Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹39.3 L+₹33,578 (0.86%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹40.5 L+₹1.5 L (3.90%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹40.8 L+₹1.8 L (4.69%)Rejected-AOC 37 222 BUNDU KATRA AGRA UP | AGRA | UP | L4 | Rejected-AOC L4 | |
| 5 | L5₹42.2 L+₹3.2 L (8.31%)Rejected-AOC 205L MODEL TOWN LUDHIANA | LUDHIANA | LUDHIANA | PUNJAB | L5 | Rejected-AOC L5 |
Tender Value
₹42.5 L
EMD Value
₹85,000
Closing Date
8 Jun 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE Bharatpur
Kanjoli Line Bharatpur
Provn of smart metering system at Bharatpur Mil Stn
2023_MES_590499_2
8228/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE Bharatpur
As per NIT
6 documents required · 6 mandatory
₹500
GE Bharatpur
₹85,000
Yes
7 Jul 2023
12 May 2023
10 Jun 2023
12 May 2023
8 Jun 2023
25 May 2023
13 May 2023 - 18 May 2023
Amount
Supply ,Installation ,Testing & Commissioning of Microprocessor based Single phase tamper proof electronic static pre paid cum postpaid energy meter rating 240 Volts, 50 HZ, of range 10-60 Amps, complying to IS 16444 with LED/LCD display and parameters like Voltage, Current, Frequency, Power, Power factor, KWh/KVA, inbuilt long range Communication and given data to DCU suitable for RF based / outdoor data accumulator and also compatible for Prepaid and Postpaid online energy monitoring billing system, with disconnection /reconnection through remote software / data export to ERP including taking down old meter & deposited to MES store safely complete all as specified and as directed by Engg in-Charge with 2 Years warranty from manufacturer for new meters. Make :Elmeasure/secure meter/L&T/HPL
Supply ,Installation ,Testing & Commissioning of Microprocessor based three phase tamper proof electronic static pre paid cum postpaid energy meter rating 440 Volts, 50 HZ, of range 10-60 Amps, complying to IS 16444 with LED/LCD display and parameters like Voltage, Current, Frequency, Power, Power factor, KWh/KVA, inbuilt long range Communication and given data to DCU suitable for RF based / outdoor data accumulator and also compatible for Prepaid and Postpaid online energy monitoring billing system, with disconnection /reconnection through remote software / data export to ERP including taking down old meter & deposited to MES store safely complete all as specified and as directed by Engg in-Charge with 2 Years warranty from manufacturer for new meters. Make :Elmeasure/secure meter/L&T/HPL
Supply, installation, testing and commissioning of data concentartion unit/data collector unit for long range communication up to 600 Mtrs suitable for communicating with Prepaid come postpaid meter with communication protocol and the data transfer to the Theiox Software complete all as specified and as directed by engineer--in-Charge. The cost of pole /fixing /mounting arrangement on which the accumulator to be installed and SMPS power supply with Power backup for Minimum up to 2 Hours confirming to IS -16444 is deemed to be included in the unit quoted rates. Note: Hosting, GPRS charges for 3 years warranty period and telephonic connection from BSNL/Airtel/Jio/Vodafone for a period of three years for 8 DCU unit complete all as specified and directed by engineer-in-charge Make : BSNL/Airtel/JIO/Vodafone MAKE- sutiable as per prepaid meter of make L&T/ELmeasure/secure/HPL
Supply and Installation of single phase meter as repeaters complete all as specified and directed Make: L&T, Elmeasure ,Secure/HPL.
Supply fixing testing & commissioning of configuration of web Hosted multi user web based software with life time license for the following modules (i) Meter data management Modules : The meter data management module would be responsible for collecting the data from the concentrator and make the data available to the billing system . The billing system would support offline meter data entry. the meter data management system would capture and provide the following data. (ii) Mobile Application for all MES Users/prepaid meter holder for checking their reading/ making online payment and office neccessary work as per MOD direction (a) 30min instantaneous data from all the meters for seven parameters - cumulative energy , Power, Current , Voltage, Power factor and frequency. (b) Monthly and quarterly billing survey data for cumulative energy and max demand. (ii) Billing Module : The billing module would collect the data from the meter data management module , calculate billing determinant and make energy data / billing data available to admin and end user. (iii) Occupation and Vacation module : The system would support occupation/vacation based on the unit categories The system would support automatic data capture on occupation and vacation events
(iv) Customer Module : The system would include a customer portal for the resident/occupants to log in and view their own energy/billing data.sutiable for smart meter of .MAKE- L&T, Elmeasure/HPL/Secure (v) Energy Accounting module : The system would include features of energy accounting , the system would to able to account for total energy block wise, facility wise and would also allow calculations of the unaccounted energy in case total energy meter is also available.(iv) Communication Module : The system would provide communication of energy data and bills via print, email and sms methods. (vii) Meter Master Data : The system would support meter days repository. The system would support meter replacement process. (viii) Excel Export : the system would support export of metering and billing data in excel format.MAKE-Elmeasure/secure meter/L&T/HPL
(ix) Activities communication - the sofware support communication the various activities such as occupation vacation meter change personal detail change etc with the user as well as the department on email. Make : Schnieider / innologix/ SAF/L& T/ HPL/ Elmeasure/Secure meter Note : (a) The software sould be hosted either on GCC server or on MES Server in case the softwere is hosted on GCC server it would be transfered to MES server whenever the MES is made available . (b) The software would contain two year defect liability period including all operating expenses such as GPRS charges hosting charge etc. (c) GE Bank account and one payment gateway would be provided by MES. The payment gateway would he integrated with the software in the situation (d) The software would be scalable and expandable for meters and system of different make complying with IS16444
Supply, installation, testing and commissioning of compatible polycarbonate boxes with transparent front glass cover for single phase prepaid/postpaid meters complete all as specified and directed.
Supply, installation, testing and commissioning of compatible polycarbonate boxes with transparent front glass cover for Three phase prepaid/postpaid meters complete all as specified and directed.
M&L submain wiring complete with 6 Sqmm single core multi standred PVC insulated and sheathed cable FRLS copper conductor four runs and one run of 6 Sqmm copper cable for earth continuity conductor in and including drawn through PVC conduit with all PVC accessories fixed on wall, floor/ceiling etc complete all as specified and directed.
M/S MAMTA CONSTRUCTIONS
GANGA CONSTRUCTION
PD GUPTA AND COMPANY
M/s S. K. Construction Co.
M/s Ranaji Construction Co
Vijay Electricals
ONKAR ENGINEERS CONTRACTORS
ABHOG INFRASTRUCTURE PRIVATE LIMITED
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .