost of centering, shuttering, Finishing the Top and sides upto 1.00 cum. ( The rate includes necessary insurance charges for labour and the agency is responsible for all precautionay measures to be maintained at site where the Plinth is to be carried out at a height of about 20.00 m excluding the pole height for safety of men working)
Providing and laying Cement concrete with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size ) for Engine Bed of Siize 2.35mx1.35mx1.55 upto 5.00 Cum with necessary demolishing of Cement Concrete, Earth work, Msand Filling, Refilling, PCC 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size ), Centring and shuttering including Finishing the Top and sides of the Bed with cement mortar 1:4 ( 1 cement : 4 Psand ), Making good the Floors, Fixing 40x40x4mm nosing angles for the edges with painting etc., all complete as per the direction of the Engineer in charge. ( The rate includes necessary insurance charges for labour and the agency is responsible for all precautionay measures to be maintained at site where the Engine bed is to be carried out beside the Open drain for safety of men working)
Supplying 8 mm dia galvanised MS rope for stay wire arrangement all complete as directed by Engineer-in-charge. ( The rate includes necessary insurance charges for labour and the agency is responsible for all precautionay measures to be maintained at site where the pole is to be erected at a height of about 25.00 m excluding the pole height for safety of men working)
Supplying GI /MS Clamp, D bolts and erecting stay wire of the pole structure including wall /Floor clamp fixed with expansion fasteners, clamping the stay wire at ends, All complete as directed by Engineer-in-charge. ( The rate includes necessary insurance charges for labour and the agency is responsible for all precautionay measures to be maintained at site where the pole is to be erected at a height of about 25.00 m excluding the pole height for safety of men working)
Painting with Epoxy Enamel paint of approved Brand Berger or equivalent make and even shade in two or more coats over the Structural sections . The payment shall be made based on the weight of the Pole considering as a job. ( The rate includes necessary insurance charges for labour and the agency is responsible for all precautionay measures to be maintained at site where the pole is to be erected at a height of about 25.00 m excluding the pole height for safety of men working)
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .