Loading…
Loading…
Tender Value
₹45.6 L
EMD Value
₹92,000
Closing Date
14 Jul 2026, 6:00 pm
EE WR Division Dausa
EE WR Division Dausa
Renovation of main canal from one km to two km Kalakho Dam Village Kalakho Dist Dausa
2026_WRDAS_571812_3
NIT 02/2026-27_MJSA
Open Tender
Civil Works
240 days
under jurisdiction of EE Dausa Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
as per nit
₹92,000
Yes
29 Jun 2026
29 Jun 2026
15 Jul 2026
29 Jun 2026
14 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 1,075 | Sqm | 220 | ₹2,36,500 |
| 2 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. | 358.6 | Cum | 200 | ₹71,720 |
| 3 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 9,542.69 | Kg. | 89 | ₹8,49,299.41 |
| 4 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil | 275 | Cum | 95 | ₹26,125 |
| 5 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor s density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With lead beyond 250 m and up to 750 m ( Km)
Deduct in item no 16 (a) to (d) above if Standard Proctor s density to be achived is at least 95 | 940.72 | Cum | 127.5 | ₹1,19,941.8 |
| 6 | (i) Compaction of earth or highly weathered strataBy mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of.at least 95% of Standard Proctor s density | 940.72 | Cum | 39 | ₹36,688.08 |
| 7 | Watering of earth including cost of carriage of water when source of water is up to 1 Km | 940.72 | Cum | 12.6 | ₹11,853.07 |
| 8 | Supplying and laying quarry spalls properly graded but not more than 10cm in size with spreading in required profile including all leads & lifts | 72 | Cum | 815 | ₹58,680 |
| 9 | Supplying stone, spall and laying Rip rap in required profile properly hand packed using stone of specified size including all lead & lifts 23 cm thickness ( 5 % thickness tolerance) | 46 | Cum | 1,712 | ₹78,752 |
| 10 | Add extra over item No. 1 to 7
For each subsequent height of 3.0 meter or part thereof above initial lift of 5.0 m from ground level. (upward and downward) | 525.6 | Cum | 200 | ₹1,05,120 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.54 MB
BOQ_1017503.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid