Loading…
Loading…
Tender Value
₹18.9 L
EMD Value
₹18,900
Closing Date
31 Aug 2026, 3:00 pm
BDO (B.Pt), Avudaiyarkoil
Pt.Union Office, Avudaiyarkoil.
Construction of Single Class Room Building at Mangalam PUES in Senganam Panchayat.
2026_RDTN_692687_1
1555/2026/A2
Open Tender
Civil Works
Item Rate
Avudaiyarkoil
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹18,900
10 Aug 2026
10 Aug 2026
31 Aug 2026
10 Aug 2026
31 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Construction of Single Class Room Building @ Mangalam PUES in Senganam Panchayat. | - | - | - | - |
| 1.1 | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc. complete. | 65.52 | cum | 100 | ₹6,552 |
| 0.9 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 8.57 | cum | 100 | ₹857 |
| 1.3 | Filling in Basement with excavated earth in layers of not more than 15cm,thick well rammed, watered and consolidated complying with standard specification etc.,complete | 12.6 | cum | 10 | ₹126 |
| 0.9 | Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 9.34 | Sqm | 10 | ₹93.4 |
| 1.5 | Brick work in following Cement Mortar 1:5 using best quality II class table moulded bricks 8"3/4 x 41/4" X23/4" for foundation and basement including curing etc.,complete complying with standard specification.including scaffolding curing cost of reinforcement etc.all complete as per specifications and drawings as directed by the Engineer in-charge. | 25.23 | cum | 10 | ₹252.3 |
| 0.0 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | - | - | - | - |
| 1.7 | Below G.L | 53.17 | Sqm | - | - |
| 0.0 | Above G.L | 142.21 | Sqm | - | - |
| 1.9 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | 31.22 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
schooltenderdocument.pdf
Tender Documents • 0.18 MB
BOQ_832926.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].