| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.6 LAccepted-AOC | ₹17.6 L Quoted ₹14.9 L | L1 | Accepted-AOC L1 bidder |
| 2 | Rejected-Technical AT ABHAYPUR PO ORIENT COLLIERY BRAJRAJNAGAR DIST JHARSUGUDA ODISHA 768216 | BRAJRAJNAGAR | JHARSUGUDA | ODISHA | 768216 | - | - | Rejected-Technical L2 bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 bidder |
Tender Value
₹29.9 L
EMD Value
₹37,400
Closing Date
17 Mar 2026, 6:00 pmClosed
STAFF OFFICER CIVIL,ORIENT AREA
OFFICE OF THE GENERAL MANAGER,ORIENT AREA
Heightening and repairing of boundary wall of mine no.-02 under Orient Sub Area of OA
2026_MCL_355761_1
MCL/GM/OA/SO(C)/e-T/25-26/62 dtd.06.03.2026
Open Tender
Civil Works - Others
Percentage
60 days
OFFICE OF THE GENERAL MANAGER, ORIENT AREA
Please refer Tender documents.
3 documents required · 3 mandatory
₹37,400
16 Jun 2026
6 Mar 2026
18 Mar 2026
7 Mar 2026
17 Mar 2026
7 Mar 2026
7 Mar 2026 - 12 Mar 2026
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge..In cement mortar
in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.. All kinds of soil.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting,propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for :Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Brick work with Fly Ash Brick (230x115x75 mm size) bricks of class designation 10 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with Fly Ash Brick (230x115x75 mm size) bricks of class designation 10 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
White washing with lime to give an even shade : New work (three or more coats)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form work for: Columns, piers, abutments, pillars, posts and struts
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apart and with9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I.barbed wire tied to angle iron, all complete as per direction of Engineerin- charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work
Carriage of Materials: By Mechanical Transport including loading,unloading and stacking: Lime, moorum, building rubbish Lead - 5 km
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.51 MB
Tendernotice_2.pdf
PDF • 2.46 MB
BOQ_368628.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .