Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹14.5 L
EMD Value
₹15,000
Closing Date
15 Sept 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer (B.P)
Annavasal Block
PACK 4 - AD WELFARE SCHEME - ANNAVASAL BLOCK - PUDUKKOTTAI
2022_RDTN_251032_1
PACK-4 - AD WELFARE SCHEME - ANNAVASAL BLOCK -
Open Tender
Civil Works - Buildings
Item Rate
180 days
ANNAVASAL
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹15,000
22 Sept 2022
10 Sept 2022
15 Sept 2022
10 Sept 2022
15 Sept 2022
10 Sept 2022
Amount
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per ss 20 B.
Supplying and Filling and Basemant with M-Sand in Layers not More than 15cm Thick including cost and conveyance of sand to work site including all labour charges for filling etc complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:2:4 mix for using 20mm ISS BG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Reinforced Cement Concrete 1:1.5:3 mix for RCC using 20mm ISS BG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for Sides and soffits including cost and conveyance and all labour charges etc., complete.
Supplying and fabrication of steel including cost and conveyance and all labour charges etc., complete.
Brick Work in Cement Mortor 1:5 mix using courntry bricks including cost and conveyance of all materials to site and all labour charges etc., complete
Plastering Ceiling with cement mortor 1:3 mix 10mm thick including cost of conveyance of all materials to work site and all labour charges etc., complete
Plastering with cement mortor 1:5 mix 12mm thick including cost of conveyance of all materials to work site and all labour charges etc., complete
Painting two coats with Exterior emulsion over one coat of primarycoat including clearing preparing the surface - NEW WALL
Cement Concrete Pavement
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per ss 20 B.
Supplying and Filling and Basemant with M-Sand in Layers not More than 15cm Thick including cost and conveyance of sand to work site including all labour charges for filling etc complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for Sides and soffits including cost and conveyance and all labour charges etc., complete.
Cement Concrete 1:2:4 mix for using 20mm ISS BG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Compound Wall
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per ss 20 B.
Supplying and Filling and Basemant with M-Sand in Layers not More than 15cm Thick including cost and conveyance of sand to work site including all labour charges for filling etc complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for Sides and soffits including cost and conveyance and all labour charges etc., complete.
Supplying and fabrication of steel including cost and conveyance and all labour charges etc., complete.
Reinforced Cement Concrete 1:1.5:3 mix for RCC using 20mm ISS BG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Brick Work in Cement Mortor 1:5 mix using courntry bricks including cost and conveyance of all materials to site and all labour charges etc., complete
Plastering with cement mortor 1:5 mix 12mm thick including cost of conveyance of all materials to work site and all labour charges etc., complete
Painting two coats with Exterior emulsion over one coat of primarycoat including clearing preparing the surface - NEW WALL
HAND PUMP
Conduction Geo Physical survey using scienfic instrument
Drilling of 150mm dia borewell in hard rock area anywhere in Pudukkottai District in the place shown by the Officers including transportation of rig and supporting vehicle from one place to another place including fuel, labour, etc., complete.
Loose Soil
Hard Rock
Supply and delivery of 150mm dia PVC Casing Pipe
Supply and delivery of India Mark - II Hand pumpset, 32mm G.I Pipe 30m pipe socket - 10nos with all accoessories
32mm GI raiser pipe (3M)
32mm GI raiser pipe coupling
Construction of Hand pump platfrom 1.85mm dia for India Mark -II hard pump as per TWAD type design in C.C.1:2:4 including mixing, Placing Curing etc., complete as directed by Officials.
Conveyance of Hand Pump set to site
Erection of India Mark II Hand Pumpset
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M R JAYAKUMAR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .