Loading…
Loading…
Tender Value
₹12.2 L
EMD Value
₹24,000
Closing Date
28 Jul 2026, 5:00 pm2d left
EE Saryu Nahar Khand-1 Balrampur
EE Saryu Nahar Khand-1 Balrampur
CONSTRUCTION OF R.C.C CULVERT AT KM 2.200 OF BHARATPUR MR.
2026_UPIDC_1171159_7
01/EE/2026-27
Open Tender
Civil Works
Item Wise
180 days
Balrampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹24,000
Yes
22 Jul 2026
22 Jul 2026
29 Jul 2026
22 Jul 2026
28 Jul 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work by transport earth up to 1 km.including excavation loading unloanding & manual compaction and dressing etc required for proper complection of work as per direction of engineer incharge. | - | Cum. | - | - |
| 2 | Dry brick on edge soling with first Class brick and prepration of sub grade and joints filled with local sand or sandy soil, including all cost of material, labour, T & P etc. required for proper complection of work as per direction of engineer incharge | - | Sqm | - | - |
| 3 | Supply & fixing caution sign board ISA40x40x05mm size 1.20x2.10m. and 1.50mm thick M.S. plate, painting caution letter, including all cost of material, labour, T & P etc. required for proper complection of work as per direction of engineer incharge | - | No. | - | - |
| 4 | Earth work in excavation in foundation of masonry work in all type of soil including all lead and lift with disposal of earth required for proper complection of work as per direction of engineer incharge | - | Cum. | - | - |
| 5 | Laying P.C.C. M-10 (1:3:6) mix. in foundation with Kabrai crushed stone grite 4.75 mm to 40 mm size & coarse sand of F.M. not less than 2.0, including all cost of material, labour, T & P etc. required for proper completion of work,Work done as per direction of E/I. | - | Cum. | - | - |
| 6 | Laying R.C.C. M-20 (1:1.5:3) mix with Kabrai crushed stone grit graded 4.75 to 20 mm size with coarse sand of F.M. not less then 2.0; including all cost of material, labour T & P etc. required for proper complection of work as per direction of engineer incharge | 28.54 | Cum. | - | - |
| 7 | Centering and shuttering for R.C.C.work; including all cost of material, labour, T & P etc. required for proper complection of work as per direction of engineer incharge | 110.1 | Sqm | - | - |
| 8 | Cutting, bending, binding and placing of steel reinforcementin R.C.C. work; including all, cost of steel, binding wire,labour, T & P etc. required for proper complection of work as per direction of engineer incharge | 2.31 | MT | - | - |
| 9 | Earth work in back filling of foundation up to ground level in all type of soil, including all lead & lift, all cost of material, labour, T & P etc. required for proper complection of work as per direction of engineer incharge | 84.63 | Cum | - | - |
| 10 | Dismantling of old & damaged brick on edge soling and stacking of brick as per direction of engineer-in-charge;including all cost of labours, T & P etc. required for proper complection of work as per direction of engineer incharge | - | Sqm. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_2198332.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].