| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 CrAdmitted-Finance | +2.33% | ₹3.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.6 Cr+₹67.3 L (17.3%)Admitted-Finance | +20.00% | ₹4.6 Cr+₹67.3 L (17.3%) | L2 | Admitted-Finance |
Tender Value
₹3.8 Cr
EMD Value
₹7.6 L
Closing Date
1 Jul 2026, 6:00 pmClosed
ACE, PWD Zone-II Udaipur (Banswara)
ACE, PWD Zone-II Udaipur (Banswara)
Strengthening and Widening of Chhotisadri Road to 1/A Dhawata RIICO Area Road
2026_CEPWD_566539_1
ACE, PWD Zone-II, Udaipur(Basnwara) NIT 03/2026-27
Open Tender
Civil Works
Percentage
240 days
Pratapgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
EE, PWD Dn I Pratapgarh by eGRAS Challan
₹7.6 L
Yes
ACE, PWD Zone-II Udaipur (Banswara)
10 Jul 2026
10 Jun 2026
2 Jul 2026
10 Jun 2026
1 Jul 2026
10 Jun 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SETTING OUT, CLEARING & GRUBBING & SCARIFYING | - | - | - | - |
| - | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means (A) Bituminous Courses | 166.39 | Cum | 69 | ₹11,480.74 |
| - | Construction of Foundation / Inaugration Pedastal in 23 cm thick Brick masonry in CM 1:4 of size 1.20m x 1.80m above ground level with adequate foundation including providing and fixing of Granite stone of size 0.75m x0.60m with engraving letters and figures,cement plaster,white washing etc. complete as per direction of Engineer in charge. | 2 | Each | 9,547 | ₹19,094 |
| - | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Mechanical Means In area of non-thorny jungle | 2 | Hect. | 10,374 | ₹20,748 |
| - | (PART-A) SETTING OUT, CLEARING & GRUBBING Total = | - | - | - | - |
| - | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 5,091.15 | Cum | 25 | ₹1,27,278.75 |
| - | Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per MoRTH Specification Clause 301.3.5 | 1,562.51 | Cum | 36 | ₹56,250.36 |
| - | Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross-sections, loading and disposal of cut rock with a lift upto 1.5 m and leads upto 1000 m as per MoRTH Specification Clause 301.3.5 | 260.42 | Cum | 140 | ₹36,458.8 |
| - | Excavation in Hard Rock (blasting prohibited) Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per MoRTH Specification Clause 301.3.5 Mechanical Means | 260.42 | Cum | 188 | ₹48,958.96 |
| - | Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300- 1 and 300-2 as per MoRTH Specification Clause 305.3 | 2,667.47 | Cum | 33 | ₹88,026.51 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_1007932.xls
BOQ • 0.33 MB
Potential_BID_RIICO.pdf
Tender Documents • 1.80 MB
Special_Condition_Along_with_RPWA_100.pdf
Tender Documents • 5.62 MB
AgreementUptodate21042025.pdf
Tender Documents • 29.77 MB
NITCorrigendumGSTNIT03.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .