Tender Value
₹9.3 L
EMD Value
₹93,000
Closing Date
13 Feb 2023, 1:00 pmClosed
Executive Engineer
Irrigation Division, Firozabad
Reconstruction of V.R.B. at km. 46.881 of Firozabad dy.
2023_UPIDC_771698_4
12/EE/2022-23
Open Tender
Civil Works
Item Wise
45 days
Reconstruction of V.R.B. at km. 46.881 of Firozaba
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
Executive Engineer
₹93,000
16 Mar 2024
4 Feb 2023
13 Feb 2023
4 Feb 2023
13 Feb 2023
4 Feb 2023
Amount
Earth work in Foundation in ordinary soil including lift upto 1.5m and lead upto 30.0m with cutting earth disposal of directed by engineer in charge including all cost of Labour,Machine,T&P etc.complete.
Dismantling of stone or Brick masonary in cement mortar including stacking of dimantled material with in a distance of 60m.
Dismantling Reinforced Cement Concrete work with disposal of refuse within a distance of 60m.
Providing concrete for plain concrete M 15 grade in foundations including cost of centering, shuttering,finishing and excluding reinforcement in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete ,including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST.
Providing concrete forreinforced concrete M20 grade in foundations including cost of centering, shuttering,finishing and excluding reinforcement in 1:1.5: 3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST.
Providing concrete forreinforced concrete M25 grade in foundations including cost of centering, shuttering,finishing and excluding reinforcement in 1:1: 2(1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST.
Bricks Masonry in 1:4 cement coarse sand mortar in foundation and plinth Including All Cost of Labour , Material,T&P , Etc. Complete.
Plaster in cement Coarse sand mortar (1:4) including raking of joint ,smooth finishing with & curing etc. including all leads of all construction matarial complete of thickness 12.5mm
Ordinary centring and shuttering for C.C/R.C.C. work
Centering and shuttering in special type of RCC work Shuttering For Bridge Slabup toe 3M span including line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc.
Supplying,cutting binding and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications , for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding GST.
laying stone grit in 20cm thickness
Finishing walls with exterior emulsion Paint(Apex) of approved brand and manufacture and of require shade on undecorated wall surface to give even shade over @1.25ltr/10sqm including one coat of primer [email protected] Ltr/10sqm coat curing and cost of all material, labour,T&P etc. required for proper completion of work for two coat.
Supplying & laying of 1000 mm R.C.C.UME pipe At Site For water way On the bed of canal
Providing & Fixing MS sign Board as per required design & Drawing
M/s KELA DEVI METAL STORE AND CONTRACTOR
PADAM SINGH
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .