(A) Wadibunder- Strengthening of retaining wall/ boundary wall along platform No.1 at DKRD station. (IRPSM ID: 01.02.64.25.3.51.005) (B)(a) Wadibunder- Strengthening of boundary wall between MSD to VDLR section under trespassing. (b) WB- Repairs to boundary wall of Sewri station & Vadala road station along the platform under trespassing. (IRPSM ID: -01.02.64.25.3.51.014)
CR-DRMWBB-2026-30-06
CR-DRMWBB-2026-30-06
Open
12 Months
Rajkot, Gujarat
₹0
₹8.9 L
2 Jun 2026
2 Jun 2026
12 Jun 2026
platform under trespassing. (IRPSM ID: -01.02.64.25.3.51.014)
Item- 01 Part-(B)(b) MS items (DSR-2023 items)
S No. Item Description of Item Unit Qty Rate Amount
1.0 CARRIAGE OF MATERIALS
By Mechanical Transport including loading,
unloading and stacking
1.1.18 Disposal of moorum/building rubbish/ malba/ cum 400 494.1 197640
similar unserviceable, dismantled or waste
material by mechanical transport including
1 loading, transporting, unloading to approved
municipal dumping ground for lead upto 10 km
for all lifts, complete as per directions of
Engineer-in-charge.
2.0 EARTH WORK
2.1S General
Earth work in excavation by mechanical means
(Hydraulic excavator)/manual means over areas
(exceeding 30 cm in depth, 1.5 m in width as
2.6 well as 10 sqm on plan) including getting out
and disposal of excavated earth lead upto 50 m
and for all lift, as directed by Engineer-in-
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position cement
concrete of specified grade excluding the cost
of centering and shuttering - All work up to
MUMBAI- CST-DIVISION-ENGG/CENTRAL RLY
derived from natural sources : 6 graded stone
aggregate 20 mm nominal size derived from
natural sources)
5.0 REINFORCEMENT CEMENT CONCRETE
5.9S FORM WORK
Centering and shuttering including strutting,
propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. Sqm 1090 392.15 427443.5
for mass concrete
5.9.2 Walls (any thickness) including attached Sqm 2422 842.5 2040535
5 pilasters, buttresses, plinth and string courses
5.22S STEEL REINFORCEMENT
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in
position and binding all complete upto plinth
5.22.6 Thermo-Mechanically Treated bars of grade Fe- Kg 35230.8 107.85 3799641.78
5.33S DESIGN MIX CONCRETE
Providing and laying in position ready mixed or
site batched design mix cement concrete for
reinforced cement concrete work; using coarse
aggregate and fine aggregate derived from
natural sources, Portland Pozzolana / Ordinary
Portland /Portland Slag cement, admixtures in
recommended proportions as per IS: 9103 to
5.33 accelerate / retard setting of concrete, to
improve durability and workability without
impairing strength; including pumping of
concrete to site of laying, curing, carriage for all
leads; but excluding the cost of centering,
shuttering, finishing and reinforcement as per
direction of the engineer-in-charge, for the
following grades of concrete.:
5.33.1 All works upto plinth level
5.33.1.1 Concrete of M25 grade with minimum cement cum 204 9504.75 1938969
content of 330 kg /cum
5.33.2 All works above plinth level upto floor V level
5.33.2.1 Concrete of M25 grade with minimum cement cum 357 9860.4 3520162.8
content of 330 kg /cum
6.0 MASONRY WORK
6.1S General
Brick work with common burnt clay F.P.S. (non
6.1 modular) bricks of class designation 7.5 in
foundation and plinth in:
10.0 STEEL WORK
10.1S General
10.2 Structural steel work riveted, bolted or welded Kg 8000 133.7 1069600
in built up sections, trusses and framed work,
10 including cutting, hoisting, fixing in position and
applying a priming coat of approved steel
primer all complete.
13.0 FINISHING
13.11S CEMENT PLASTER IN TWO COATS
13.12 18 mm cement plaster in two coats under layer Sqm 3382 537.45 1817655.9
12 mm thick cement plaster 1:5 (1 cement : 5
11 coarse sand) and a top layer 6 mm thick
cement plaster 1:3 (1 cement : 3 coarse sand)
finished rough with sponge.
13.44S EXTERIOR FINISHING
MUMBAI- CST-DIVISION-ENGG/CENTRAL RLY
Finishing with Deluxe Multi surface paint system
13.48 for interiors and exteriors using Primer as per
manufacturers specifications :
13.48.1 Two or more coats applied on walls @ 1.25 Sqm 2422 193.7 469141.4
12 ltr/10 sqm over and including one coat of
Special primer applied @ 0.75 ltr /10 sqm
15.0 DISMANTLING AND DEMOLISHING
15.1S General
15.3 Demolishing R.C.C. work manually/ by cum 30 3551.25 106537.5
mechanical means including stacking of steel
13 bars and disposal of unserviceable material
within 50 metres lead as per direction of
Engineer - in- charge.
Demolishing brick work manually/ by
mechanical means including stacking of
15.7 serviceable material and disposal of
unserviceable material within 50 metres lead as
per direction of Engineer-in-charge.
15.18 Dismantling steel work in built up sections in Kg 5000 5.65 28250
angles, tees, flats and channels including all
15 gusset plates, bolts, nuts, cutting rivets,
welding etc. including dismembering and
stacking within 50 metres lead.
26.0 NEW TECHNOLOGIES AND MATERIALS
26.41S NEW TECHNOLOGY ITEMS
Providing and laying factory made Precast
concrete solid blocks of 200 mm thickness of
26.69 grade M10 made of C&D waste from approved
manufacturer in superstructure above plinth
level up to floor V level
26.73S PREFAB/PRECAST TECHNOLOGY
26.81 Providing and fixing Scaffolding net of required Sqm 1350 29.25 39487.5
width made of high density Polyethylene UV
stabilized knitted on warp knitting machines
having density 100 grams / sqm and shading
coefficient minimum 75% around the
construction site/ for vertical extension as per
requirement including fastening/tying with
building/scaffolding pipes or with any other
fixtures etc. complete as per direction of
Engineer-in-Charge. (One time payment shall
be made for providing Scaffolding net from start
of work till completion of work including shifting
if any. The Scaffolding net shall be the property
of the contractor on completion of the work)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ScopeofworkWB.pdf
ATTACHMENT
ANnexureVA.pdf
ATTACHMENT
AnnexureVIB.pdf
ATTACHMENT
ChecklistfordocumentforCivilTrackR.pdf
ATTACHMENT
GCC april2022
ATTACHMENT
GCCACS-1.pdf
ATTACHMENT
GCCACS-2.pdf
ATTACHMENT
GCCACS-3.pdf
ATTACHMENT
GCCACS-4.pdf
ATTACHMENT
GCCACS-5.pdf
ATTACHMENT
GCCACS-6.pdf
ATTACHMENT
GCCACS6CS
ATTACHMENT
ACSNo.7toGCCJuly2022.pdf
ATTACHMENT
ACSNo.8toGCCJuly2022.pdf
ATTACHMENT
ACSNo9toGCCJuly2022.pdf
ATTACHMENT
ACS10toGCC2022.pdf
ATTACHMENT
Auditparasubsectioning.pdf
ATTACHMENT
AdditionalSpecialconditionfortender1.pdf
ATTACHMENT
SplCond1cr.pdf
ATTACHMENT
SafetyRules.pdf
ATTACHMENT
CivilConditions_1.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
2022-CE-I-CT-GCCCorrespondencedated.14.05.2024.pdf
ATTACHMENT
Download all tender documents and submit your bid