Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.6 LAccepted-AOC | L-1 | Accepted-AOC Agreement work complete |
Tender Value
₹5.4 L
EMD Value
₹54,025
Closing Date
5 Jun 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ce knn
ce knn moti jheel
Construction of Gullypit in various places in Vishnupuri ward 40 under zone-6
2026_NNKAN_1119133_3
655/AA-6/2025-26
Open Tender
Civil Works
Percentage
45 days
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹54,025
23 Oct 2026
26 May 2026
5 Jun 2026
26 May 2026
5 Jun 2026
26 May 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling cc brick Granolithic Floor etc all complete... | 62.4 | sqm | 67 | ₹4,180.8 |
| 2 | Dismentalling of B.O.E. soiling/Inter locking tile including Stacking of servicable material and disposal of unservicable material within a lead of 50m as per direction of EI/C (Labour only). | 25.3 | sqm | 11 | ₹278.3 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil directed, within a lead of 50 m including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil. | 90.72 | cum | 215 | ₹19,504.8 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:6:12 (1 Cement: 6 Coarse sand (zone-III): 12 graded Brick aggregate 40 mm nominal size). | 8.4 | cum | 4,380 | ₹36,792 |
| 5 | RCC hume pipe 350mm dia including material all complete work. | 84 | rmt | 1,300 | ₹1,09,200 |
| 6 | Supplying and filling in plinth with sand under floor, including watering ramming, consolidating and dressing all complete etc. | 25.2 | cum | 900 | ₹22,680 |
| 7 | Construction of gullypit as per knn including material all complete work. | 16 | nos | 5,180 | ₹82,880 |
| 8 | Construction of granular sub base (GSB) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavaton at OMC and compacting with vibratory roller to achieve the desired density, Complete as per MORT & H clause 402 | 12.6 | cum | 3,671 | ₹46,254.6 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 Cement : 2 Coarse sand (zone-III): 4 graded stone aggregate 20 mm nominal size). | 18.9 | cum | 6,750 | ₹1,27,575 |
| 10 | Cartage of earth upto 3.00 km including loading etc all complete. | 72.58 | cum | 116.96 | ₹8,488.96 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.99 MB
BOQ_2161878.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .