| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-Finance | ₹2.6 L | L1 | Accepted-Finance accepted being lowest |
| 2 | L2₹2.8 L+₹22,253.85 (8.61%)Rejected-Finance | ₹2.8 L+₹22,253.85 (8.61%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹3.1 L+₹52,437.15 (20.3%)Rejected-Finance | ₹3.1 L+₹52,437.15 (20.3%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹3.2 L+₹62,411.40 (24.1%)Rejected-Finance | ₹3.2 L+₹62,411.40 (24.1%) | L4 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Matul sharma govt cont. L1 | Santosh Sharma L4 | Dilbag Singh L2 | VIDAL SHARMA L3 |
|---|---|---|---|---|---|---|---|
| 1.00Providing and laying cement concrete 1:2:4 (1 cement : 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete complete excluding the cost of form work form work in:- | |||||||
| 1.10 | Foundations, footings bases of columns and the like mass concrete within all leads and lifts as per direction of Engineer-in-Charge. | 1.41 | Cum. | 7,700 ₹10,857 Lowest | 10,000 ₹14,100 | 10,000 ₹14,100 | 9,600 ₹13,536 |
| 2.00 | Steel work welded in built-up section, trusses and framed work including cutting hoisting, fixing in position and applying a priming coat of red lead paint in beams joists channels, angle cleats as in main and cross beam, hip and jack rafters, purlins connected to common rafters, steel gate and like within all leads and lifts as per the direction of Engineer-in- Charge. | 63.45 | Kg. | 77 ₹4,885.65 Lowest | 90 ₹5,710.5 | 80 ₹5,076 | 90 ₹5,710.5 |
| 3.00 | Providing Tor steel reinforcement for RCC.work including bending, binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in- Charge. | 1,882.05 | Kg. | 129 ₹2,42,784.45 Lowest | 160 ₹3,01,128 | 139 ₹2,61,604.95 | 155 ₹2,91,717.75 |
Tender Value
₹3.1 L
EMD Value
₹6,107
Closing Date
25 Jul 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION CHOWARI
AS PER NIT
2026_HPIPH_139116_1
NIT NO 7991-8090 DATED 15-07-2026
Open Tender
Civil Works - Water Works
Item Rate
30 days
CHOWARI CHAMBA HP
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
₹6,107
11 Aug 2026
16 Jul 2026
27 Jul 2026
16 Jul 2026
25 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing and laying cement concrete 1:2:4 (1 cement : 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete complete excluding the cost of form work form work in:- | |||||
| 1.1 | Foundations, footings bases of columns and the like mass concrete within all leads and lifts as per direction of Engineer-in-Charge. | 1.41 | Cum. | - | - |
| 2 | Steel work welded in built-up section, trusses and framed work including cutting hoisting, fixing in position and applying a priming coat of red lead paint in beams joists channels, angle cleats as in main and cross beam, hip and jack rafters, purlins connected to common rafters, steel gate and like within all leads and lifts as per the direction of Engineer-in- Charge. | 63.45 | Kg. | - | - |
| 3 | Providing Tor steel reinforcement for RCC.work including bending, binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in- Charge. | 1,882.05 | Kg. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_206073.xls
BOQ • 0.27 MB
FORM68.pdf
Tender Documents • 2.15 MB
corrigendum.pdf
PDF • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .