Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
7 Sept 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
executive engineer RNB Division vailoo
Up gradation of road surface by way of construction of Retaining wall in mass concrete on Daimal Brah road
2020_PWDJK_102758_4
NIT52VAILOODIVISION
Open Tender
Civil Works
Item Rate
10 days
Brah
Please refer Tender documents.
4 documents required · 4 mandatory
₹300
Yes
Executive Engineer RNB Division vailoo
₹12,000
Yes
8 Sept 2020
24 Aug 2020
8 Sept 2020
25 Aug 2020
7 Sept 2020
25 Aug 2020
120 days
Amount
Earth work excavation by Maually means in treches for foudation , exceeding 30 cm in depth 1. 5 m in width as well as 10 sqm on plan including disposal of excavated earth lead up to 50 m and lift up to 1.5 m disposed earth to be leveled and neatly dressed . All kinds of soil or as directed by engineer at site complete job.
P/L of stone soling nalah hand packing incld all carraiges complete job.
Providing and laying in position cement concrete of specified grade Of 1:4:8 mix ( 1 cement : 4 coarse sand : 8 graded stone agg.40 mm nominal size excluding cost of centering and Shuttering all work up to plinth level icludig all carriages complete job.
Providing and laying in position cement concrete of specified grade Of 1:3:6 mix ( 1 cement : 3 coarse sand : 6 graded stone agg.20 mm nominal size excluding cost of centering and Shuttering all work up to plinth level icludig all carriages complete job.
Centering and shuttering incld. Strutting, propping etc and removal of form work for : .Foundations , footings , bases of olumns etc.
Supplying and filling of khak bajree with 90% metal spreading , levelling , ramming , watering , compacting consolidation with PRR 8-10 tone capacity , loading , unloading all carriages involved complete job.
Felling of trees of the girth measured at height of 1 m above ground level) including cutting of trunks and branchs removing of roots and stacking of serviceable material material and disposal of unserviceable material up to lead , lift as required complete c) Beyond 120 cm girth up to and including 240 cm girth
mohammad ibrahim waza
NASIR HUSSAIN SHAH
stage.html
html • 0.02 MB
finance_195932.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .