| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC Work order done |
| 2 | L2₹1.3 CrRejected-Finance | ₹1.3 Cr | L2 | Rejected-Finance Financially Reject |
| 3 | L3₹1.4 CrRejected-Finance 413 512 | LATUR | MAHARASHTRA | 413512 | ₹1.4 Cr | L3 | Rejected-Finance Financially Reject |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
18 Dec 2025, 4:00 pmClosed
Assistant Director Department Of Archaeology
Soneri Mahal Chh sambhajinagar
Soneri Mahal Phase II Chhatrapati Sambhajinagar
2025_TCADM_1258248_1
Etender/Notice 09/2025-26
Open Tender
Civil Works - Others
730 days
Chhatrapati Sambhajinagar
Please Refer Tender Documents
3 documents required · 3 mandatory
₹1,180
₹1.3 L
13 Mar 2026
11 Dec 2025
19 Dec 2025
11 Dec 2025
18 Dec 2025
11 Dec 2025
Supplying and fixing on hiring/rental basis for the interval of six months in vertical position two telescopic M.S. prop spanning upto 1.5m under deflected beam/lintel/slab/chajjas by using teak wood battens of size 2000 x 150 x 40 for packing between prop plate and the beam/lintel/slab/chajjas bottom surface. Also tied with M.S.tube transom of 40mm dia and dismantling and removing from site when not required as per the directions of engineer-in-charge.
Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m.beyond the building area & stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Manual Means
Dismantling brickmasonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc.
Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete.
Removing lime or lean cement concrete including stacking the spoils as directed with all leads, lifts etc, complete.
Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete
Numbering the monument elements in proper order before lowering down with approved colour and shade as directed by Engineer in-charge, including ladder, scaffolding etc. complete.
Lowering down carefully existing stone masonry of the monument manually in proper order including shifting the stone elements up to a distance of 50 meter beyond the monument area and stacking them as directed by Engineer in-charge, removing building rubbish and cleaning the site etc. complete.
Construction of brick vaulted roof ( Dat Roof) as per old design of thickness upto 230 mm (or as per design) using special size bricks in lime surkhi mortar 1: 1/2 (1 lime : 1/2 surkhi ) including support frame in ply board /mud /wooden planks for making vault profile / shuttering/ centering and form work for temporary support structure required for the construction as directed by conservation consultants/ site- in-charge at all heights, including all leads and lifts. (Plan area of internal walls of constructed vault to be measured for the purpose of payment)
Providing and fixing Burma Teak Tie beam ,girder, joist rafters purlin of size ( Upto 6 mtr Span , 0.30m x 0.20m) for tie to vaulted roof walls as per direction of engineer incharge including scaffolding if necessory etc complete (12''x12'')
Dutchman repairs of stone sections that severely distressed, reinstallation of new Black basalt stone piece to match existing stone as a fascia of minimum 75mm depth of similar colour and texture and size. The size of the stone piece would be approx. of 150 x 200 mm to 600x 300 mm . The fixing of the new stone would employ mortar grout and anchoring technique after neatly cutting out damaged stone profile using one of the following tehnniques : a) Stainless steel pins of 6mm dia threaded at end
Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with average size of stone 60 cm. x 45 cm. x 22.5 cm. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete
Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with average size of stone 102.5 cm. x 45 cm. x 20 cm. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete For chajja
Providing and laying cast in situ 1:1:4 Lime Concrete of broken brick metal for coping or waterproofing as per detailed specifications and drawings or as directed including centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required, with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate or surkhi in drum mixer, the concrete must be bitten for two days with pouring water as per specifications, scaffolding, watering and all concrete work when handed over to be perfectly clean and free from all mortar stains, etc. complete.
Carving ornamental work on surface including moulding, grove, chisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete. The charges for chiseling & dressing on stone surface for ornamental carving work surface etc. as per existing design. pattern and form as directed by engineer in charge
Caving ornamental work including moulding, grove, clhisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete.
Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete.
Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete.
Providing and fixing Stone Paving, First Sort in lime mortar 1:1, with average size of stone 60 cm. x 45 cm. x 15 cm. as per detailed specifications and drawings or as directed including all stone slabs to of approved quality, hard, even, sound, durable and uniform thickness, the stones to be very finely chisel-dressed on the surface and the course to be of prescribed width, the joints running true, the stones to be laid with joints not exceeding 6 mm. (¼″) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Pavement.
Providing/Re-setting Stone Paving, Second Sort of reuse-stones in lime mortar 1:1½, per detailed specifications and drawings or as directed including the joints running true, the stones to be laid with joints not exceeding 8 mm. (5/16″) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Pavement.
Providing 12 mm. thick Rough Cast Lime Plaster in single coat in lime mortar 1½:1 in superstructure, as per detailed specifications and drawings or as directed including all joints in masonry and brick work are to be racked out to a depth of at least 20 mm. and the wall to be washed with fresh water and thoroughly wetted for six hours before plastering, the plaster to be applied in an even and uniform coat well pressed in to the joints and to be well beaten for 1½ days with hand tappers, the plaster should also be well sprinkle during the proses of beating with a mixture of 1.10 kg jaggary and 640 gram pulp of wood apple (Belfruit) in 90 to 135 litre of water, the plaster being wetted occasionally with fresh water while the beating is in progress, all exposed angles and junctions with door frame to be carefully finished, all mouldings shall be worked true to template and drawn neat, clean and level, soffits of arches must true arch of circle, preparing the lime mortar in lime miller with 1.60 kg Gugal (a kind of fragrant gum) and 960 gram chopped hemp (fibre of bhendi or tag ) per cubic metre of lime mortar as a bonding material, of lime as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete. !
Providing Fine Coat of Lime over rough cast plaster in superstructure, as per detailed specifications and drawings or as directed including the finishing coat is to be applied over rough cast plaster and well-polished with trowel, preparing the lime mortar, scaffolding and watering complete.
Disposing off / conveying the dismantelled materials of stone masonry / brick masonry/ concrete/ debris/ excavated material / soil murrum / rubbish material or vegetation / grass / shrubs etc. from site to 5 Km as directed by Engineer incharge
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
BOQ_2168679.xls
BOQ • 0.32 MB
tenderdraftsonerimahal.pdf
Tender Documents • 4.88 MB
Download all tender documents and submit your bid