| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹94.8 LAdmitted-Finance | -0.36% | ₹94.8 L | L1 | Admitted-Finance |
| 2 | L2₹94.9 LAdmitted-Finance | -0.25% | ₹94.9 L | L2 | Admitted-Finance |
| 3 | L3₹95.1 LAdmitted-Finance | -0.05% | ₹95.1 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Disqualified due to non-submission of the original documents as required under Tender Condition |
| 5 | Rejected-Technical 01 GANGA ENTERPRISES MALEWADI BEED MAHARASHTRA 431515 UDYAM MH 05 0039352 | BEED | MAHARASHTRA | 431515 | - | - | - | Rejected-Technical Disqualified due to non-submission of the original documents as required under Tender Condition |
Tender Value
₹95.1 L
EMD Value
₹2.0 L
Closing Date
20 Apr 2026, 6:00 pmClosed
Executive Engineer (East), UPSRTC, Lucknow
Executive Engineer (East), U.P State Road Transport Corporation, Lucknow
Construction of Room block and offices for E.W.S. at Bus station Bareilly.
2026_UPSRT_1133875_1
263/B/DA/W/Tender/2026
Open Tender
Civil Works
Percentage
240 days
Bareilly
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Executive Engineer (East), UPSRTC, Lucknow
₹2.0 L
20 Jul 2026
6 Apr 2026
21 Apr 2026
6 Apr 2026
20 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :15.12.1 Of area 3 sq. metres and below | - | cum | 274.95 | - |
| 2 | Dismantling roofing including ridges, hips, valleys and gutters etc.,and stacking the material within 50 metres lead of. DSR 15.28.1 G.S.Sheet | - | cum | - | - |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.DSR 15.7.4 In cement mortar | - | cum | - | - |
| 4 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.DSR 15.56 | - | cum | - | - |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
2.7.1 All kinds of soil | - | qtl | - | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) DSR 4.1.11 | - | sqm | - | - |
| 7 | Brick work with common burnt clay (non modular) bricks of designation 7.5 in foundation and plinth in cement mortar 1:4 (1 cement :4 coarse sand . (SI 6.1.1) | - | sqm | - | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :DSR 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | - | sqm | - | - |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 5.3 | - | sqm | - | - |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.DSR 5.22.1 Mild steel and Medium Tensile steel bars | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Tender_documentsbareilly.pdf
Tender Documents • 1.01 MB
BOQ_2116544.xls
BOQ • 3.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].