Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.0 LAdmitted-Fee/PreQual/Technical/Finance | -40.00% | ₹9.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹9.3 L+₹33,286.64 (3.70%)Admitted-Fee/PreQual/Technical/Finance | -37.78% | ₹9.3 L+₹33,286.64 (3.70%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹10.0 L+₹95,539.71 (10.6%)Admitted-Fee/PreQual/Technical/Finance | -33.63% | ₹10.0 L+₹95,539.71 (10.6%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹10.2 L+₹1.2 L (13.7%)Admitted-Fee/PreQual/Technical/Finance | -31.76% | ₹10.2 L+₹1.2 L (13.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹10.9 L+₹1.9 L (20.7%)Admitted-Fee/PreQual/Technical/Finance | -27.60% | ₹10.9 L+₹1.9 L (20.7%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹15.0 L
EMD Value
₹29,980
Closing Date
25 Aug 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SMC REGAL LANE LAL CHOWK
Improvement of side drain from Safakadal main road via Deeco Enterprises upto Sekidaffar (both sides)
2026_HAUDD_319413_2
NOTICE INVITING ETENDER No. 25 of 2026-2027 Dated 04.08.2026 RRWD SMC
Open Tender
Civil Works
Percentage
90 days
Enterprises upto Sekidaffar (both sides)
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹607
FA/CAO AC NO 0216010200000007
₹29,980
29 Aug 2026
5 Aug 2026
27 Aug 2026
6 Aug 2026
25 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Silt clearance from canals. Inclusive of initial lead and lift (50m & 1.5m respectively)Wet | 7.79 | Cum | 184.8 | ₹1,439.59 |
| - | Taking out existing Kerb Stones of all types from Footpath/central verge, including removal of marotar etc disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of unserviceable material within 50 meters lead as per directions of EIC | 326 | Rmt | 27.8 | ₹9,062.8 |
| - | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 32.79 | Cum | 1,725.2 | ₹56,569.31 |
| - | Removal of Mulba/Unhygienic Material/Mud/unserviceable material from the site including its disposal beyond Municipal Limits by Mechanical Transport including all carriages, leads and Lifts complete job as directed at site. | 29.51 | Cum | 350 | ₹10,328.5 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 31.49 | Cum | 6,591.25 | ₹2,07,558.46 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 103.35 | Sqm | 286.35 | ₹29,594.27 |
| - | 12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 fine sand) | 85.78 | Sqm | 283.8 | ₹24,344.36 |
| - | Laying at or near Ground level old Kerb Stones of all types in position t the required line, level and curvature, jointed with cement mortar 1:3 (1 Cement: 3 Coarse Sand) including making joints with or without grooves (thickness or joints, except at sharp curve shall not be more than 5 mm), including making drainage opening wherever required etc complete as per direction of EIC (Length of finished kerb edging shall be measured for payment). | 79.51 | Rmt | 87.05 | ₹6,921.35 |
| - | Providing and laying rough chisel dressed Devri Stone in kerbs, of size 200x200 mm face with chamfer in cement mortar 1: 6 (1 cement : 6 coarse sand) including curing. | 19.88 | Sqm | 2,616.2 | ₹52,010.06 |
| - | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 5,962.01 | Kgs | 181.6 | ₹10,82,701.02 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_1058565.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .