Tender Value
₹333.0 Cr
EMD Value
₹1.7 Cr
Closing Date
9 Mar 2026, 11:00 amClosed
Yes (up to 4 members)
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
Yes
02/12/2025 11:00
Lowest to Highest
180 days
Expenditure
Capital (Works)
TRD/CN/BNC
13 conditions · 2 needing a document upload
As per RFP document attached
As per RFP document attached
10 conditions · 3 needing a document upload
As per RFP Document attached
Please refer RFP document attached.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
DESIGN, SUPPLY, ERECTION, TESTING, COMMISSIONING OF 2X25 KV OHE AND PSI SYSTEM (TSS's SP's AND SSP's) INCLUDING ELECTRICAL GENERAL SERVICES, ENGINEERING WORKS BETWEEN URUKERE (EXCL.) (CH:11/687) TO TAVAREKERE (INCL.) (CH:66/400) AND CHITRADURG (EXCL.) (CH:142/920) T0 TOLAHUNSE (EXCL.) (CH:192/524) OF TK-DVG SECTION (104.317 RKM/128.013TKM) ALONG WITH DESIGN, SUPPLY, ERECTION, TESTING, COMMISSIONING OF 220KV/25KV TRACTION SUBSTATION AT CHIKKAMAGALURU AND SHIKARIPURA WITH TRANSMISSION LINE PROVISION FROM GSS
ECN-TRD-05-2025
ECN-TRD-05-2025
Open
Works - General
24 Months
Bengaluru Urban, Karnataka
₹0
₹1.7 Cr
9 Mar 2026
18 Oct 2025
1 item across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | :- DESIGN, (TSS's SP's AND URUKERE (EXCL.) (CH:142/920) T0 RKM/128.013TKM) ALONG TRACTION PROVISION FROM GSS | SUPPLY, ERECTION, TESTING, SSP's) INCLUDING ELECTRICAL (CH:11/687) TO TAVAREKERE TOLAHUNSE (EXCL.) (CH:192/524) WITH DESIGN, SUPPLY, SUBSTATION AT CHIKKAMAGALURU | OHE COMMISSIONING |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
HFLDATA.pdf
EPCcorrigendumforTK-DVG.pdf
TI-IN-0042OHEguidelines_1.pdf
TI-IN-0043rev.0PSIguidelines.pdf
ST-JPO_Dated22.12.2023.pdf
1ESP-URUKEREYARD07.02.2020_V32_DYCE-PLG-CN-BNC_P1422_1.pdf
2ESP-THIMMARAJANAHALLIYARD_V47_APPROVE_P202.pdf
3ESP_JOGIHALLI.pdf
4ESP_CHIKKANAHALLI.pdf
5ESP_SIRA.pdf
6ESP_TAVARKERE.pdf
7REV-CHITRADURGACP_V1_SSE-WORKS-1-CN-DVG_P14.pdf
8ESP-LAKSHMISAGARA-MASTERPLAN_V13_APPROVE_P641.pdf
9ESP-SIRIGEREROADMASTERPLAN_V14_DRM-MYS_P67.pdf
10ESP-BHARMASAGARA-MASTERPLAN_V18_APPROVE_P921.pdf
11ESP-HEBBALUMASTERPLANWITHPHASEPLANS_V13_APPROVE_P87.pdf
12ESP-ANAGODUMASTERPLANWITHPHASEPLANS_V15_APPROVE_P89.pdf
13ESP-PRO.CONNECTIVITYARRANGEEMNTSFORTK-DVGLINEATTOLAHUNSE-MASTERPLAN_V41_DYCEE-TRD-2-CN-BNC_P69.pdf
drawingforChitradurga-Tholahunse.pdf
SectioningdrawingforUrukere-Tavarekere_1.pdf
TOWERWAGONSHED1.pdf
OHEDEPOT.pdf
controlroomsporSSP1.pdf
controlroomTSS.pdf
PREBIDMEETINGLINK.pdf
TK-DVGRERFPDOCUMENTFinal.pdf
TKDVGREEPCDraftagreement.pdf
HFLDATA.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].