| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | ₹2.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.1 Cr+₹7.0 L (3.43%)Rejected-AOC 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹2.1 Cr+₹7.0 L (3.43%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.1 Cr+₹7.2 L (3.54%)Rejected-AOC 13B ELLORA ENCLAVE DAYAL BAGH AGRA U P | AGRA | AGRA | UTTAR PRADESH | ₹2.1 Cr+₹7.2 L (3.54%) | L3 | Rejected-AOC L3 |
| 4 | L4₹2.1 Cr+₹9.7 L (4.79%)Rejected-AOC 201 MAJNAWAN FAIZABAD SADAR FAIZABAD 224001 | FAIZABAD | AYODHYA | UTTAR PRADESH | 224001 | ₹2.1 Cr+₹9.7 L (4.79%) | L4 | Rejected-AOC L4 |
| 5 | Rejected-Technical 947 C ASHOK NAGAR COLONY HUMAYUNPUR POLICE STATION GORAKHNATH DISTRICT GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | - | - | Rejected-Technical As pre uploaded |
Tender Value
Refer Docs
EMD Value
₹5.3 L
Closing Date
1 Feb 2021, 1:00 pmClosed
Superintending Engineer
Superintending Engineer, Rapti Nahar Nirman Mandal-2 Basti U.P.
Construction of D.R.B at Km. 51.306 of Campierganj Branch.
2021_UPIDC_549023_3
04/SE/2020-21
Open Tender
Civil Works
Item Wise
90 days
Maharajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹5.3 L
Yes
14 May 2021
27 Jan 2021
1 Feb 2021
27 Jan 2021
1 Feb 2021
27 Jan 2021
Amount
Earth work in excavation of foundation of structures in all type of soil including lead upto 30M and lift upto 3.5M and its proper disposal and back fillings as per direction of Enginner-in-charge required for proper completion of work including cost all labour, T&P etc.
Laying Cement Concrete in A40/M10 mix with cement coarse sand, and stone grit including upto 60M and lift upto 3M with mechanical mixing and vibration including cost of all material, labour T&P etc. complete
Centering & Shuttering RCC workwith all lead and lift required for proper completion of works including all cost of material, labour T&P etc.
Laying Rainforce cement concrete A20/M25 mix with cement coarse sand & stone grit including lead upto 60M sand lift upto 3M with mechanical mixing and vibration including cost of all material, labour T&P etc. all complete.
Laying Rainforce cement concrete A20/M30 mix with cement coarse sand & stone grit including lead upto 60M sand lift upto 3M with mechanical mixing and vibration including cost of all material, labour T&P etc. all complete.
Cutting, Bending, Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures required for proper completion of work including cost of all materials, labour, carriage,rehandling and T.& P. etc.
S/F 20mm thick joint filler board i/c cost of all material, labour T&P etc. complete for proper completion of works
Hire charge of pumps with cost of all material, labour T&P etc. complete for proper completion of works
Providing expansion joint in R.C.C. including placing and fixing of angle iron & MS Plate and filling with sealing compound required for proper completion of work including cost of all material, labnour and T.& P. etc.
S/ F Drainage spout in RCC slab required for proper completion of work including cost of all materials, labour, T.& P. etc.
Earth work in making canal bank section in filling reach by transported earth up to 1 km per cum. (cutting )
Earth work in making canal bank section in filling reach by transported earth up to 1 km per cum. (filling )
Earth work in filling with proper compaction in road diversion of structures of Campierganj Branch with a lead of 30M and lift upto 3.5M including all labour T&P etc. for proper completion of work including cost of all materials, labour, T.& P. etc.
Brick on Edge Soling on road diversion with preparation of subgrade and filling joints with local earth with proper completion of work including cost of all material, labour and T.& P. etc.
Dismentling of brick on eadge soiling its stacking at proper place of existing road.
Dismantling of brick on Edge Soling on road diversion after completion of structure including cost of all material, labour and T.& P. etc.
Excavation of earthwork of road diversion after completion of structure including cost of all material, labour and T.& P. etc.
Resoiling of dismelted brick on eadge soiling at service road and right bank. (50% of brick on edge soling )
M/S CHAUDHARY ENTERPRISES
NIKHIL CONSTRUCTION
M/S V.K. CONSTRUCTION
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .