| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.3 LAccepted-AOC | ₹33.3 L | L1 | Accepted-AOC ist |
| 2 | L2₹34.5 L+₹1.3 L (3.86%)Rejected-AOC | ₹34.5 L+₹1.3 L (3.86%) | L2 | Rejected-AOC 2nd |
| Sl No | Description | Qty | Unit | ACE BUILDERS L1 | M/S SOKHAL CONSTRUCTION CO L2 |
|---|---|---|---|---|---|
| 1.00 | DISMANTLING Scraping White wash and colour wash | 1,395.12 | Sq.mtr | 6.75 ₹9,417.06 Lowest | 7.01 ₹9,779.79 |
| 2.00 | Removing Doors and Windows (Steel or wood) with chowkhats by making recesses in walls when the wall is not to be dismantled. Doors of area and below. | 2 | Each | 1.2 ₹2.4 Lowest | 223.2 ₹446.4 |
| 3.00 | Dismantling brick or flagged stone flooring without concrete base. | 301.58 | Sq.mtr | 27 ₹8,142.66 Lowest | 28.02 ₹8,450.27 |
| 4.00 | Dismantling of brick work in cement sand mortar / lime mortar including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 metre (By Mechanical
Means) | 32.1 | Cum | 637.2 ₹20,454.12 Lowest | 660.55 ₹21,203.66 |
| 5.00 | Finishing walls with cement based water soluble exterior paint such as snowcem, robbiacem etc. two or more coats to give an even shade | 1,785.84 | Sq.mtr | 77.1 ₹1,37,688.26 Lowest | 80.07 ₹1,42,992.21 |
| 6.00 | Painting two or more coats with synthetic enamel paints in all shades on old wood work or metallic or plastered or concrete surface to give an even shade including rubbing down old paint. | 95.12 | Sq.mtr | 62.6 ₹5,954.51 Lowest | 64.05 ₹6,092.44 |
| 7.00 | Applying priming coat with metal primer on new steel or iron work including preparation of surface | 17.23 | Sq.mtr | 18 ₹310.14 Lowest | 25.28 ₹435.57 |
| 8.00 | Painting one coat with aluminum paint on old work to give an even shade | 17.23 | Sq.mtr | 32 ₹551.36 Lowest | 37.93 ₹653.53 |
| 9.00 | Preparation of plastered or concrete surface for painting (including sand papering the surface) using Acryllic Wall Putty by applying two or more coats to get required finish including priming coat to make an even surface before applying Acrylic wall putty on new plastered surface.Complete as per specifications | 106.36 | Sq.mtr | 113.7 ₹12,093.13 Lowest | 119.1 ₹12,667.48 |
| 10.00 | Distempering with Acrylic washable oil bound distemper( of approved
manufacture) two or more coats over one primary coat to give an even shade. | 106.36 | Sq.mtr | 71 ₹7,551.56 Lowest | 75.05 ₹7,982.32 |
Tender Value
₹36.4 L
EMD Value
₹72,734
Closing Date
6 Jul 2026, 10:00 amClosed
XEN UBDC GSP
Executive Engineer/Gurdaspur Canal and Ground Water Division,WRD, Punjab,Gurdaspur.
Estimate for repairing of boundary wall, outer paint of building and interlocking of pathway of Gurdaspur division office.
2026_WR_170948_1
128/110A
Open Tender
Civil Works - Canal
Item Rate
90 days
GURDASPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹72,734
13 Jul 2026
26 Jun 2026
6 Jul 2026
26 Jun 2026
6 Jul 2026
26 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DISMANTLING Scraping White wash and colour wash | 1 | Sq.mtr | - | - |
| 2 | Removing Doors and Windows (Steel or wood) with chowkhats by making recesses in walls when the wall is not to be dismantled. Doors of area and below. | - | Each | - | - |
| 3 | Dismantling brick or flagged stone flooring without concrete base. | 1 | Sq.mtr | - | - |
| 4 | Dismantling of brick work in cement sand mortar / lime mortar including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 metre (By Mechanical
Means) | - | Cum | - | - |
| 5 | Finishing walls with cement based water soluble exterior paint such as snowcem, robbiacem etc. two or more coats to give an even shade | 1 | Sq.mtr | - | - |
| 6 | Painting two or more coats with synthetic enamel paints in all shades on old wood work or metallic or plastered or concrete surface to give an even shade including rubbing down old paint. | - | Sq.mtr | - | - |
| 7 | Applying priming coat with metal primer on new steel or iron work including preparation of surface | - | Sq.mtr | - | - |
| 8 | Painting one coat with aluminum paint on old work to give an even shade | - | Sq.mtr | - | - |
| 9 | Preparation of plastered or concrete surface for painting (including sand papering the surface) using Acryllic Wall Putty by applying two or more coats to get required finish including priming coat to make an even surface before applying Acrylic wall putty on new plastered surface.Complete as per specifications | 1 | Sq.mtr | - | - |
| 10 | Distempering with Acrylic washable oil bound distemper( of approved
manufacture) two or more coats over one primary coat to give an even shade. | 1 | Sq.mtr | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.00 MB
BOQ_347892.xls
BOQ • 0.30 MB
BOQ_347892.xls
PDF • 0.32 MB
boqrar.pdf
PDF • 0.66 MB
128cori.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .