Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.3 L+₹19,353.60 (6.29%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹4.0 L+₹92,064 (29.9%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹4.5 L+₹1.4 L (45.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹4.5 L+₹1.4 L (45.5%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹14,640
Closing Date
21 Sept 2026, 4:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
C/O OF TILE LANE FROM ISMAIL BHAT MAIN ROAD BUGAM AND OTHERS KOKA MAHLA AT NANIBUGH 649
2026_RDPR_324388_8
e- NIT No. 77 OF REWK/2026-27 Dated 12-09-2026
Open Tender
Civil Works
Percentage
30 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
EX ENGINEER REW KULGAM
₹14,640
29 Sept 2026
12 Sept 2026
22 Sept 2026
12 Sept 2026
21 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches or drains by mannual means in all kinds of soil. | 30.73 | cum | 479.3 | ₹14,728.89 |
| 2 | P/L stone solling hand packed including all carriages. | 18.13 | cum | 1,266.2 | ₹22,956.21 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).including all carriages | 53.4 | cum | 5,733.6 | ₹3,06,174.24 |
| 4 | Form work in ordinary timber planks for in situ concrete work. | 115.2 | sqm | 286.35 | ₹32,987.52 |
| 5 | P/L Factory made chamfered edge cement concrete paver blocks in footpath of M30 Grade 0.80mm thick over 50mm thick compacted sand bed all complete job. | 55.8 | sqm | 749 | ₹41,794.2 |
| 6 | Carriage of sand /aggregates by MT | 55.8 | cum | 465.14 | ₹25,954.81 |
| 7 | Carriage of cement/tiles by trips | 2 | no | 750 | ₹1,500 |
| 8 | photograph /signboard charges(2.5X2.5)size | 1 | job | 1,904.13 | ₹1,904.13 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_1094216.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .