Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹8.3 Craccepted-aoc | ₹8.3 Cr | accepted-aoc |
Tender Value
₹8.0 Cr
EMD Value
₹11.9 L
Closing Date
29 Apr 2026, 9:30 pmClosed
Minor Irrigation Department
ALWYN AGERA
Improvement works to upstream and downstream of Nagaramata vented dam in Hosala village of Barkuru gram panchayath limit in Brahmavara taluk of Udupi district.
MI/2025-26/DA/WORK_INDENT11557
MI/2025-26/DA/WORK_INDENT11557
Open
Dam and Allied works
Two Tender Document System(Two Cover)
Minor Irrigation Division Mangalore
7 documents required · 7 mandatory
Contractor Registration Certificate
3.2 (c) Executed in any one financial year the minimum quantities of work, Earthwork in both excavation and embankment (combined quantities): 35,725.00 Cum, Filter media:2,714.00 Cum, Pitching/Revetment:5,522.00 Cum, Rubble stone/boulder filling: 3,917.00 Cum
3.2 (b)Satisfactory completion (at least 90% of the contract value) as a prime contractor at least one similar work such as Riverbank protection work of value not less than Rs. 397.96 Lakhs.
3.2 (a)To qualify for award of this contract each tenderer in his name should have in the last five years period. (a) achieved in at least 2 financial years a minimum financial turn over ( in all classes of civil engineering construction works only) of Rupees. 1,061.24 lakhs (usually not less than two time the estimated annual payments under this contract)
3.3(b)liquid assets and /or availability of credit facilities of not less than Rs.266.33 Lakhs (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc. for works costing Above Rs.100.00 lakhs).
Details of works already Tendered for
Details of Ongoing Works
Availability of Project Engineer And Organization Chart
3.3 (a) Availability by owning at least 50% of the required/specified key and critical equipment for this work and the remaining 50% can be deployed on lease/hire basis for all works provided the relevant documents (Recent RC copy, Vehicle Permit, Recent Insurance copy, Purchase bill or hire/ lease agreement detail etc.,) for availability for this work are furnished Excavator : 2 Nos (1 Nos. Own and 1 Nos. Hire/Lease), Tipper/ Lorry : 6 Nos (3 Nos. Own and 3 Nos. Hire/Lease)
Affidavit
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
₹5,000
₹11.9 L
29 Apr 2026
16 Apr 2026
30 Apr 2026
28 Apr 2026
24 Apr 2026
3 3 3rd month 4th month 5th month 6th month 7th month 8th month 9th month 10th month 11th month 12th month 13th month 14th month 15th month 16th month 17th month 18th month Total Amount
WORK DONE CERTIFICATE
Name of the Department
Name of Division
1 Name of work :
2 Estimated Cost :
3 Agreement No. :
4 Name of Contractor :
5 Tendered cost :
6 Date of work order :
7 Stipulated period of completion :
8 Intended date of Complition :
9 Final Date of completion, (For completed work) :
10 Revised amount of work (including claims/extra/arbitration amount,if any) :
11 Cost of work executed :
12 Balance cost of work :
13 Whether final bill is paid :
14 Reasons for non completion of work in schedule period of completion :
15 Whether any penalties fine/stop notice/compensation/liquidated damage imposed/Imposed & canceled :
a) Earth Excavation :
b) Embankment :
c) Providing & laying M-15 :
d) Providing & laying M-10 :
f) Rubber & Earth Filling :
g) Providing & laying M-20
16 Remarks of the Engineer performance of the Contractor working style quality consciousness tendency of claims :
Divisional Officer
Programme of work
Name of work: Improvement works to upstream and downstream of Nagaramata vented dam in Hosala village of Barkuru gram panchayath limit in Brahmavara taluk of Udupi district.
MI/2025-26/DA/WORK_INDENT11557
SNo Item Name Unit Estimate Quantity Rate Amount 1st Month 2nd Month 3rd Month 4th Month 5th Month 6th Month 7th Month 8th Month 9th Month 10th Month 11th Month 12th Month 13th Month 14th Month 15th Month 16th Month 17th Month 18th Month Total Amount
Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer In area of light jungle complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. 100 Sqm 55.080 440.16 24244.01 30.00 13204.80 25.08 11039.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24244.01
2 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m. complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 7344.000 114.24 838978.56 450.00 51408.00 90.00 10281.60 90.00 10281.60 90.00 10281.60 90.00 10281.60 490.00 55977.60 535.00 61118.40 535.00 61118.40 535.00 61118.40 500.00 57120.00 500.00 57120.00 490.00 55977.60 490.00 55977.60 495.00 56548.80 490.00 55977.60 485.00 55406.40 495.00 56548.80 494.00 56434.56 838978.56
3 Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification. complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 59640.100 508.48 30325798.05 3400.00 1728832.00 450.00 228816.00 450.00 228816.00 450.00 228816.00 450.00 228816.00 4100.00 2084768.00 6550.00 3330544.00 6550.00 3330544.00 6550.00 3330544.00 3700.00 1881376.00 3650.00 1855952.00 3600.00 1830528.00 3550.00 1805104.00 3500.00 1779680.00 3550.00 1805104.00 3500.00 1779680.00 3550.00 1805104.00 2090.10 1062774.05 30325798.05
4 Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.Boulder Laid Dry Without Wire Crates. Complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 7344.000 2141.44 15726735.36 400.00 856576.00 50.00 107072.00 50.00 107072.00 50.00 107072.00 50.00 107072.00 500.00 1070720.00 832.00 1781678.08 832.00 1781678.08 832.00 1781678.08 550.00 1177792.00 500.00 1070720.00 420.00 899404.80 400.00 856576.00 420.00 899404.80 420.00 899404.80 400.00 856576.00 400.00 856576.00 238.00 509662.72 15726735.36
5 Providing and constructing vertical /inclined graded filter media using clean, hard graded sand and coarse aggregates from approved source satisfying specified filter criteria in layers of specified thickness including cost of all materials, machinery, labour, laying to required slopes, compacting and all other ancillary operations complete as per specifications and approved drawings.40 mm down graded coarse aggregate layer.Complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 5088.150 2022.72 10291902.77 270.00 546134.40 20.00 40454.40 20.00 40454.40 20.00 40454.40 20.00 40454.40 350.00 707952.00 575.00 1163064.00 575.00 1163064.00 575.00 1163064.00 430.00 869769.60 400.00 809088.00 330.00 667497.60 310.00 627043.20 260.00 525907.20 250.00 505680.00 250.00 505680.00 250.00 505680.00 183.15 370461.17 10291902.77
6 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Stone/Boulder. Complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 10353.640 2141.44 22171698.84 400.00 856576.00 110.00 235558.40 110.00 235558.40 110.00 235558.40 110.00 235558.40 690.00 1477593.60 1180.00 2526899.20 1180.00 2526899.20 1180.00 2526899.20 800.00 1713152.00 780.00 1670323.20 750.00 1606080.00 700.00 1499008.00 600.00 1284864.00 500.00 1070720.00 500.00 1070720.00 500.00 1070720.00 153.64 329010.84 22171698.84
7 Providing and laying Reinforced Cement Concrete pipe light duty NP2 for culverts, roadway utilities& crossingsas per IS 458:2003 in Single row including pointing ends and fixing collars with cement mortar 1:2 including cost of all materials, labour, curing completeas per specifications.600 mm dia.Complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. m 100.000 2134.72 213472.00 0.00 0.00 0.00 20.00 42694.40 0.00 20.00 42694.40 0.00 20.00 42694.40 0.00 20.00 42694.40 0.00 20.00 42694.40 0.00 0.00 0.00 0.00 0.00 0.00 213472.00
EW/embankment 66,984.10 35,725.00 Cum
Filter media 5,088.15 2,714.00 Cum
Pitching/Revetment 10,353.64 5,522.00 Cum
Rubble stone/boulder filling 7,344.00 3,917.00 Cum
1,920,280.81 WD 39,796,414.80 397.96 Executive Engineer,
milestone 1 6,595.00 6,600.00 1,909,241.60 EMD 1,193,892.44 1,194,000.00 M.I. & GWD Division, Mangaluru
Format for 3.2 (b)
SI.No Name of Work Estimated cost Tendered cost Cost of work executed Cost of work to be executed Date of agreement Stipulated period of completion Scheduled date of completion
Divisional Officer
Note:- The statement showing the value of existing commitments and On - Going works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the employer in charge, not below the rank of an Executive Engineer or equivalent.
Financial Turnover
Criteria Financial Year Value in Rs
Total value of civil engineering construction works executed and payments received in the last five years (in Rs. Lakhs) (Attach Certificate from Chartered Accountant and corresponding Balance sheet) 2021-22
Work performed as Prime Contractor (in the same name) on works of similar nature
Project Name Name of Employer Description of Work Contract Number Value of contract Rs. Lakhs Date of issue of work order Specified period of completion Actual date of completion Remarks explaining reasons for delay in completion of work
Quantities of work executed as prime contractor (in the same name)
Year Name of Work Name of Employer Quantity of work performed Remarks (Indicate contract reference)
Earthwork in both excavation and embankment (combined quantities) in Cum Filter media in Cum Pitching/Revetment in Cum Rubble stone/boulder filling in Cum
Existing commitments and on-going works
Description of work Place and State Contract No and Date Name & Address of Employer Value of Contract (Rs. lakhs) Stipulated period of completion Value of works remaining to be completed (Rs. lakhs) Anticipated date of completion
Attach certificates from Employer
Works for which Tenders already submitted
Description of work Place and State Name & Address of Employer Estimated Value of works (Rs. lakhs) Stipulated period of completion Date when decision is expected Remarks if any
Details of machinery
Item of Equipment Requirement Owned and available Remarks
No. Capacity Owned Proposed to be leased Number/ Capacity Age/Condition
Excavator (2 Nos) 2 (1 No. Own and 1 No. Hire/Lease)
Tipper/ Lorry (6 Nos) 6 (3 No. Own and 3 No. Hire/Lease)
Information on litigations in which the Tenderer is involved
Other Party (ies) Employer Details of dispute Amount involved Remarks showing present status
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Price adjustment.pdf
Others - Price adjustment • 2.52 MB
11557_bar_chart.xls
Others - Bar Chart • 0.04 MB
Work done format.xls
Others - Work done format • 0.05 MB
11557_programme_of_work.xlsx
Others - Program of work • 0.30 MB
11557_kw-4_bid_document.doc
Tender Document • 2.07 MB
E Payment.doc
Others - E Payment • 0.22 MB
LOC format.pdf
Others - LOC format • 0.35 MB
Royalty GO.pdf
Others - Royalty GO • 0.06 MB
General specifications.pdf
Instructions to Tenderers • 0.57 MB
Format for 3 2b.xls
Others - Format for 3 2b • 0.01 MB
Insurance surety Bond format.pdf
Others - Insurance surety Bond format • 0.43 MB
Labour GO.docx
Others - Labour GO • 0.98 MB
11557_formats_1to_7.xlsx
Others - Formats • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .