| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC 16 RAJENDRA MULLICK STREET JORASANKO KOLKATA KOLKATA KOLKATA 700007 | KOLKATA | WEST BENGAL | 700007 | ₹4.0 L | L1 | Accepted-AOC W/O ISSUED |
| 2 | L2₹4.1 LRejected-Finance 3 1 120 ANANDA PALIT ROAD ADJACENT AREA IN WARD NO 55 | KOLKATA | WEST BENGAL | 700001 | ₹4.1 L | L2 | Rejected-Finance 2nd lowest bidder |
| 3 | L3₹4.2 LRejected-Finance | ₹4.2 L | L3 | Rejected-Finance 3rd lowest bidder |
Tender Value
₹4.0 L
EMD Value
₹8,000
Closing Date
29 Jan 2026, 11:00 amClosed
EE(BR V)
22 SURYA SEN STREET KOL 12
DEVELOPMENT OF ROAD SURFACE WITH CONCRETE BLOCK (PORTION) AT KASHINATH MALLICK LANE (NEAR M.G. ROAD) IN WARD NO-43, UNDER BOROUGH-V
2026_KMC_990126_1
KMC/EE(C)/Br-V/43/42/25-26/2ND
Open Tender
CIVIL WORKS
21 days
WARD-43
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹8,000
19 Feb 2026
17 Jan 2026
31 Jan 2026
17 Jan 2026
29 Jan 2026
17 Jan 2026
CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.29Hire charges for engaging Air Compressor machine with minimum pressure capacity of 5.0 Kg/sq.cm arrangement including all necessary equipments and operating staff, carriage, fuel, Tools and plants all complete for cutting Road / hard crust cutting with pneumatic hammer at desired point in water supply works as per direction of EIC . a) With Pneumatic hammers For minimum engagement of 8 hrs. In a day
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018)
Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone.
Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone.
Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 350mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-divider / footpath)
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone.
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) Vertical Kerb
Supplying, fitting and fixing in position reinforced cement polymer concrete manhole / gully pit cover with matching frame as per I.S. 12592 (M.D.) i) 15 MT load bearing capacity gully pit cover with frame and hinge arrangement for opening of size Cover : 565 mm. X 410 mm. X 90 mm. Frame : 715 mm. X 565 mm. X 185 mm. Weight : 140 Kg. (approx.)
SANITARY AND DRAINAGE WORKS (B)-(IV)INSPECTION PIT,SEPTIC TANK,SOAK PIT ETC.8.Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S-12592(M.D) (i) 35 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size.Cover: 700 mm X 100 mm Frame: 910 mm X 185 mm opening: 560mm Weight: 245 kg (approx)
ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018)
Supplying and Laying in the specified pattern of Interlocking Concrete Block Pavements (ICBP) with concrete blocks (with concrete grade as specified as per Table 1 of IS 15658 : 2006) manufactured in steel mould clamped to a vibrating table by hydraulic pressure (as per cl. no. 6.30 of IRC: SP: 63 (2018), from BIS licensee manufacturer, with spacer nib (Small protruding profiles on the vertical face of a paver block used as a device for keeping minimum joint gap in between the paving blocks, as per Cl. No 3.26 of IS: 15658)and of specified size and shape with aspect ratio (The ratio of length to thickness of a paver block, as per CLNo.3.3 of IS: 15658) as per Table of IS :15658 with flexural strength/breaking load as per Annexure G of IS: 15658, on the prepared base course of specified CBR as per Table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with a cushion of compacted bedding sand of 25-35 mm thick (grading of the bedding sand as per clause 6.5.1 of IRC SP 63) and filling up the gaps in between paver blocks with joint filling sand (the grading of the joint filling sand will be as per clause 6.5.2 of IRC SP 63) and completing the edges with cut blocks us per Cl. No. 8.7 of IRC SP-63(2018) with proper confinement of bedding and joint filling sand, compaction levelling and filling up of the edge gap. 100 mm thick. a) Grey (12th Corrigenda & addenda dated14.10.2020)
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(iii) 150 mm
BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018)
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth. ( 3rd Corrigenda & addenda dated 04.06.2018)
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster(3rd Corrigenda & addenda dated 04.06.2018)
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
Estimated amount
Add: 9%SGST
Add: 9%CGST
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Tendernotice_3.pdf
PDF • 0.83 MB
Tendernotice_4.pdf
PDF • 0.82 MB
BOQ_2419816.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid