Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.5 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹79.2 L+₹6.7 L (9.19%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹82.5 L+₹10.0 L (13.7%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹86.1 L+₹13.6 L (18.7%)Rejected-Finance VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | M/S RAM CHARAN YADAV L1 | M/S K. K. CONSTRUCTION L2 | M/S ADITYA CONSTRUCTION COMPANY L4 | M/S SHYAM ASSOCIATE L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge. | 2,993.1 | CUM | 42 ₹1,25,710.2 Lowest | 55 ₹1,64,620.5 | 69.22 ₹2,07,168.91 | 60 ₹1,79,586 |
| 2.00 | E/W in filling by powere transport within 1 Km. Including excavation, loading, unloading and manualy compaction and dressing including all lift complete in all respect. | 3,305.27 | CUM | 90 ₹2,97,474.3 Lowest | 120 ₹3,96,632.4 | 157.77 ₹5,21,474.51 | 120 ₹3,96,632.4 |
| 3.00 | Laying P.C.C. 1:2:4 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20 mm to 40 mm.) including all cost of materials, T&P and labours and other accessories required for proper completion of work. | 476.9 | CUM | 8,000 ₹38,15,200 | 9,100 ₹43,39,790 | 9,564.78 ₹45,61,441.65 | 7,300 ₹34,81,370 Lowest |
| 4.00 | Centering and shuttering for C.C. work including all cost of materials, T&P labours and other accessories required for proper completion of work. | 2,164.26 | SQM | 100 ₹2,16,426 Lowest | 140 ₹3,02,996.4 | 171 ₹3,70,094.95 | 500 ₹10,82,130 |
| 5.00 | First class brick work in 1:4 cement mortor including cement and coarse sand of F.M. not less than 2.50 including cost of all material labour and T&P etc. required for proper completion of work. | 241.08 | CUM | 6,300 ₹15,18,804 | 6,400 ₹15,42,912 | 5,873.75 ₹14,16,043.52 Lowest | 6,500 ₹15,67,020 |
| 6.00 | 12 mm thick plaster with cement mortar inproportion of 1:4 cement and sand of 2.5 FM over brick work minium. thickness not be less than 10 mm including supply of all materials, labour and T&P etc required for proper, completion of work. | 1,083.57 | SQM | 130 ₹1,40,864.1 Lowest | 130 ₹1,40,864.1 Lowest | 226.25 ₹2,45,161.24 | 140 ₹1,51,699.8 |
| 7.00 | Supply and fixing PVC pipe 110 mm for drainge spout labour, t&p etc. required for proper completion of work. | 349.42 | RM. | 150 ₹52,413 Lowest | 160 ₹55,907.2 | 187.29 ₹65,442.52 | 400 ₹1,39,768 |
| 8.00 | Supply and fixing PVC pipe 150 mm for drainge spout labour, t&p etc. required for proper completion of work. | 1,220.16 | RM. | 300 ₹3,66,048 | 210 ₹2,56,233.6 Lowest | 403.08 ₹4,91,820.26 | 442 ₹5,39,310.72 |
| 9.00 | Laying R.C.C. M-20(1:1.5:3) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and crushed hard stone grit (4.75-20mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cest of all material, T&P, Labour etc. | 51.59 | CUM | 8,900 ₹4,59,151 Lowest | 9,200 ₹4,74,628 | 9,941.18 ₹5,12,865.37 | 8,900 ₹4,59,151 Lowest |
| 10.00 | Cutting bending binding and placing of TMT steel bar for reinforcement with cost of binding wire, required for proper completion of work including cost of materials labour T&P etc. | 4.01 | MT | 65,000 ₹2,60,975 | 61,000 ₹2,44,915 | 54,883.82 ₹2,20,358.54 Lowest | 63,000 ₹2,52,945 |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
7 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
Construction of Damaged Outlets of Gola Branch Canal of Chaudhary Charan Singh Gola Pump Canal System in District Gorakhpur.
2026_UPIDC_1201633_3
06/S.E/2026-27
Open Tender
Civil Works
Item Wise
150 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,249
₹2.1 L
16 Nov 2026
28 Oct 2026
7 Nov 2026
28 Oct 2026
7 Nov 2026
28 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge. | 2,993.1 | CUM | - | - |
| 2 | E/W in filling by powere transport within 1 Km. Including excavation, loading, unloading and manualy compaction and dressing including all lift complete in all respect. | 3,305.27 | CUM | - | - |
| 3 | Laying P.C.C. 1:2:4 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20 mm to 40 mm.) including all cost of materials, T&P and labours and other accessories required for proper completion of work. | 476.9 | CUM | - | - |
| 4 | Centering and shuttering for C.C. work including all cost of materials, T&P labours and other accessories required for proper completion of work. | 2,164.26 | SQM | - | - |
| 5 | First class brick work in 1:4 cement mortor including cement and coarse sand of F.M. not less than 2.50 including cost of all material labour and T&P etc. required for proper completion of work. | 241.08 | CUM | - | - |
| 6 | 12 mm thick plaster with cement mortar inproportion of 1:4 cement and sand of 2.5 FM over brick work minium. thickness not be less than 10 mm including supply of all materials, labour and T&P etc required for proper, completion of work. | 1,083.57 | SQM | - | - |
| 7 | Supply and fixing PVC pipe 110 mm for drainge spout labour, t&p etc. required for proper completion of work. | 349.42 | RM. | - | - |
| 8 | Supply and fixing PVC pipe 150 mm for drainge spout labour, t&p etc. required for proper completion of work. | 1,220.16 | RM. | - | - |
| 9 | Laying R.C.C. M-20(1:1.5:3) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and crushed hard stone grit (4.75-20mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cest of all material, T&P, Labour etc. | 51.59 | CUM | - | - |
| 10 | Cutting bending binding and placing of TMT steel bar for reinforcement with cost of binding wire, required for proper completion of work including cost of materials labour T&P etc. | 4.02 | MT | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.14 MB
Buklet3.pdf
Tender Documents • 3.23 MB
BOQ_2273922.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .