Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹15.3 L+₹49,949.74 (3.37%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹15.8 L+₹96,296.30 (6.50%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Jagdish Parsad Sharma L3 | M/s Kailash Chand Sharma L2 | RANA ASSOCIATES L1 |
|---|---|---|---|---|---|---|
| 1.00 | Silt clearance including lift up to 1.50 M and lead upto 6 M. by JCB Including ramming cost of driver/assistant driver,POL,maintenance of machine,contractor profit,texes but excluding leveling,dressing and compaction. | 22,111 | Cum | 45 ₹9,94,995 | 43.24 ₹9,56,079.64 Lowest | 59 ₹13,04,549 |
| 2.00 | Earth work in silt clearance with slush ,lahel and cartage upto 1.00 Km including lift up to 1.50 M and lead upto 30 M. Including ramming and dressing by JCB machine labour . the earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in-chaarge . | 3,053 | Cum | 180 ₹5,49,540 | 177.6 ₹5,42,212.8 | 54.9 ₹1,67,609.7 Lowest |
| 3.00 | Uprooting jhunds Including Back Filling and dressing | 1,040 | No | 33 ₹34,320 | 32.9 ₹34,216 | 10 ₹10,400 Lowest |
Tender Value
₹16.3 L
EMD Value
₹32,620
Closing Date
6 Oct 2026, 4:00 pmClosed
EE BDGC BSR
EE BDGC BSR
SILT CLEARANCE OF BULANDSHAHR DY. FROM KM 0.200 TO KM 25.450
2026_UPIDC_1188144_33
04/EE/2026-27
Open Tender
Civil Works
Item Rate
30 days
Bulandshahr
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹32,620
9 Oct 2026
1 Oct 2026
6 Oct 2026
1 Oct 2026
6 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt clearance including lift up to 1.50 M and lead upto 6 M. by JCB Including ramming cost of driver/assistant driver,POL,maintenance of machine,contractor profit,texes but excluding leveling,dressing and compaction. | 22,111 | Cum | - | - |
| 2 | Earth work in silt clearance with slush ,lahel and cartage upto 1.00 Km including lift up to 1.50 M and lead upto 30 M. Including ramming and dressing by JCB machine labour . the earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in-chaarge . | 3,053 | Cum | - | - |
| 3 | Uprooting jhunds Including Back Filling and dressing | 1,040 | No | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.90 MB
BOQ_2248831.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .