Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-AOC | ₹17.0 L | L1 | Accepted-AOC AOC issue |
| 2 | L1₹17.0 LRejected-Finance | ₹17.0 L | L1 | Rejected-Finance Not selected in lottery |
| 3 | L1₹17.0 LRejected-Finance | ₹17.0 L | L1 | Rejected-Finance Not selected in lottery |
| 4 | L1₹17.0 LRejected-Finance H NO 413 VILLAGE SULKHANI P O BUGANA 125121 | HISAR | HARYANA | 125121 | ₹17.0 L | L1 | Rejected-Finance Not selected in lottery |
| 5 | L1₹17.0 LRejected-Finance 12 30 126 A CHAMANLAL KI KUAN | ₹17.0 L | L1 | Rejected-Finance Not selected in lottery |
Tender Value
₹20.0 L
EMD Value
₹2.0 L
Closing Date
5 Jun 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer office, KNN, Motijheel
Repairing of ramp near chhoti karbla sooterganj in ward-75 sooterganj zone-4.
2026_NNKAN_1155305_1
904/AA-4/25-26
Open Tender
Civil Works
Percentage
60 days
ward-75, sooterganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹2.0 L
22 Aug 2026
30 May 2026
5 Jun 2026
30 May 2026
5 Jun 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5 m in width as well 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m | 260.15 | cum | 174 | ₹45,266.1 |
| 2 | Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering, 1:6:12 (1 cement: 6 aggregate 400mm (nominal size) | 29.78 | cum | 4,380 | ₹1,30,436.4 |
| 3 | Providing & laying in position specified grade of reinforced cement cocrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level: 1:15:3(1 cement: 1.5 coarse sand: 3 graded stone | 29.44 | cum | 7,590 | ₹2,23,449.6 |
| 4 | Reinforced cement concrete work in beam, suspended floors, roofs having slope up to 15" landing, bolconies, shelves, chajjas, lintels, bands plain window sills, stair | 1.03 | cum | 8,720 | ₹8,981.6 |
| 5 | Reinforced cement cocrete work in walls (any thickness), including attached pilasters, buttreses, plinth and string courses, fillets & in coloumns, pillars, piers, abutments, posts and struts etc | 0.86 | cum | 8,600 | ₹7,396 |
| 6 | Steel reinforcement for R.CC work including straightening, cutting, bending, placing in position and binding all Providng & fixing 18mm thick granite (gang saw cut), mirror polished premoulded and prepolished, machine cut for | 2,459.41 | kg | 72 | ₹1,77,077.52 |
| 7 | Providng & fixing 18mm thick granite (gang saw cut), mirror polished premoulded and prepolished, machine cut for | 4.15 | sqm | 3,500 | ₹14,525 |
| 8 | Brick work with common burnt clay (non modular) bricks of class-150 in super structure above plinth level up to floor V level in all shapes and sizes cement mortar 1:4 (1 cement: 4 coarse sand) | 37.56 | cum | 7,500 | ₹2,81,700 |
| 9 | 12mm cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement on the rough side of single of half brick wall | 105.45 | sqm | 200 | ₹21,090 |
| 10 | Finishing walls with Putty approved brand and manufacture and of required shade on umdacorated wall surface to give | 105.45 | sqm | 135 | ₹14,235.75 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2164210.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.41 MB
BOQ_2164210.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .