Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 5 255 H E B COLONY SALAIPUDUR | MADURAI | TAMIL NADU | Admitted-Finance |
| 2 | Rejected-Technical | Rejected-Technical Conditions not satisfied |
| 3 | Rejected-Technical NO 1 PALLAKINATHU STREET AVANIYAPURAM MADURAI 12 | MADURAI | MADURAI | TAMIL NADU | Rejected-Technical Conditions not satisfied |
Tender Value
Refer Docs
EMD Value
₹38,000
Closing Date
9 Dec 2020, 2:00 pmClosed
SE/GCC/Madurai
SE/GCC/MADURAI
Construction 110KV control room building upto Roof level Transformer Plinth Theriruveli 110KV SS
2020_EB_186654_1
SE-GCC-MDU SPEC.NO.025/2020-21
Open Tender
Civil Works - Buildings
Works
90 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
Yes
THE SUPERINTENDING ENGINEER/GCC/MADURAI
₹38,000
Yes
24 Dec 2020
2 Dec 2020
10 Dec 2020
2 Dec 2020
9 Dec 2020
2 Dec 2020
Amount
Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete.
Supplying and filling of river sand in foundation and basement with well water and consolidation as per specn.incliding cost of all materials labour, lead, lift, etc., complete.
PCC 1:4:8 mix using 40mm HBS machine crushed metal for foundation with out formwork including cost of all labour, materials, lead, lift, curing, etc., complete. Using SRC cement
RCC M25 using 12-20 mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing all labour charges, lead, lift etc., complete. But excluding cost of steel reinforcement. For Column Footing concrete.
RCC M25 using 12-20 mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing all labour charges, lead, lift etc., complete. But excluding cost of steel reinforcement. For Column concrete.
Refilling the foundation with excavated earth including ramming as per specification , cost of all materials lead and lift etc. complete.
RCC M25 mix using 12 mm to 20 mm HBS metal (Machine crushed) for Grade beam with form work including cost of cement all labour, materials, lead, lift etc., complete.
RCC M25 mix using 12 mm to 20 mm HBS metal (Machine crushed) for Plinth beam with form work including cost of cement all labour, materials, lead, lift etc., complete.
Providing PCC 1:5:10 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Floor PCC.
Brickwork in CM 1:5 mix using II class chamber brick of size 9"x 4 3/8" x 2 3/4" for bath, fol, brick on edge, partition wall, superstructure including cost of labour materials, curing, lead, lift, etc., complete.
Brickwork in CM 1:3 mix using II class champer bricks of size 9"x 4 3/8"x2"3/4" for super structure including cost of all materials, labour, lead, lift, curing, etc., complete.
Supply & filling of red gravel in gravel in form and basement with well water & consolidation as per specification including cost of all materials, labour, lead, lift etc., complete.
RCC M25 mix using 12 to 20mm HBS metal (machine crushed) for contineous lintel, tier slab and bed block, cover slab for staircase slab, water tank slab with formwork including cost of all materials, lead, lift, etc., complete.(by using mixer machine).
RCC M25 mix using 12 to 20mm hbs metal (machine crushed) for Sun shade 60cm. Projection 80 mm thick at wall end and 50 mm thick at free end and loft, with form work including cost of all materials, labour, leas, lift, etc., complete. (by using mixer machine).
RCC M25 using 12-20mm HBS metal (machine crushed) metal for " T " beam, with centering shuttering including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement
RCC M25 using 12mm to 20 mm hbs metal (machine crushed) for roof slab concrete of 150 mm thick with formwork including cost of all materials, labour, lead, lift, centering shuttering , curing, etc., complete. But excluding cost of steel reinforcement.
RCC M25 using 12mm to 20 mm hbs metal (machine crushed) for roof slab concrete of 125 mm thick with formwork including cost of all materials, labour, lead, lift, centering shuttering , curing, etc., complete. But excluding cost of steel reinforcement.
RCC M25 using 12mm to 20 mm hbs metal (machine crushed) for roof slab concrete of 100 mm thick with formwork including cost of all materials, labour, lead, lift, centering shuttering , curing, etc., complete. But excluding cost of steel reinforcement.
Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
Plastering with CM. 1:3 mix 12mm thick for ceiling,fol, bath, rcc pillars, sunshade, loft, etc., including cost of materials, labour, lead, lift, watering, curing, etc., complete.
Supplying & fixing of M.S. rail (90 IBS) for transformer plinth including cost of rail, cutting the rail to the required length and welding grip rods for the rails, transport charges, labour for fixing and handling, T & P etc., complete.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .