| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.4 CrAdmitted-Finance DIPENDRA PATIL E 66 MIDC AREA AJANTHA ROAD 94222 JALGAON MAHARASHTRA 425003 | JALGAON | MAHARASHTRA | 425003 | ₹2.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.7 CrAdmitted-Finance OLYMPIA PLATINA PLOT NO 33B SOUTH PHASE GUINDY CHENNAI 600032 | CHENNAI | CHENNAI | TAMIL NADU | 600032 | ₹1.7 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CHHABI ELECTRICALS PRIVATE LIMITED L2 | Masstech Controls Pvt. Ltd. L1 | VERTIV ENERGY PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.10 | BATTERY CHARGER SYSTEM (RECTIFIER, 110V, PARALLEL REDUNDANT TYPE) FOR SWITCHGEAR CONTROL & PROTECTION AT NEW SUBSTATION
Each system comprising of the following
• 3 pole Battery Isolator box for each Battery charger system.
• Cell Booster.
• Copper cables from UPS to DCDB , UPS to Isolator box & Isolator box to battery bank
• All consumables for Testing, pre-commissioning, commissioning and start-up
b) 110V DCDB for Battery Charger System.
and other scope mentioned in technical MR | 1 | SET | 25,85,900 ₹30.5 L | 27,19,800 ₹32.1 L | 26,94,000 ₹31.8 L |
| 1.20 | Battery set for Battery charger system, Vented Ni-Cd type with 60 min Back-up time Battery Configuration (2x100%) for BoQ Sr. no 1.1 | 1 | SET | 23,40,000 ₹30.0 L | 23,66,000 ₹27.9 L | 25,68,000 ₹30.3 L |
| 2.10 | BATTERY CHARGER SYSTEM (RECTIFIER, 110V, PARALLEL REDUNDANT TYPE) FOR SWITCHGEAR CONTROL & PROTECTION AT GTF SUBSTATION
Each system comprising of the following
• 3 pole Battery Isolator box for each Battery charger system.
• Cell Booster.
• Copper cables from UPS to DCDB , UPS to Isolator box & Isolator box to battery bank
• All consumables for Testing, pre-commissioning, commissioning and start-up
b) 110V DCDB for Battery Charger System.
and other scope mentioned in technical MR | 1 | SET | 14,74,100 ₹17.4 L | 18,97,400 ₹22.4 L | 14,31,000 ₹16.9 L |
| 2.20 | Battery set for Battery charger system, Vented Ni-Cd type with 60 min Back-up time Battery Configuration (2x100%) for BoQ Sr. no 2.1 | 1 | SET | 11,36,000 ₹14.5 L | 11,28,000 ₹13.3 L | 11,21,000 ₹13.2 L |
| 3.10 | BATTERY CHARGER SYSTEM (RECTIFIER, 220V, PARALLEL REDUNDANT TYPE) FOR CRITICAL LIGHTING AT NEW SUBSTATION & GTF SUBSTATION.
Each system comprising of the following
• 3 pole Battery Isolator box for each Battery charger system.
• Cell Booster.
• Copper cables from UPS to DCDB , UPS to Isolator box & Isolator box to battery bank
• All consumables for Testing, pre-commissioning, commissioning and start-up
b) 110V DCDB for Battery Charger System.
and other scope mentioned in technical MR | 2 | SET | 44,44,800 ₹52.4 L | 29,99,000 ₹35.4 L | 26,47,000 ₹31.2 L |
| 3.20 | Battery set for Battery charger system, Vented Ni-Cd type with 60 min Back-up time Battery Configuration (2x100%) for BoQ Sr. no 3.1 | 2 | SET | 76,00,000 ₹97.3 L | 31,52,000 ₹37.2 L | 36,24,000 ₹42.8 L |
Tender Value
Refer Docs
Closing Date
15 Sept 2025, 2:30 pmClosed
Krishan Pal Singh
Technip Energies India Ltd. A4, Sector-1 Noida Uttar Pradesh 201301
Refer Tender Details
2025_REFHQ_186037_1
TP/214227C/DR/1672-0001 /1066
Limited
Electrical - All
210 days
IOCL DIGBOI REFINERY
Refer Tender Details
5 documents required · 5 mandatory
Exempted
Online
19 Jan 2026
29 Jul 2025
16 Sept 2025
29 Jul 2025
15 Sept 2025
18 Aug 2025
29 Jul 2025 - 7 Aug 2025
7 Aug 2025
BATTERY CHARGER SYSTEM (RECTIFIER, 110V, PARALLEL REDUNDANT TYPE) FOR SWITCHGEAR CONTROL & PROTECTION AT NEW SUBSTATION Each system comprising of the following • 3 pole Battery Isolator box for each Battery charger system. • Cell Booster. • Copper cables from UPS to DCDB , UPS to Isolator box & Isolator box to battery bank • All consumables for Testing, pre-commissioning, commissioning and start-up b) 110V DCDB for Battery Charger System. and other scope mentioned in technical MR
Battery set for Battery charger system, Vented Ni-Cd type with 60 min Back-up time Battery Configuration (2x100%) for BoQ Sr. no 1.1
BATTERY CHARGER SYSTEM (RECTIFIER, 110V, PARALLEL REDUNDANT TYPE) FOR SWITCHGEAR CONTROL & PROTECTION AT GTF SUBSTATION Each system comprising of the following • 3 pole Battery Isolator box for each Battery charger system. • Cell Booster. • Copper cables from UPS to DCDB , UPS to Isolator box & Isolator box to battery bank • All consumables for Testing, pre-commissioning, commissioning and start-up b) 110V DCDB for Battery Charger System. and other scope mentioned in technical MR
Battery set for Battery charger system, Vented Ni-Cd type with 60 min Back-up time Battery Configuration (2x100%) for BoQ Sr. no 2.1
BATTERY CHARGER SYSTEM (RECTIFIER, 220V, PARALLEL REDUNDANT TYPE) FOR CRITICAL LIGHTING AT NEW SUBSTATION & GTF SUBSTATION. Each system comprising of the following • 3 pole Battery Isolator box for each Battery charger system. • Cell Booster. • Copper cables from UPS to DCDB , UPS to Isolator box & Isolator box to battery bank • All consumables for Testing, pre-commissioning, commissioning and start-up b) 110V DCDB for Battery Charger System. and other scope mentioned in technical MR
Battery set for Battery charger system, Vented Ni-Cd type with 60 min Back-up time Battery Configuration (2x100%) for BoQ Sr. no 3.1
Description of Work / Item(s)
2 years Normal operational & maintenance spares (as per vendor recommendation) for details as per BOQ-1, item Sr No 1.1 & 1.2 (Spare no. - 1.01 (Mention the spare name and Qty in unpriced schedule)
Spare no. - 1.02 (Mention the spare name and Qty in unpriced schedule)
Spare no. - 1.03
Spare no. - 1.04
Spare no. - 1.05
Spare no. - 1.06
Spare no. - 1.07
Spare no. - 1.08
Spare no. - 1.09
Spare no. - 1.10
2 years Normal operational & maintenance spares (as per vendor recommendation) for details as per BOQ-1, item Sr No 2.1 & 2.2 (Spare no. - 2.01 (Mention the spare name and Qty in unpriced schedule)
Spare no. - 2.02
Spare no. - 2.03
Spare no. - 2.04
Spare no. - 2.05
Spare no. - 2.06
Spare no. - 2.07
Spare no. - 2.08
Spare no. - 2.09
Spare no. - 2.10
2 years Normal operational & maintenance spares (as per vendor recommendation) for details as per BOQ-1, item Sr No 3.1 & 3.2 (Spare no. - 3.01 (Mention the spare name and Qty in unpriced schedule)
Spare no. - 3.02
Spare no. - 3.03
Spare no. - 3.04
Spare no. - 3.05
Spare no. - 3.06
Spare no. - 3.07
Spare no. - 3.08
Spare no. - 3.09
Spare no. - 3.10
Description of Work / Item(s)
Addition/Deletion rate for outgoing feeder 32A MCB
Addition/Deletion rate for outgoing feeder 16A MCB
Addition/Deletion rate for unit board
Addition/Deletion Rates for items not listed above as per bidder (Item name to be mentioned in unpriced BOQ)
Addition/Deletion Rates for items not listed above as per bidder (Item name to be mentioned in unpriced BOQ)
Addition/Deletion Rates for items not listed above as per bidder (Item name to be mentioned in unpriced BOQ)
Addition/Deletion Rates for items not listed above as per bidder (Item name to be mentioned in unpriced BOQ)
Addition/Deletion Rates for items not listed above as per bidder (Item name to be mentioned in unpriced BOQ)
Masstech Controls Pvt. Ltd. (BID ID -1087867)
CHHABI ELECTRICALS PRIVATE LIMITED (BID ID -1087738)
CHHABI ELECTRICALS PRIVATE LIMITED (BID ID -1087738)
VERTIV ENERGY PRIVATE LIMITED (BID ID -1090106)
CHHABI ELECTRICALS PRIVATE LIMITED (BID ID -1087738)
VERTIV ENERGY PRIVATE LIMITED (BID ID -1090106)
Spare no. - 1.07
Addition/Deletion rate for outgoing feeder 32A MCB
Spare no. - 1.02 (Mention the spare name and Qty in unpriced schedule)
Addition/Deletion rate for outgoing feeder 16A MCB
2 years Normal operational & maintenance spares (as per vendor recommendation) for details as per BOQ-1, item Sr No 1.1 & 1.2 (Spare no. - 1.01 (Mention the spare name and Qty in unpriced schedule)
Addition/Deletion Rates for items not listed above as per bidder (Item name to be mentioned in unpriced BOQ)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf