| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 CrAdmitted-Finance | ₹5.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.8 Cr+₹45.6 L (8.59%)Admitted-Finance | ₹5.8 Cr+₹45.6 L (8.59%) | L2 | Admitted-Finance |
| 3 | L3₹6.4 Cr+₹1.1 Cr (21.1%)Admitted-Finance 419 NEW SONAL SERVICE IND ESTATE LINK ROAD MALAD W MUMBAI 400064 | MUMBAI SUBURBAN | MAHARASHTRA | 400064 | ₹6.4 Cr+₹1.1 Cr (21.1%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical MADHUBAN PO PARADIP DIST JAGATSINGHPUR 754 142 ODISHA | JAGATSINGHAPUR | ODISHA | 754142 | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | TECH FAST REBUILD PVT. LTD. L1 | BDS Projects India Pvt. Ltd. L2 | Dynasoure Concrete Treatement Pvt.Ltd. L3 |
|---|---|---|---|---|---|---|
| 1.00 | Access platform/working platform: The working platform above the Ground/water level shall be erected using the friction and hanging support. The above fixing and erection work shall be carried out with the help of floating pontoon and boats etc. including the cost of all materials, hire charges of boat, T&P, Port entry fees, all labour charges and divers etc. all complete excluding GST as directed by Engineer in charge. | 3,300 | Each Sqm. | 360 ₹11,88,000 Lowest | 1,950 ₹64,35,000 | 600 ₹19,80,000 |
| 2.00 | Surface preparation: The cover concrete shall be chipped and removed up to rear side of the steel bar shall be exposed using the electrically operated c hammer chipping machine and hand chiselling. It is recommended to use water jet for the removal of all loose particles, fungal and marine growth ncluding the cost of all labour, materials, T&P, Port entry fees, hire charges of comproser, pnumatic tools, hire charges of barge, boat, waterjet etc. all complete excluding GST as directed by Engineer in charge | 460 | Each Sqm. | 2,850 ₹13,11,000 | 425 ₹1,95,500 Lowest | 550 ₹2,53,000 |
| 3.00 | Anchoring shear connectors: In order to fix the shear connectors (secondary reinforcement) of 10 mm dia, holes shall be drilled at the required locations as per the drawings. The pilot holes shall be drilled using 10mm dia hammer drill bit. The holes shall be widened using the appropriate drill bit size 16/18 mm dia. Drilling shall be carried out without much of vibration so as not to disturb adjacent concrete. The holes shall be roughened for better bonding including the cost of all labour, materials, T&P, Port entry fees, hire charges hammer drilling machine and all consumables etc. all completeexcluding GST as directed by Engineer in charge. | 11,500 | Each No. | 290 ₹33,35,000 | 125 ₹14,37,500 Lowest | 650 ₹74,75,000 |
| 4.00 | Additional reinforcement: MS or RTS rebars as per the drawing shall be fabricated and placed in position including cost of all labour, materials, T&P, Port entry fees, fabrication charges etc. all complete excluding GST as directed by Engineer in chare. | 56 | Each MT | 88,000 ₹49,28,000 Lowest | 95,000 ₹53,20,000 | 1,00,000 ₹56,00,000 |
| 5.00 | Provision of sacricial anode: Sacrificial anode GALVASHIELD XPI or equivalent shall be fixed over the main reinforcement of the pile and bracket reinforcement at 1 No for 1 Sqm radius, as per the manufacturer specification including cost of all labour, materials, T&P, Port entry fees etc. all complete excluding GST as directed by Engineer in charge. | 11,500 | Eacn No. | 940 ₹1,08,10,000 | 650 ₹74,75,000 Lowest | 1,200 ₹1,38,00,000 |
| 6.00 | Form work:Slurry tight formwork which should not deform or leak due to pressure of micro concrete shall be fabricated and erected in position. Provision shall be made for pouring micro concrete into the form work, which shall be coated with mould release agent. Proper supporting arrangement shall be made for keeping the shutter in correct line and length including cost of all labour, materials, T&P, Port entry fees, hire charges of all machineries, boat, barge, pontoon, divers etc. all complete excluding GST as directed by Engineer in charge. | 460 | Each Sqm. | 5,600 ₹25,76,000 | 1,050 ₹4,83,000 Lowest | 1,200 ₹5,52,000 |
| 7.00 | Under water micro concrete for walls:Sufficient quantity of RENDROC WG shall be stocked along with 12 mm downgraded chips at site to enable completion of pouring in a continuous operation. An approved grout concrete mixer of slow speed heavy duty drill shall be used for the mixing of the micro concrete. Exact quantity of water as recommended by codal provisions should be poured in to mixing vessel along with the RENDROC WG and 12 mm cleaned chips (in the ratio of 1:0.50 or 0.75) slowly. The mix shall be mixed thoroughly in forced action. The mixed material should be placed immediately in the formwork continuously without any gap through the PVC pipe fixed or any other alternatives from the top of the deck including cost of all labour, materials, T&P, Port entry fees, cost of hire charges barges, pontoon, boat, all machineries diving equipment and divers etc. all complete but excluding GST as directed by Engineer in charge. | 920 | Each Sqm. | 15,150 ₹1,39,38,000 | 5,500 ₹50,60,000 Lowest | 15,500 ₹1,42,60,000 |
| 8.00 | Surface Preparation: Labour charges for chipping the joint portion between the walls. Clean the surface and make sure that surface is clean and free from loose particle. The rate shall include cost of equipments, plants, labour, materials, T&P, Port entry fees, sand, instrumentation, hiring of boat, catamaran, pontoon etc. all complete excluding GST as directed by Engineer in charge. | 788 | Each Sqm. | 550 ₹4,33,400 | 325 ₹2,56,100 Lowest | 450 ₹3,54,600 |
| 9.00 | Drilling and fixing: Drill 13 mm dia holes in to the concrete surface to a depth of 50 mm. The spacing of the holes should not be more than 600 mm centre to centre.Provision of nipple and fix the same using Polyester resin Lokfix S or equivalent. The rate shall include cost of all labour, materials, T&P, Port entry fees, operations etc. all complete excluding GST as directed by Engineer in charge. | 209 | Each Kg. | 300 ₹62,700 | 75 ₹15,675 Lowest | 150 ₹31,350 |
| 10.00 | PU Grouting: The suitable PU resin mechanically using a slow speed heavy duty drilling machine. Inject the same using an electrically operated pressure grouting machine (pressure not to exceed 4-5 kg/cm2) until the nipple refuses the grout or the grout comes out of the nearby nipple. In case the grout comes out of the adjacent nipples, the same may be closed and those nipples need not be grouted again. Continue the operation until all the nipples are grouted. Cut the nipple and finish the surface to match the nearby surface. The rate shall include cost of all labour, materials, T&P, Port entry fees, operations etc. all complete excluding GST as directed by Engineer in charge. | 126 | Each No. | 1,500 ₹1,89,000 | 950 ₹1,19,700 Lowest | 3,550 ₹4,47,300 |
Tender Value
₹6.3 Cr
EMD Value
₹12.5 L
Closing Date
30 Nov 2023, 5:15 pmClosed
EE,HWD-I,PPA
Office of the Harbour Works Division No.I, Engineering Department, Paradip Port Authority, First Floor, Administrative Building, Tele -06722-222020 Mob-9938935675
Repair and restoration to the damaged Berth and Diaphragm wall of NQ-II Berth inside Harbour area.
2023_MoS_780676_1
CE/HWDI/ACCTS-08/23/405
Open Tender
Civil Works
Works
300 days
Paradip
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Yes
As per eTCN and TD
₹12.5 L
Yes
26 Dec 2023
10 Nov 2023
1 Dec 2023
10 Nov 2023
30 Nov 2023
10 Nov 2023
Amount
Access platform/working platform: The working platform above the Ground/water level shall be erected using the friction and hanging support. The above fixing and erection work shall be carried out with the help of floating pontoon and boats etc. including the cost of all materials, hire charges of boat, T&P, Port entry fees, all labour charges and divers etc. all complete excluding GST as directed by Engineer in charge.
Surface preparation: The cover concrete shall be chipped and removed up to rear side of the steel bar shall be exposed using the electrically operated c hammer chipping machine and hand chiselling. It is recommended to use water jet for the removal of all loose particles, fungal and marine growth ncluding the cost of all labour, materials, T&P, Port entry fees, hire charges of comproser, pnumatic tools, hire charges of barge, boat, waterjet etc. all complete excluding GST as directed by Engineer in charge
Anchoring shear connectors: In order to fix the shear connectors (secondary reinforcement) of 10 mm dia, holes shall be drilled at the required locations as per the drawings. The pilot holes shall be drilled using 10mm dia hammer drill bit. The holes shall be widened using the appropriate drill bit size 16/18 mm dia. Drilling shall be carried out without much of vibration so as not to disturb adjacent concrete. The holes shall be roughened for better bonding including the cost of all labour, materials, T&P, Port entry fees, hire charges hammer drilling machine and all consumables etc. all completeexcluding GST as directed by Engineer in charge.
Additional reinforcement: MS or RTS rebars as per the drawing shall be fabricated and placed in position including cost of all labour, materials, T&P, Port entry fees, fabrication charges etc. all complete excluding GST as directed by Engineer in chare.
Provision of sacricial anode: Sacrificial anode GALVASHIELD XPI or equivalent shall be fixed over the main reinforcement of the pile and bracket reinforcement at 1 No for 1 Sqm radius, as per the manufacturer specification including cost of all labour, materials, T&P, Port entry fees etc. all complete excluding GST as directed by Engineer in charge.
Form work:Slurry tight formwork which should not deform or leak due to pressure of micro concrete shall be fabricated and erected in position. Provision shall be made for pouring micro concrete into the form work, which shall be coated with mould release agent. Proper supporting arrangement shall be made for keeping the shutter in correct line and length including cost of all labour, materials, T&P, Port entry fees, hire charges of all machineries, boat, barge, pontoon, divers etc. all complete excluding GST as directed by Engineer in charge.
Under water micro concrete for walls:Sufficient quantity of RENDROC WG shall be stocked along with 12 mm downgraded chips at site to enable completion of pouring in a continuous operation. An approved grout concrete mixer of slow speed heavy duty drill shall be used for the mixing of the micro concrete. Exact quantity of water as recommended by codal provisions should be poured in to mixing vessel along with the RENDROC WG and 12 mm cleaned chips (in the ratio of 1:0.50 or 0.75) slowly. The mix shall be mixed thoroughly in forced action. The mixed material should be placed immediately in the formwork continuously without any gap through the PVC pipe fixed or any other alternatives from the top of the deck including cost of all labour, materials, T&P, Port entry fees, cost of hire charges barges, pontoon, boat, all machineries diving equipment and divers etc. all complete but excluding GST as directed by Engineer in charge.
Surface Preparation: Labour charges for chipping the joint portion between the walls. Clean the surface and make sure that surface is clean and free from loose particle. The rate shall include cost of equipments, plants, labour, materials, T&P, Port entry fees, sand, instrumentation, hiring of boat, catamaran, pontoon etc. all complete excluding GST as directed by Engineer in charge.
Drilling and fixing: Drill 13 mm dia holes in to the concrete surface to a depth of 50 mm. The spacing of the holes should not be more than 600 mm centre to centre.Provision of nipple and fix the same using Polyester resin Lokfix S or equivalent. The rate shall include cost of all labour, materials, T&P, Port entry fees, operations etc. all complete excluding GST as directed by Engineer in charge.
PU Grouting: The suitable PU resin mechanically using a slow speed heavy duty drilling machine. Inject the same using an electrically operated pressure grouting machine (pressure not to exceed 4-5 kg/cm2) until the nipple refuses the grout or the grout comes out of the nearby nipple. In case the grout comes out of the adjacent nipples, the same may be closed and those nipples need not be grouted again. Continue the operation until all the nipples are grouted. Cut the nipple and finish the surface to match the nearby surface. The rate shall include cost of all labour, materials, T&P, Port entry fees, operations etc. all complete excluding GST as directed by Engineer in charge.
Drilling and fixing in underwater: Drill 20 mm dia holes in to the concrete surface to a depth of 100 mm. The spacing of the holes should not be more than 500 mm centre to centre. Provision of 16mm dia bolt and fix the same using equipment’s. The rate shall include cost of all labour, materials, T&P, Port entry fees, operations etc. all complete excluding GST as directed by Engineer in charge.
Supplying, fabricating and providing 10mm thick M.S plate to the required depth, as shown in the drawing including gas cutting ,bending, welding at yard & site, transporting, driving of liners, all labour, materials, T&P, Port entry fees, equipment’s, fuel etc. all complete excluding GST as directed by Engineer in charge.
Placing, Driving the M.S liners of the specifications as per item 12 above for walls. The cost inclusive of charges for transporting to the pile location, aligning, lowering, pitching and driving the liners as per standard specification, labour, materials, T&P, Port entry fees etc. all complete and excluding GST as directed by Engineer in charge.
Supply & fixing of 6mm dia bolts with proper arrangements has to be made for fixing the bolts, labour, materials, T&P, Port entry fees etc. all complete but excluding GST as directed by Engineer in charge.
BDS Projects India Pvt. Ltd.
Dynasoure Concrete Treatement Pvt.Ltd.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_820612.xls
BOQ • 0.29 MB
RepairNQIITD.pdf
Tender Documents • 1.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .