Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | ₹2.6 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹2.7 LRejected-AOC | ₹2.7 L | L2 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | Sree Bharath Kathir Corporation L1 | Shree Saravana Contructions L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation depositing on Bank with initial lift of 2 meters in hard stilt clay stilt bleak cotton hard red earth Murrain, gravel stony earth and earth mixed with small size boulders and hard gravely soils (ss 20B) etc., complete.
All types of Soil | 22 | M3 | 197 ₹4,334 | 210 ₹4,620 |
| 2.00 | Plain Cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges including mixing, laying consolidating and curing etc., complete asper standard specification . | 3 | M3 | 5,571 ₹16,713 | 5,600 ₹16,800 |
| 3.00 | Centering for sides and soffits for all type of RCC work including cost of conveyance of all materials to site and all labour charges complete as per the specification.
Without Strutting | 46.57 | M2 | 488 ₹22,726.16 | 500 ₹23,285 |
| 4.00 | With Strutting | 29 | M2 | 978 ₹28,362 | 1,000 ₹29,000 |
| 5.00 | Plain Cement concrete 1:2:4 mix (One cement three sand and six aggregate) using 20mm ISS metal including mixing, laying, consolidating curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification. | 11 | M3 | 7,040 ₹77,440 | 7,100 ₹78,100 |
| 6.00 | Finishing the top of flooring with Granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 6 to 12mm stone chips – 25mm tk etc., Complete. | 11 | M2 | 168 ₹1,848 | 175 ₹1,925 |
| 7.00 | Supply to steel with fabrication including cost and conveyance of all materials to site and charges etc. complete | 560 | Kg | 91.9 ₹51,464 | 100 ₹56,000 |
| 8.00 | Reinforced cement concrete 1:1.5:3 mix (One cement one and half sand and three aggregate) using 20mm ISS HBG metal from the approved quarry including mixing, laying, consolidating, curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 7 | M3 | 8,665 ₹60,655 | 8,700 ₹60,900 |
Tender Value
₹3.2 L
EMD Value
₹6,400
Closing Date
6 Mar 2026, 3:00 pmClosed
E.O Karumandichellipalayam Town Panchayat
E.O Karumandichellipalayam Town Panchayat
Repairs to the Existing Damaged Culvert in Karumandichellipalayam Town Panchayat
2026_DTP_671181_1
147/2025-13
Open Tender
Civil Works
Karumandichellipalayam Town Panchayat
AS PER NORMS
2 documents required · 2 mandatory
₹0
₹6,400
19 Mar 2026
6 Mar 2026
6 Mar 2026
6 Mar 2026
6 Mar 2026
6 Mar 2026
6 Mar 2026 - 6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation depositing on Bank with initial lift of 2 meters in hard stilt clay stilt bleak cotton hard red earth Murrain, gravel stony earth and earth mixed with small size boulders and hard gravely soils (ss 20B) etc., complete.
All types of Soil | 22 | M3 | - | - |
| 2 | Plain Cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges including mixing, laying consolidating and curing etc., complete asper standard specification . | 3 | M3 | - | - |
| 3 | Centering for sides and soffits for all type of RCC work including cost of conveyance of all materials to site and all labour charges complete as per the specification.
Without Strutting | 46.57 | M2 | - | - |
| 4 | With Strutting | 29 | M2 | - | - |
| 5 | Plain Cement concrete 1:2:4 mix (One cement three sand and six aggregate) using 20mm ISS metal including mixing, laying, consolidating curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification. | 11 | M3 | - | - |
| 6 | Finishing the top of flooring with Granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 6 to 12mm stone chips – 25mm tk etc., Complete. | 11 | M2 | - | - |
| 7 | Supply to steel with fabrication including cost and conveyance of all materials to site and charges etc. complete | 560 | Kg | - | - |
| 8 | Reinforced cement concrete 1:1.5:3 mix (One cement one and half sand and three aggregate) using 20mm ISS HBG metal from the approved quarry including mixing, laying, consolidating, curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 7 | M3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_806620.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid