Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.8 L
EMD Value
₹9,000
Closing Date
8 Mar 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO KTR (VP)
BDO KTR
Construction of Threshing Floor to Melkalvoy Main Road in Kalvoy Panchayat at KATTANKOLATHUR PANCHAYAT UNION
2024_RDTN_438243_1
819/2024/B5 Date 04.03.2024
Open Tender
Civil Works
Item Rate
90 days
BDO KTR
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹9,000
Yes
8 Mar 2024
4 Mar 2024
8 Mar 2024
4 Mar 2024
8 Mar 2024
4 Mar 2024
Amount
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
Supplying filling with filling sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete
Supplying and filling in basement with well gravel in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete.,
Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Plastering with CEMENT MORTAR 1:5 (one cement and five sand)12 mm. thick in all floor including curing etc.Complete complying with standard specification.
Cement concrete 1:2:4 mix using 20 mm hbg metal incl cost and conveyance of all charges.
Towards Cost and Supply of Bitumen Pad including all labour charges etc.
Earth work excavating and deposition on bank with intial lead and lift all clauses of soil such as hard stiff clay soil ,stiff black cotton soil small size boulders and hard gravel soil as per SS 20 B for foundation etc.,
Sand filling with river Msand including all cost and conveyance of all labour charges etc., Complete.
Cement concrete in 1:4:8 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete.,
Brick work in CM 1:5 mix using country bricks size of 9'' X 43/8'' x 23/4" including all cost and conveyance of labour charges etc.,Complte.
Brick work in CM 1:5 mix using country bricks size of 9'' X 43/8'' x 23/4" including all cost and conveyance of labour charges etc.,Complte.
Plastering with CM 1:5 mix 12mm thick including all cost and conveyance of labour charges etc., complete.
Flooring with Granolithic pattern Floor Finish including all cost and conveyance of labour charges etc.,
Supply and Fixing of 80mm GI pipe including all cost and conveyance etc.,
Supply and Fixing of Ac Sheet Roofing including all cost and conveyance etc.,
Painting the Plastered surface with two coats of ready mixed Plastic emulsion paint of Ist quality over one coat of priming coat for plastered surface including cleaning preparing the surface etc. complete. Complying with standared specification. The pain
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}12%
Sri Padhma Constructions
L.VENKATESAN
Monika Construction
stage.html
html • 0.02 MB
finance_521069.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .